Decisions

24/11/2023 - Gateway 3 - Variation Decision for variations valued over £500,000 (Works) - Lomond Grove - Deed of Variation to the Works Contracts ref: 7995    Recommendations Approved

Approval of cost increase to main works

Decision Maker: Strategic Director of Finance

Decision published: 12/12/2023

Effective from: 20/12/2023

Decision:

That the Strategic Director of Finance:

 

1.  Approves a variation to the works contract for the development at Lomond Grove with Glenman Corporation Limited (Glenman) from £7,783,403 to £8,804,964 an increase cost of £1,321,561 for the reason noted in paragraphs 13 -14 (of the report), of which £956,116 is a retrospective approval.

 

2.  Notes the revised total scheme costs from £9,420,681 to £11,212,314 including land acquisition and on-costs further details of which are in the closed report.

 

3.  Notes a revised practical completion date of 22 May 2024, an additional 40 weeks.

 

4.  Notes an additional variation to the capital programme in the sum of £436,747 is required for the reason noted in paragraphs 46-47 (of the report).

 

Wards affected: Camberwell Green;

Lead officer: Rita Bailey


01/11/2023 - GW2 The Charter School East Dulwich phase 2 construction contract stage 2 ref: 7968    Recommendations Approved

Approval of the award of the stage 2 contract to construct  Phase 2 of The Charter School East Dulwich

 

 

Decision Maker: Strategic Director of Children and Adult Services

Decision published: 01/11/2023

Effective from: 09/11/2023

Decision:

That the Strategic Director of Children and Adult Services approves the award for the main works contract for Phase 2 of The Charter School East Dulwich to Neilcott Construction Limited for a contract sum of no more than £11,450,000 for a period of 50 weeks commencing on 27 November 2023, subject to the Department for Education confirming the funding.

 

Wards affected: Goose Green;

Lead officer: Claire Boadu


02/08/2023 - Client contributions debt write-off (£5k to £50k) ref: 7925    Recommendations Approved

The write-off of unrecoverable client contributions debt between £5k and £50k (Quarter 1 2023/24) was approved.

Decision Maker: Cabinet Member for Health and Wellbeing

Decision published: 04/08/2023

Effective from: 12/08/2023

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton


23/05/2023 - Gateway 3 – Cost Variation Decision - Temporary Accommodation - Contract 1 ref: 7869    Recommendations Approved

Approval for variation for cost increase.

Decision Maker: Strategic Director of Housing

Decision published: 23/05/2023

Effective from: 01/06/2023

Decision:

That the Strategic Director of Housing:

 

1.  Formalises his approval of the variation to the Temporary Accommodation Contract 1, refurbishment/conversion contract with Niblock (Builders) Limited (Niblock), varying the contract sum from £2,086,229 to £2,647,251, an increase of £561,022.

 

2.  Approves a variation to the contingency for the above contract, increasing the contingency from £104,311 to £132,363, an increase of £28,052.

 

3.  Notes the increase to estimated on-costs, including a 4% development allowance associated with the contract, as a result of the above requested approvals from £371,138 to £403,065 an increase of £31,927.

 

4.  Notes the increase of the total scheme costs from £2,561,678 to £3,182,679 resulting to a total scheme variation of £621,001.

 

5.  Notes that this report was considered at the Departmental Contract Review Board (DCRB) in July 2022 but was not sent for approval until May 2023.

 

Wards affected: Camberwell Green; Nunhead & Queen's Road; St Giles;

Lead officer: Michael Scorer


23/05/2023 - Gateway 3 – Cost Variation Decision Temporary Accommodation – Contract 3 ref: 7871    Recommendations Approved

Approval for variation for cost increase.

Decision Maker: Strategic Director of Housing

Decision published: 23/05/2023

Effective from: 01/06/2023

Decision:

That the Strategic Director of Housing:

 

1.  Formalises his pervious approval to the variation of theTemporary Accommodation Contract 3, refurbishment/conversion contract with Niblock (Builders) Limited (Niblock) at an additional cost of £593,073 varying the contract sum from £1,869,695 to £2,462,768.

 

2.  Approves a variation to the contingency for the above contract, increasing the sum by £29,653 varying the contingency from £93,485 to £123,138.

 

3.  Notes the increase to the estimated other on-costs, including 4% development allowance associated with the contract, from £246,278 to £481,261 resulting in a variance of £234,983.

 

4.  Notes the increase of the total scheme costs from £2,209,458 to £3,067,167 with a variance of £857,709.

 

5.  Notes that this report was considered at the Departmental Contracts Review Board (DCRB) in July 2022 and was not sent for approval until April 2023.

 

Wards affected: Old Kent Road; St Giles;

Lead officer: Michael Scorer


23/05/2023 - Gateway 3 - Variation Decision - Temporary Accommodation - Contract 2 ref: 7870    Recommendations Approved

Approval for variation for cost increase.

Decision Maker: Strategic Director of Housing

Decision published: 23/05/2023

Effective from: 01/06/2023

Decision:

That the Strategic Director of Housing:

 

1.  Formalises his previous approval of the variation to the Temporary Accommodation Contract 2, refurbishment/conversion contract with Niblock (Builders) Limited (Niblock) at an additional cost of £731,907 varying the contract sum from £1,883,406 to £2,615,313.

 

2.  Approves a variation to the contingency for the above contract, increasing the sum by £36,596, varying the contingency from £94,170 to £130,766.

 

3.  Notes the increase to the other on-costs, and 4% development allowance associated with the contract, from £247,691 to £528,318 resulting in a variance of £280,627.

 

4.  Notes the increase of the total scheme costs from £2,225,267 to £3,274,397, resulting in an increase of £1,049,130.

 

5.  Notes that this report was considered at Departmental Contract Review Board (DCRB) in July 2022 but was not sent for approval until April 2023.

 

Wards affected: Camberwell Green; Nunhead & Queen's Road; St Giles;

Lead officer: Michael Scorer


17/05/2023 - Gateway 2 - Contract Award Approval - Southwark Works Framework Appointment and initial Call-off Contracts approval ref: 7867    Recommendations Approved

Approval of the appointment of the Southwark Works Framework providers and initial call off contracts

Decision Maker: Chief Executive

Decision published: 17/05/2023

Effective from: 25/05/2023

Decision:

That the Chief Executive;

 

1.  Approves the establishment of the Southwark Works Framework Agreement, for a period of four years commencing 1 July 2023 with an estimated total contract value of £5,814,809, and agrees to the appointment to the framework of the providers specified in Table 1, paragraph 12 of this report.

 

2.  Approves the individual Call-off Contracts from the Southwark Works Framework and their values as set out in Table 2 (paragraph 13) for an initial period of two years from 1 July 2023, with the option to extend for a further two years the total value of all the Call-off Contracts for the initial two year period (1 July 2023 to 30 June 2025) is £2,907,404.

 

3.  Notes that no providers have been recommended a contract for lot 1a and that alternative plans are being developed for this target client group (young people with learning difficulties or disabilities), as set out in paragraph 15 of this report and approval for these plans will be sought via further Gateway reports in line with council Contract Standing Orders (CSOs).

 

Wards affected: (All Wards);

Lead officer: Danny Edwards


15/05/2023 - Gateway 3 - Variation Decision for variations valued over £500,000 (Works) - Works Contract for the New Homes Delivery programme - Tissington Court ref: 7866    For Determination

Approval of cost increase to main works

Decision Maker: Strategic Director of Housing

Decision published: 16/05/2023

Effective from: 24/05/2023

Decision:

1.  That a variation to the works contract for the New Homes Delivery programme for Tissington Court with Guildmore Limited in the sum of £767,841.32 be approved, making a revised total contract value of £14,227,628.01.

 

2.  That it be noted that other additional works costs of £239,281.74 for the district heating, £7,313.51 for the gas enclosure and the increased associated on costs of £156,851.18 have been approved outside of this Gateway (GW) 3 approval, which following approval of recommendation 1 above will increase the total scheme costs to £17,193,403.00 representing an increase of 7.3% from the total scheme costs noted in the GW 3 approval of £16,022,115.00 on 19 January 2023.

Wards affected: Rotherhithe;

Lead officer: Stuart Davis


10/05/2023 - Client contributions debt write-off (£5k to £50k) ref: 7865    Recommendations Approved

To authorise the write-off of unrecoverable client contributions debt between £5k and £50k (Quarter 4 2022/23).

 

Decision Maker: Cabinet Member for Health and Wellbeing

Decision published: 11/05/2023

Effective from: 19/05/2023

Decision:

That the write-off of £245,620.78 of debt as set out in Appendix 1 of the report be authorised.

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton


21/04/2023 - Culture Together Grants 2023/24 Funding Award Recommendations ref: 7860    Recommendations Approved

Allocation of Culture Celebration Grants and Culture Together Grants  2023/24

Decision Maker: Cabinet Member for Leisure, Parks, Streets and Clean Air

Decision published: 21/04/2023

Effective from: 29/04/2023

Decision:

That the recommendations for Culture Together Grants and Cultural Celebrations Fund Grants for 2023-24 as set out in paragraphs 39-40 and 52-53 of the report be approved.

 

Wards affected: (All Wards);

Lead officer: Michelle Walker


12/04/2023 - GW2 Integrated Community Equipment Service ref: 7853    Recommendations Approved

Approval of contract award for the provision of the integrated community equipment service

Decision Maker: Strategic Director of Children and Adult Services

Decision published: 12/04/2023

Effective from: 20/04/2023

Decision:

 

 

1.  That the award of a contract to Nottingham Rehab Limited (trading as NRS Healthcare) as part of the single supplier framework agreement for the provision of Integrated Community Equipment Services (ICES), which has been procured by the Royal Borough of Kensington and Chelsea (RBKC) as lead commissioner for the London Community Equipment Consortium be approved by the Strategic Director for Children and Adult Services.

 

2.  That the Framework Agreement for these services is planned to commence on 1 April 2023 for a period of five years, with an option to extend for a further two years (maximum term of seven years) at an annual cost to the council of £980,000, an estimated five year total cost of £4.9m and an estimated total cost, including extension of £6.8m for seven years be noted by the Strategic Director for Children and Adult Services.

 

3.  That the risk and/or impact of ongoing litigation as referenced within paragraphs 33-34 of this report be noted by the Strategic Director for Children and Adult Services.

 

4.  That the intended use of a fleet of electric vehicles, described in paragraph 64, to deliver the community equipment be noted by the Strategic Director for Children and Adult Services.

 

 

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton


24/03/2023 - GW3 Sexual and Reproductive Health Services ref: 7846    Recommendations Approved

To approve extension  of the sexual and reproductive health services  contracts with King’s College Hospital NHS Foundation Trust (KCH) and Guy’s and St Thomas’ NHS Foundation Trust (GSTT) for a period of one year from 1 April 2023 – 31March 2024

Decision Maker: Cabinet Member for Health and Wellbeing

Decision published: 28/03/2023

Effective from: 05/04/2023

Decision:

1.  That the extension of the use of the sexual and reproductive health services contract that Lambeth Council have with King’s College Hospital NHS Foundation Trust (KCH) for a period of one year from 1April 2023 – 31 March 2024 at an estimated value of £1,418,571 be approved.

 

2.  That the extension of the use of the sexual and reproductive health services contract that Lambeth Council have with Guy’s and St Thomas’ NHS Foundation Trust (GSTT) for a period of one year from 1 April 2023 – 31March 2024 at an estimated value of £2,897,368 be approved.

 

3.  That it be noted that a procurement strategy to commission these sexual and reproductive health services from 1 April 2024 will be brought forward for decision in summer 2023.

Wards affected: (All Wards);

Lead officer: Nick Sinclair


28/03/2023 - Contract for the Supply of Agency Workers: Gateway 2 Approval ref: 7841    For Determination

Contract award for the supply of agency workers

Decision Maker: Chief Executive

Decision published: 28/03/2023

Effective from: 28/03/2023

Decision:

 

That it be agreed that the Chief Executive in consultation with the Cabinet Member for Communities, Equalities and Finance:

 

1.   Approves the award of a contract for the supply of agency workers via Lot 1 of the Eastern Shires Purchasing Organisation (ESPO) framework Managed Services for Temporary Agency Resources (MSTAR3) to Matrix SCM Ltd commencing on 4 April 2023 for a period of three years and three months with service delivery commencing on 1 July 2023 at an estimated annual value of £38m.

 

2.   Approves the inclusion of an option to extend the contract for up to two years in one year increments, making a total estimated maximum contract value of £190.5m inclusive of the extensions.

 

3.   Notes that no fees will be payable to Matrix SCM Ltd until service delivery commences on 1 July 2023.

 

4.   Notes the large majority of contract spend will be paid by Matrix SCM Ltd to the agencies in their supply chain who provide temporary workers to the council.

 

Wards affected: (All Wards);

Lead officer: Althea Loderick


28/03/2023 - Bermondsey Street Streetspace Schemes ref: 7843    Recommendations Approved

To instruct officers to proceed with detailed design stages and any statutory requirements to implement the scheme.

Decision Maker: Cabinet Member for Leisure, Parks, Streets and Clean Air

Decision published: 28/03/2023

Effective from: 05/04/2023

Decision:

1.  That the 290 responses received in relation to the proposed street improvements on Bermondsey Street and the recommendations made by highways officers regarding the future of the scheme based on the consultation report in Appendix 1, further details in Appendix 2 and 3, and wider council policies be considered.

 

2.  That officers be instructed to proceed with detailed design stages and any statutory requirements to implement the scheme as shown in Appendix 4 of the report which supports the council’s Streets for People aspirations. 

 

3.  That it be noted that a further report will be brought to the cabinet member should the council receive objections at the statutory consultation stage.

 

Wards affected: London Bridge & West Bermondsey;

Lead officer: Caroline Bruce


28/03/2023 - Minor Traffic Schemes Batch 4 22/23 ref: 7845    Recommendations Approved

To implement non-strategic traffic and highway improvements and complementary streetspace measures

Decision Maker: Cabinet Member for Leisure, Parks, Streets and Clean Air

Decision published: 28/03/2023

Effective from: 05/04/2023

Decision:

That the non-strategic traffic and highway improvements and complementary streetspace measures, as detailed in the appendices to this report and summarised in Table 1, subject to the outcome of any necessary statutory consultation and procedures be approved for implementation.

Wards affected: Borough & Bankside; Camberwell Green; Chaucer; Dulwich Hill; Dulwich Village; Faraday; Nunhead & Queen's Road; Old Kent Road; Peckham; Rotherhithe; Rye Lane; St George's; Surrey Docks;

Lead officer: Dale Foden


20/03/2023 - E-scooter and E-bike parking stations ref: 7837    Recommendations Approved

To approve the experimental traffic management orders for implementation with e-scooter/e-bike parking stations

Decision Maker: Cabinet Member for Leisure, Parks, Streets and Clean Air

Decision published: 20/03/2023

Effective from: 28/03/2023

Decision:

That the Cabinet Member for Leisure, Parks, Streets and Clean Air (“Cabinet Member”) approves the making of an Experimental Traffic Management Order (“ETMO”) to implement parking stations for e-scooters and e-bikes as detailed in Appendix 1 of the report.

Wards affected: (All Wards);

Lead officer: John Wade


14/03/2023 - Approval of Publication of Closure Proposals for Townsend Primary ref: 7834    Recommendations Approved

To agree to publish proposals to close Townsend Primary School from the 31 August 2023 onwards.

 

Decision Maker: Deputy Leader and Cabinet Member for Children, Education and Refugees

Decision published: 14/03/2023

Effective from: 22/03/2023

Decision:

That it be agreed to publish proposals to close Townsend Primary School from the 31 August 2023 onwards.

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton


01/03/2023 - GW1 - Secure Children’s Home for London and Pan-London Commissioning Vehicle ref: 7821    Recommendations Approved

Approve joining a Pan-London Commissioning Vehicle for placements in a Secure Children's Home in London

Decision Maker: Strategic Director of Children and Adult Services

Decision published: 02/03/2023

Effective from: 10/03/2023

Decision:

1.  That approval for Southwark Council becoming a member of a not-for-profit company, limited by guarantee provisionally to be known as the Pan London Vehicle (PLV) with an estimate cost of £100,000 for membership up to 31 March 2028 be formally approved by the Strategic Director for Children’s and Adults’ Services.

 

2.  That it be noted by the Strategic Director for Children’s and Adults’ Services that the PLV will develop and then oversee the running of London’s secure children’s home provision for a five-year period from 1 April 2023 to 31 March 2028, with a break-point after three years once the refreshed business case has been developed as well as the service pricing structure, commissioning approach, operating model, practice mode and the Secure Children’s Home’s location is confirmed.

 

3.  That it be noted by the Strategic Director for Children’s and Adults’ Services that once the provision has launched, membership will be at a fixed annual cost of £20K (subject to inflation adjustment), unless an alternative model for funding the PLV, that does not require annual subscription, is agreed by members during the development phase and collaborate with other PLV members on future joint commissioning programmes.

 

4.  That approval for the Council’s in principle commitment to joint oversight, risk and or benefit sharing of the secure children’s home provision, through the PLV, for a five-year period to 31 March 2028 (with three-year break point), that includes the build, service development and service commissioning phases, subject to ratification after the revision of the Secure Children’s Home business case, and renewable on a ten yearly cycle thereafter, with break-point after five years.

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton


01/03/2023 - Camberwell and Dulwich Children and Family Centre - Grant Award ref: 7822    Recommendations Approved

The extension of the grant award to Dulwich Wood Primary School to operate the Camberwell and Dulwich Children and Family Centre be approved.

Decision Maker: Deputy Leader and Cabinet Member for Children, Education and Refugees

Decision published: 02/03/2023

Effective from: 10/03/2023

Wards affected: Camberwell Green; Dulwich Hill; Dulwich Village; Dulwich Wood;

Lead officer: David Quirke-Thornton


17/02/2023 - Rathbone Court (Tenda Road) - Local Lettings ref: 7816    Recommendations Approved

Local Lettings Scheme

Decision Maker: Cabinet Member for Council Homes and Homelessness

Decision published: 20/02/2023

Effective from: 28/02/2023

Decision:

1.  That the Cabinet Member for Council Homes and Homelessness approves the local lettings scheme for 12 new homes at Rathbone Court, Tenda Road, SE16 3FR where 50% of the properties will be allocated to existing tenants within the local area.

 

2.  Notes  the further criteria applied to residents of the local lettings scheme:

 

  i.  The local area is defined as tenants on the immediate estate where the development is located:

-  Manor Estate

  ii.  Rent arrears of less than four weeks or £50 if claiming housing benefit at point of application and point of offer.

  iii.  Households can only move upon successful completion of pre-tenancy inspection and interview as per section 5.26 of the councils published allocation scheme

  iv.  Only households assessed in a housing need (bands 1-3) will be allocated a property through the local lettings scheme. Households will be prioritised in existing priority bands and priority stars in accordance with our published allocations scheme.

  v.  Requests for additional bedrooms above the assessed need will not be considered unless on medical grounds confirmed by Housing Solutions medical assessment

  vi.  Households within the defined local lettings area will be permitted to move into new homes which are one room less than their assessed bed need for three or more bedroomed homes.

  vii.  Households within the defined local lettings area will not be permitted to move into new one or two bedroomed homes if the property is below their assessed bed need.

  viii.  Households on the general register not in the defined local lettings area will not be permitted to move into any of the new homes if the property is below their assessed bed need.

Wards affected: South Bermondsey;

Lead officer: Karen Shaw


14/02/2023 - Client contributions debt write-off (£5k to £50k) ref: 7814    Recommendations Approved

To authorise the write-off of £99,343.88 of debt as set out in Appendix 1 of the report, and to advise on any further action required on any write-offs not agreed within the report.

Decision Maker: Cabinet Member for Health and Wellbeing

Decision published: 16/02/2023

Effective from: 24/02/2023

Decision:

That the cabinet member for health and wellbeing authorises the write-off of £99,343.88 of debt as set out in Appendix 1 of the report.

 

 

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton


14/02/2023 - Gateway 1 - Procurement Strategy Approval Delivery/distribution supplier for awards under the Cost of Living Fund Local Welfare Assistance Scheme ref: 7813    Recommendations Approved

To approve a procurement strategy.

Decision Maker: Cabinet Member for Communities, Equalities and Finance

Decision published: 15/02/2023

Effective from: 14/02/2023

Decision:

1)  That the procurement strategy outlined in this report to enter into single supplier negotiations with the registered charity, Family Fund, Business Services for the procurement of a delivery partner for grant awards made under the Cost of Living Fund Local Welfare Assistance Scheme from 4 March 2023 until 3 March 2025 with an option to extend for a further two years at an estimated total value over the maximum four years of £2.8 million be approved by the Cabinet Member for Communities, Equalities and Finance.

Wards affected: (All Wards);


09/02/2023 - Determination of Objections for Alscot Road ref: 7812    Recommendations Approved

The Cabinet Member approved the recommendations outlined in the report.

Decision Maker: Cabinet Member for Leisure, Parks, Streets and Clean Air

Decision published: 09/02/2023

Effective from: 17/02/2023

Wards affected: South Bermondsey;

Lead officer: Dale Foden


09/02/2023 - GW2 Older People's Residential Care Provision ref: 7811    Recommendations Approved

Approval of contract award for the provision of older people's residential care

Decision Maker: Strategic Director of Children and Adult Services

Decision published: 09/02/2023

Effective from: 17/02/2023

Decision:

 

 

That it be agreed that in consultation with the Cabinet Member for Health and Wellbeing, that the contract award for Older People’s Residential Care provision to Agincare Homes Holdings Ltd be approved or an initial period of ten years from 1 May 2023 with an option to extend for a further five years (+5) for an estimated annual contract value of £9.3m and a whole life contract total value of £139.6m.

 

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton


06/02/2023 - Local lettings - 18 to 19 Crimscott Street ref: 7810    Recommendations Approved

Approval of local lettings scheme

Decision Maker: Cabinet Member for Council Homes and Homelessness

Decision published: 08/02/2023

Effective from: 16/02/2023

Decision:

That the Cabinet Member for Council Homes and Homelessness;

 

1.  Approves the local lettings scheme for 13 new homes being purchased at 18-19 Crimscott Street where the properties will be allocated firstly to existing tenants who currently live at Marie Curie, before being advertised to all Southwark residents through the homesearch magazine.

 

2.  Notes  the further criteria applied to residents of the local lettings scheme:

 

  i.  The local area is defined as tenants in Marie Curie, Sceaux Gardens Estate, Camberwell, London SE5 7DG.

  ii.  Rent arrears of less than four weeks or £50 if claiming housing benefit at point of application and point of offer.

  iii.  Households can only move upon successful completion of a pre-tenancy inspection and interview as per section 5.26 of the councils published allocation scheme.

  iv.  Only households assessed in a housing need (bands 1-3) will be allocated a property through the local lettings scheme. Households will be prioritised in existing priority bands and priority stars in accordance with our published allocations scheme.

  v.  Requests for additional bedrooms above the assessed need will not be considered unless on medical grounds confirmed by Housing Solutions medical assessment

  vi.  Households within the defined Local Lettings area will be permitted to move into new homes which are one room less than their assessed bed need for three or more bedroomed properties.

  vii.  Households within the defined local lettings area will not be permitted to move into new one or two bedroomed homes if the property is below their assessed bed need.

  viii.  Households on the general register not in the defined local lettings area will not be permitted to move into any of the new homes if the property is below their assessed bed need.

 

Wards affected: London Bridge & West Bermondsey;

Lead officer: Karen Shaw


06/02/2023 - Appointments to Outside Bodies 2022-23 - Mountview and Potters Field Park Management Trust ref: 7808    Recommendations Approved

Decision Maker: Cabinet

Made at meeting: 06/02/2023 - Cabinet

Decision published: 07/02/2023

Effective from: 15/02/2023

Decision:

RESOLVED:

 

1.  That Councillor Portia Mwangangye be appointed to serve on Mountview outside body 2022-23.

 

2.  That Councillor Martin Seaton be appointed to serve on Potters Field Park Management Trust for 2022-23.


06/02/2023 - Appropriation of the site known as FDS C at Aylesbury Estate ref: 7805    For Determination

Appropriation for residential development

Decision Maker: Cabinet

Made at meeting: 06/02/2023 - Cabinet

Decision published: 07/02/2023

Effective from: 15/02/2023

Decision:

RESOLVED:

 

1.  That the land shown edged hatched and edged in black on the plan at Appendix A of the report that is currently held for housing purposes be confirmed as no longer required for those purposes and the appropriation of the land to planning purposes to facilitate the carrying out of the development proposals for the area in accordance with section 226 of the Town and Country Planning Act 1990 and section 122(1) of the Local Government Act 1972 be approved.

 

2.  That following completion of the works for which the appropriation at paragraph 1 of the report is required the land shown hatched and edged in black on the plan at Appendix A be confirmed as no longer be required for planning purposes and the appropriation of the land to housing purposes in accordance with section 9 of the Housing Act 1985 and section 122(1) of the Local Government Act 1972 be approved.

 

3.  That authority be delegated to the director of planning and growth authority to:

 

·  Agree detailed terms and conditions for the indemnity agreement to be provided by Notting Hill Genesis

·  Pay compensation properly claimed where due to third parties arising from the interference of their rights in accordance with section 204 of the Housing and Planning Act 2016

·  Defend or settle (as appropriate) any compensation claims referred to the Lands Chamber of the Upper Tribunal in respect of rights that are overridden due to the exercise of the council’s powers.

Wards affected: Faraday;

Lead officer: Althea Loderick


06/02/2023 - Abbeyfield Estate - A Way Forward ref: 7803    Recommendations Approved

To agree a way forward for Maydew House and to start consultation on options for Damory and Thaxtred Court

Decision Maker: Cabinet

Made at meeting: 06/02/2023 - Cabinet

Decision published: 07/02/2023

Effective from: 08/03/2023

Decision:

RESOLVED:

 

1.  That it be noted that in 2019 the refurbishment of Maydew House was costed at £42,173,573. By 2021 these costs had risen to £69,644,677, representing an increase of £27,471,104. This increase does not include further inflation cost and the further risks outlined in paragraph 32 of the report.

 

2.  That the constraints of refurbishing Maydew House and relative advantages of wholesale redevelopment, including larger homes, an increase in the number of homes, more accessible homes, set out from paragraphs 33 to 42 of the report be noted.

 

3.  That it be agreed not to proceed with the final stage 2 tender price proposal received in relation to the refurbishment of Maydew House and the replacement of the Bede Centre on the existing Abbeyfield site.

 

4.  That it be agreed to procure a demolition contract for Maydew House, which would be subject to a separate gateway approval.

 

5.  That the whole life carbon assessment for the demolition of Maydew House and that this document will be updated as set out in paragraph 39 of the report be noted, with every effort being made to minimize and mitigate the carbon impact.

 

6.  That it be agreed to undertake a detailed consultation and engagement process with residents of Damory House and Thaxted Court over options for the future of their estate and improving the quality of their housing and environment.

 

7.  That it be agreed to amend the housing investment programme to include £4m for demolition works for Maydew House.

 

8.  That the council’s commitment and support for the Bede Centre be reaffimed and that the update on temporary and permanent options for continued operation of this important community organisation be noted.

 

9.  That the outcome of the residents meetings on 9 November 2022 and 5 December 2022 and previous meetings with officers be noted.

Wards affected: North Bermondsey;

Lead officer: Michael Scorer


06/02/2023 - Gateway 3 - Responsive Repair and Maintenance - Communal Repairs Chargeable Contracts (North & South) ref: 7809    Recommendations Approved

Decision Maker: Strategic Director of Finance and Governance

Decision published: 06/02/2023

Effective from: 14/02/2023

Decision:

That the Strategic Director of Finance and Governance:

 

1.  Approves the variation for 50% of the internal agreement carried out by the Council’ own direct labour organisation in the north of the borough, Southwark Repairs (previously known as Southwark Building Services to extend the term for a period of 13 months from 1 December 2022 to 31 December 2023 at an estimated additional cost of £1.625m, making a total revised estimated value of £6.332m.

 

2.  Approves the variation of Contract B (south of the borough) Communal Repairs Chargeable Contract to BuildTrust Ltd by extending the term of the contract for a period of 13 months from 1 December 2022 to 31 December 2023 at an estimated additional cost of £3.970m, making a total revised estimated contract value of £10.797m.

 

3.  Approves the variation for the other 50% of the internal agreement with Southwark Repairs to be carried out by the backup contractor, BuildTrust Ltd on their tendered rates for a period of 13 months from 1 December 2022 to 31 December 2023 at an estimated additional cost of £1.1m, as set out in paragraph 10 below.

 

Wards affected: (All Wards);

Lead officer: Gavin Duncumb


01/02/2023 - GW3 - Comber House Variation Decision for variation valued over £500,000 (Works)

Approval of cost increase to main works

Decision Maker: Strategic Director of Housing

Decision due date: 08/2023

Wards affected: Camberwell Green;

Lead officer: Michael Scorer

Notice of decision: 01/02/2023


01/02/2023 - GW3 - Slippers Place Variation Decision for variation valued over £500,000 (Works)

Approval of cost increase to main works

Decision Maker: Strategic Director of Housing

Decision due date: 06/2023

Wards affected: North Bermondsey;

Lead officer: Michael Scorer

Notice of decision: 01/02/2023


01/02/2023 - GW3 - Flaxyard Variation Decision for variation valued over £500,000 (Works)

Approval of cost increase to main works

Decision Maker: Strategic Director of Housing

Decision due date: 09/2023

Wards affected: Peckham;

Lead officer: Michael Scorer

Notice of decision: 01/02/2023


01/02/2023 - Gateway 1 Procurement Strategy Approval for South Dock Marina Health and Safety Works

Approval of procurement strategy

Decision Maker: Acting Strategic Director of Environment, Neighbourhoods and Growth

Decision due date: 06/2023

Wards affected: Rotherhithe;

Lead officer: Caroline Bruce

Notice of decision: 01/02/2023


01/02/2023 - Gateway 1 Procurement approval for South Dock Marina Boatyard Crane

Approval of procurement strategy for supply, installation and maintenance of replacement crane for boatyard

Decision Maker: Acting Strategic Director of Environment, Neighbourhoods and Growth

Decision due date: 06/2023

Wards affected: Rotherhithe;

Lead officer: Caroline Bruce

Notice of decision: 01/02/2023


01/02/2023 - GW3 - Rye Hill Variation Decision for variation valued over £500,000 (Works)

Approval of cost increase to main works

Decision Maker: Strategic Director of Housing

Decision due date: 05/2023

Wards affected: Peckham Rye;

Lead officer: Michael Scorer

Notice of decision: 01/02/2023


01/02/2023 - GW3 Henslowe/Bassano/Underhill - Variation Decision for variation valued over £500,000 (Works)

Approval of cost increase to main works

Decision Maker: Strategic Director of Housing

Decision due date: 05/2023

Wards affected: Dulwich Hill; Dulwich Wood; Goose Green;

Lead officer: Michael Scorer

Notice of decision: 01/02/2023


01/02/2023 - GW2 - Bells & Lindley Contract Award Approval (Works)

Approval of works contract award following procurement process through framework

Decision Maker: Strategic Director of Housing

Decision due date: 05/2023

Wards affected: Peckham;

Lead officer: Michael Scorer

Notice of decision: 01/02/2023


01/02/2023 - GW3 - Tenda Road Variation Decision for variation valued under £500,000 (Works)

Approval of cost increase to main works

Decision Maker: Strategic Director of Housing

Decision due date: 03/2023

Wards affected: South Bermondsey;

Lead officer: Michael Scorer

Notice of decision: 01/02/2023


01/02/2023 - GW3 - Canada Water (phase 1) Variation Decision for variation valued over £500,000 (Works)

Approval of cost increase to main works

Decision Maker: Strategic Director of Housing

Decision due date: 03/2023

Wards affected: Rotherhithe; Surrey Docks;

Lead officer: Michael Scorer

Notice of decision: 01/02/2023


01/02/2023 - Gateway 3 – Variation Decision for Works Contract for the New Homes Delivery programme – Salisbury Estate

Variation to value of works

Decision Maker: Strategic Director of Housing

Decision due date: 05/2023

Wards affected: North Walworth;

Lead officer: Michael Scorer

Notice of decision: 01/02/2023


01/02/2023 - GW3 Tripartite Agreement Contract Extension

To request approval to continue funding into the Lambeth, Southwark, Lewisham tripartite agreement for commissioning sexual health services

Decision Maker: Strategic Director of Children and Adult Services

Decision due date: 04/2023

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 01/02/2023


01/02/2023 - GW3 The Charter School East Dulwich phase 2 demolition and strip out works

Approval to increase the value of the contract for demolition and strip out works

Decision Maker: Strategic Director of Children and Adult Services

Decision due date: 03/2023

Wards affected: Goose Green;

Lead officer: David Quirke-Thornton

Notice of decision: 01/02/2023


01/02/2023 - Gateway 2 Contract Award Approval Camberwell New Cemetery Small Lodge underpinning works

Contract award approval

Decision Maker: Acting Strategic Director of Environment, Neighbourhoods and Growth

Decision due date: 03/2023

Wards affected: Peckham Rye;

Lead officer: Caroline Bruce

Notice of decision: 01/02/2023


01/02/2023 - Southwark’s Care Charters and Quality Assurance of Care Homes and Care at Home

To update Cabinet about the implementation of the Residential Care Charter and the quality of provision in the residential and nursing care home sector

Decision Maker: Cabinet Member for Health and Wellbeing

Decision due date: 05/2023

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 01/02/2023


01/02/2023 - GW3 Voids & Temporary Accommodation Voids Works for Traded Services

Gateway 3 - Variation

Decision Maker: Cabinet Member for Council Homes and Homelessness

Decision due date: 06/2023

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 01/02/2023


01/02/2023 - Fleet Management Strategy

To approve adoption of a new Fleet Management Strategy

Decision Maker: Cabinet

Decision due date: 10/2023

Wards affected: (All Wards);

Lead officer: Caroline Bruce

Notice of decision: 01/02/2023


01/02/2023 - GW0 - Commercial Fleet Procurement

To approve recommendations for the procurement of commercial fleet vehicles

Decision Maker: Cabinet

Decision due date: 10/2023

Wards affected: (All Wards);

Lead officer: Caroline Bruce

Notice of decision: 01/02/2023


01/02/2023 - Amendment to the Home Purchasee Grant scheme

To expand the policy to include 1 bedroom properties

Decision Maker: Cabinet

Decision due date: 09/2023

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 01/02/2023


01/02/2023 - Gateway 3 Contract Variation for Parks Grounds Maintenance Contract    Recommendations Approved

Contract Extension

Decision Maker: Cabinet

Decision due date: 03/2023

Wards affected: (All Wards);

Lead officer: Caroline Bruce

Notice of decision: 01/02/2023


01/02/2023 - GW3 0-19 Children’s Community Public Health Services Contract Variation    Recommendations Approved

To approve variation in contract value for the period 1 April 2023 to 31 March 2024

Decision Maker: Cabinet

Decision due date: 03/2023

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 01/02/2023


01/02/2023 - Evaluation of the Great Estate Improvement Pilots and next steps    Recommendations Approved

To note and comment on the evaluation of the estate improvement pilots, and consider next steps for taking this work forward.

Decision Maker: Cabinet

Decision due date: 03/2023

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 01/02/2023


01/02/2023 - GW3 - Meeting House Lane Variation Decision for variation valued over £500,000 (Works)

Approval of cost increase to main works

Decision Maker: Strategic Director of Housing

Decision due date: 07/2024

Wards affected: Peckham;

Lead officer: Osinaike, Hakeem

Notice of decision: 01/02/2023


31/01/2023 - Positive Future For Young People Fund 2022/24 - Second Call-Off LGBTQ+ and Special Educational Needs and Disabilities Provision ref: 7807    Recommendations Approved

To approve the grant funding recommendations for the Positive Future for Young People Fund

Decision Maker: Deputy Leader and Cabinet Member for Children, Education and Refugees

Decision published: 31/01/2023

Effective from: 08/02/2023

Decision:

That it be agreed that the grant funding recommendations for the ‘Positive Future for Young People Fund’ (Second Call-Off LGBTQ+ and SEND Provision) for the period 1 April 2023 – 31 March 2024 for the total value of £51,000 as follows:

 

a)  A grant of £24,000 for the period 1st April 2023 to 31st March 2024 to Bermondsey Kitchen to provide services to young  people with SENDD.

 

b)  A grant of £27,000 for the period 1st April 2023 to 31st March 2024  to The METRO Centre Ltd. to provide services to young people who identify with the LGBTQ+.

 

Wards affected: (All Wards);

Lead officer: Toni Ainge


30/01/2023 - Mortgagee in Possession Clause in Section 106 Legal Agreements for Planning Applications ref: 7804    Recommendations Approved

To agree some delegated authority on legal agreements

Decision Maker: Cabinet Member for the Climate Emergency

Decision published: 30/01/2023

Effective from: 07/02/2023

Decision:

 

-  That it be agreed that the Director of Planning and Growth has delegated authority to make decisions on deeds of variation to Section 106 planning legal agreements to vary the Mortgagee in Possession (MIP) clause where appropriate; and

 

-  That it be agreed that the Director of Planning and Growth has delegated authority to require the inclusion of the GLA Mortgagee in Possession (MIP) clause in Section 106 planning legal agreements where appropriate and on consideration of a the financial strength of the Registered Provider,

 

until 31 December 2024 or the adoption of an Affordable Housing and Viability SPD, whichever is the earlier.

 

Wards affected: (All Wards);

Lead officer: Councillor James McAsh


27/01/2023 - Gateway 2 - Contract Award Approval - Provision of cycle hangars ref: 7806    Recommendations Approved

Contract award provision of cycle hangars

Decision Maker: Acting Strategic Director of Environment, Neighbourhoods and Growth

Decision published: 30/01/2023

Effective from: 07/02/2023

Decision:

That the Strategic Director of Environment and Leisure approves the award for the supply of bicycle hangars to Cyclehoop. The initial contract period will be two years commencing on 01 March 2023 and ending on 28 February 2025, with a provision for two one-year extensions (2+1+1) at the Councils discretion, based on performance.

 

Wards affected: (All Wards);

Lead officer: Caroline Bruce


30/12/2022 - Marie Curie Independent Review    Recommendations Approved

To note the updates on the Council's response to the recommendations from the review.

Decision Maker: Cabinet

Decision due date: 03/2023

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 30/12/2022


30/12/2022 - Refresh of Procurement Framework to support Southwark 2030

Refresh of the Fairer Future Procurement Framework that supports the delivery of Southwark 2030 and includes provision of the Procurement Act

Decision Maker: Cabinet

Decision due date: 10/2024

Wards affected: (All Wards);

Lead officer: Doreen Forrester-Brown

Notice of decision: 30/12/2022


30/12/2022 - Client contributions debt write-off (over £50k)    Recommendations Approved

To approve the write-off of unrecoverable client contributions debt over £50k (Quarter 3 2022/23)

Decision Maker: Cabinet

Decision due date: 03/2023

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 30/12/2022


30/12/2022 - GW1 Procurement of Smoking Cessation marketing Campaign

To request approval to procure a marketing campaign to promote local smoking cessation services and the benefits of quitting smoking.

Decision Maker: Strategic Director of Children and Adult Services

Decision due date: 03/2023

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 30/12/2022


01/12/2022 - Gateway 1 & 2 provision of cycle hangar management software

Contract award provision of cycle hangars management software

Decision Maker: Acting Strategic Director of Environment, Neighbourhoods and Growth

Decision due date: 03/2023

Wards affected: (All Wards);

Lead officer: Caroline Bruce

Notice of decision: 01/12/2022


01/12/2022 - Gateway 2 - Lift Maintenance, Refurbishments and Replacement

Contract Award

Decision Maker: Cabinet Member for Council Homes and Homelessness

Decision due date: 11/2023

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 01/12/2022


01/12/2022 - Gateway 2 - Responsive Repair and Maintenance - Roofing and Rainwater Chargeable Contracts (North & South)

Contract Award Approval

Decision Maker: Cabinet Member for Council Homes and Homelessness

Decision due date: 04/2023

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 01/12/2022


01/12/2022 - GW3 Contract Extension for Pharmacy Based Emergency Hormonal Contraception Provision

Approval of contract extension for pharmacy based EHC provision from April 1 2023 for a period to be determined

Decision Maker: Strategic Director of Children and Adult Services

Decision due date: 03/2023

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 01/12/2022


01/12/2022 - GW1 Procurement of Young Person Sexual Health Service

To approve a procurement process for Young Person's Sexual Health Service utilising a new delviery model for implementation from 1 October 2023 for an expected contract term of 5 years which will incorporate extension options.

Decision Maker: Cabinet Member for Health and Wellbeing

Decision due date: 03/2023

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 01/12/2022


01/12/2022 - Sustainable food strategy    Recommendations Approved

To approve sustainable food strategy

Decision Maker: Cabinet

Decision due date: 06/2023

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 01/12/2022


01/12/2022 - Southwark Construction Strategic Plan    Recommendations Approved

Approval of the Southwark Construction strategy (development of new council homes)

Decision Maker: Cabinet

Decision due date: 03/2023

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 01/12/2022


01/12/2022 - GW2 The Charter School East Dulwich phase 2 construction contract stage 1

Approval of the award of the stage 1 contract to construct phase 2 of the school

Decision Maker: Strategic Director of Children and Adult Services

Decision due date: 05/2023

Wards affected: Goose Green;

Lead officer: David Quirke-Thornton

Notice of decision: 01/12/2022


01/12/2022 - GW2- Southwark Works Network Coordination contract award

Approval of the award of the Southwark Works Network Coordination

Decision Maker: Chief Executive

Decision due date: 04/2023

Wards affected: (All Wards);

Lead officer: Althea Loderick

Notice of decision: 01/12/2022


01/11/2022 - GW2 18 St Mary's Road main works contract

Approval of award of the main works contract for the refurbishment of 18 St Mary's Road to create a new children's home

Decision Maker: Strategic Director of Children and Adult Services

Decision due date: 06/2023

Wards affected: Goose Green;

Lead officer: David Quirke-Thornton

Notice of decision: 01/11/2022


01/11/2022 - GW2 The Charter School East Dulwich phase 2 temporary teaching accommodation

Approval of award of the contract for the supply of temporary modular teaching accommodation for phase 2

Decision Maker: Strategic Director of Children and Adult Services

Decision due date: 03/2023

Wards affected: Goose Green;

Lead officer: David Quirke-Thornton

Notice of decision: 01/11/2022


01/11/2022 - Responsive and Planned Maintenance – Fire Protection Chargeable Contracts

Award of contracts A (north of the borough) and B (South of the Borough)

Decision Maker: Strategic Director of Housing

Decision due date: 04/2023

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 01/11/2022


01/11/2022 - Approval to take a lease of Joe Richards House, SE 15 2QT and Manor Place Hostel, SE17 3BH and of the principle heads of terms

Report seeks authority to complete the leases on the basis of the appended Heads of Terms

Decision Maker: Cabinet

Decision due date: 06/2023

Wards affected: Newington; Nunhead & Queen's Road;

Lead officer: Stephen Platts

Notice of decision: 01/11/2022


01/11/2022 - GW2 Sceaux Gardens Main Contractor Procurement    Recommendations Approved

SCAPE Framework - main works contract for the delivery of Sceaux Gardens redevelopment scheme

Decision Maker: Cabinet

Decision due date: 06/2023

Wards affected: St Giles;

Lead officer: Michael Scorer

Notice of decision: 01/11/2022


01/11/2022 - Gateway 3: Extension of the Southwark Solicitors Framework

Extension of the existing framework by a further period of up to 18 months

Decision Maker: Cabinet Member for Communities, Equalities and Finance

Decision due date: 07/2023

Wards affected: (All Wards);

Lead officer: Doreen Forrester-Brown

Notice of decision: 01/11/2022


25/10/2022 - Council tax write offs over £5,000 and under £50,000

PLEASE NOTE:

 

This IDM on council tax write-offs (outlined below) has temporarily been withdrawn until further notice. 

Decision Maker: Cabinet Member for Communities, Equalities and Finance

Decision due date: 03/2023

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/07/2022


30/09/2022 - Waste Management Strategy - Extension to 2025    Recommendations Approved

To approve an update and extension of the Waste Management Strategy to 2025

Decision Maker: Cabinet

Decision due date: 03/2023

Wards affected: (All Wards);

Lead officer: Caroline Bruce

Notice of decision: 30/09/2022


30/09/2022 - GW0 Strategic Needs Assessment for Children and Family Centres

To consider the strategic options for improving outcomes for Children and Young people and families in relation to Children and Family Centres provision.

Decision Maker: Deputy Leader and Cabinet Member for Children, Education and Refugees

Decision due date: 07/2023

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 30/09/2022


30/09/2022 - Gateway 0: SEND Buses

Report detailing the Strategic Options Assessment for SEND Buses service provision

Decision Maker: Deputy Leader and Cabinet Member for Children, Education and Refugees

Decision due date: 11/2023

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 30/09/2022


30/09/2022 - Gateway 1: SEND Buses

Report seeking approval for the procurement of the delivery of SEND Bus services

Decision Maker: Cabinet

Decision due date: 07/2023

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 30/09/2022


01/09/2022 - Devolved highways budget 2023-24: Capital Funding Allocation (South)

To approve the allocation of funds for the 2023-24 Devolved highways budget capital programme in the South Multi Ward Area

Decision Maker: South multi-ward forum

Decision due date: 03/2023

Wards affected: Champion Hill; Dulwich Hill; Dulwich Village; Dulwich Wood; Goose Green;

Lead officer: Caroline Bruce

Notice of decision: 01/09/2022


01/09/2022 - Cleaner Greener Safer 2023-24: Capital Funding Allocation (South)

To approve the allocation of funds for the 2023-24 Cleaner Greener Safer capital programme in the South Multi Ward Area

Decision Maker: South multi-ward forum

Decision due date: 03/2023

Wards affected: Champion Hill; Dulwich Hill; Dulwich Village; Dulwich Wood; Goose Green;

Lead officer: Caroline Bruce

Notice of decision: 01/09/2022


01/09/2022 - Devolved highways budget 2023-24: Capital Funding Allocation (North East)

To approve the allocation of funds for the 2023-24 Devolved highways budget capital programme in the North East Multi Ward Area

Decision Maker: North East multi-ward forum

Decision due date: 03/2023

Wards affected: North Bermondsey; Rotherhithe; South Bermondsey; Surrey Docks;

Lead officer: Caroline Bruce

Notice of decision: 01/09/2022


01/09/2022 - Devolved highways budget 2023-24: Capital Funding Allocation (West Central)

To approve the allocation of funds for the 2023-24 Devolved highways budget capital programme in the West Central Multi Ward Area

Decision Maker: West Central multi-ward forum

Decision due date: 03/2023

Wards affected: Camberwell Green; Faraday; Newington; North Walworth; St Giles;

Lead officer: Caroline Bruce

Notice of decision: 01/09/2022


01/09/2022 - Devolved highways budget 2023-24: Capital Funding Allocation (East Central)

To approve the allocation of funds for the 2023-24 Devolved highways budget capital programme in the East Central Multi Ward Area

Decision Maker: East Central multi-ward forum

Decision due date: 03/2023

Wards affected: Nunhead & Queen's Road; Old Kent Road; Peckham; Peckham Rye; Rye Lane;

Lead officer: Caroline Bruce

Notice of decision: 01/09/2022


01/09/2022 - Cleaner Greener Safer 2023-24: Capital Funding Allocation (North West)

To approve the allocation of funds for the 2023-24 Cleaner Greener Safer capital programme in the North West Multi Ward Area

Decision Maker: North West multi-ward forum

Decision due date: 03/2023

Wards affected: Borough & Bankside; Chaucer; London Bridge & West Bermondsey; St George's;

Lead officer: Caroline Bruce

Notice of decision: 01/09/2022


01/09/2022 - Cleaner Greener Safer 2023-24: Capital Funding Allocation (West Central)

To approve the allocation of funds for the 2023-24 Cleaner Greener Safer capital programme in the West Central Multi Ward Area

Decision Maker: West Central multi-ward forum

Decision due date: 03/2023

Wards affected: Camberwell Green; Faraday; Newington; North Walworth; St Giles;

Lead officer: Caroline Bruce

Notice of decision: 01/09/2022


01/09/2022 - Cleaner Greener Safer 2023-24: Capital Funding Allocation (East Central)

To approve the allocation of funds for the 2023-24 Cleaner Greener Safer capital programme in the East Central Multi Ward Area

Decision Maker: East Central multi-ward forum

Decision due date: 03/2023

Wards affected: Nunhead & Queen's Road; Old Kent Road; Peckham; Peckham Rye; Rye Lane;

Lead officer: Caroline Bruce

Notice of decision: 01/09/2022


01/09/2022 - Cleaner Greener Safer 2023-24: Capital Funding Allocation (North East)

To approve the allocation of funds for the 2023-24 Cleaner Greener Safer capital programme in the North East Multi Ward Area

Decision Maker: North East multi-ward forum

Decision due date: 03/2023

Wards affected: North Bermondsey; Rotherhithe; South Bermondsey; Surrey Docks;

Lead officer: Caroline Bruce

Notice of decision: 01/09/2022


01/09/2022 - Appropriation of Land at the Ledbury Estate

Approval to appropriate land at Ledbury Estate

Decision Maker: Cabinet

Decision due date: 03/2023

Wards affected: Old Kent Road;

Lead officer: Michael Scorer

Notice of decision: 01/09/2022


01/09/2022 - Devolved highways budget 2023-24: Capital Funding Allocation (North West)

To approve the allocation of funds for the 2023-24 Devolved highways budget capital programme in the North West Multi Ward Area

Decision Maker: North West multi-ward forum

Decision due date: 03/2023

Wards affected: Borough & Bankside; Chaucer; London Bridge & West Bermondsey; St George's;

Lead officer: Caroline Bruce

Notice of decision: 01/09/2022


01/08/2022 - Neighbourhoods Fund (NsF) 2023-24

Approval of awards to successful projects for NsF 2023/24 round

Decision Maker: North West multi-ward forum

Decision due date: 03/2023

Wards affected: Borough & Bankside; Chaucer; London Bridge & West Bermondsey; St George's;

Lead officer: Caroline Bruce

Notice of decision: 01/08/2022


01/08/2022 - Camberwell Station Road: Good Growth Fund Public Realm Project

Decision to implement improvements to Camberwell Station Road subject to statutory consultation

Decision Maker: Cabinet Member for Leisure, Parks, Streets and Clean Air

Decision due date: 03/2023

Wards affected: Camberwell Green;

Lead officer: Stephen Platts

Notice of decision: 01/08/2022


01/08/2022 - Neighbourhoods Fund (NsF) 2023-24

Approval of awards to successful projects for NsF 2023/24 round

Decision Maker: South multi-ward forum

Decision due date: 03/2023

Wards affected: Champion Hill; Dulwich Hill; Dulwich Village; Dulwich Wood; Goose Green;

Lead officer: Caroline Bruce

Notice of decision: 01/08/2022


01/08/2022 - Neighbourhoods Fund (NsF) 2023-24

Approval of awards to successful projects for NsF 2023/24 round

Decision Maker: West Central multi-ward forum

Decision due date: 03/2023

Wards affected: Camberwell Green; Faraday; Newington; North Walworth; St Giles;

Lead officer: Caroline Bruce

Notice of decision: 01/08/2022


01/08/2022 - Neighbourhoods Fund (NsF) 2023-24

Approval of awards to successful projects for NsF 2023/24 round

Decision Maker: North East multi-ward forum

Decision due date: 03/2023

Wards affected: North Bermondsey; Rotherhithe; South Bermondsey; Surrey Docks;

Lead officer: Caroline Bruce

Notice of decision: 01/08/2022


01/08/2022 - Neighbourhoods Fund (NsF) 2023-24

Approval of awards to successful projects for NsF 2023/24 round

Decision Maker: East Central multi-ward forum

Decision due date: 03/2023

Wards affected: Nunhead & Queen's Road; Old Kent Road; Peckham; Peckham Rye; Rye Lane;

Lead officer: Caroline Bruce

Notice of decision: 01/08/2022


01/07/2022 - National non-domestic rates write offs over £50,000

To write off any NNDR debts over £50,000

Decision Maker: Cabinet

Decision due date: 06/2023

Wards affected: (All Wards);

Notice of decision: 01/07/2022


01/07/2022 - National non-domestic rates write offs over £5,000 and under £50,000

Write off of NNDR debts over £5,000 but under £50,000

Decision Maker: Cabinet Member for Communities, Equalities and Finance

Decision due date: 03/2023

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/07/2022


01/07/2022 - Housing benefit overpayment write offs over £5,000 and under £50,000

Write off of housing benefit overpayment over £5,000 but under £50,000

Decision Maker: Cabinet Member for Communities, Equalities and Finance

Decision due date: 03/2023

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/07/2022


01/07/2022 - Former tenant arrears write offs over £5,000 and under £50,000

Write off of former tenant arrears over £5,000 but under £50,000

Decision Maker: Cabinet Member for Communities, Equalities and Finance

Decision due date: 03/2023

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/07/2022


01/07/2022 - GW2 Main Contractor Ledbury Estate Towers    Recommendations Approved

Approval to procure services of main contractor - paper to include tender report and total scheme cost update.

Decision Maker: Cabinet

Decision due date: 03/2023

Wards affected: Old Kent Road;

Lead officer: Michael Scorer

Notice of decision: 01/07/2022


01/06/2022 - Policy and Resources - Capital Programme Update

To note the capital programme refresh and to approve amendments to the capital programme

Decision Maker: Council Assembly

Decision due date: 11/2023

Wards affected: (All Wards);

Notice of decision: 01/06/2022


01/04/2022 - Gateway 1 - Procurement Strategy Approval: Integrated Domestic Abuse Service

Approval of procurement strategy for an integrated domestic abuse service

Decision Maker: Cabinet

Decision due date: 10/2023

Wards affected: (All Wards);

Lead officer: Caroline Bruce

Notice of decision: 01/04/2022


01/03/2022 - Economic Strategy 2023-2030

To approve a new economic strategy for Southwark

Decision Maker: Cabinet

Decision due date: 06/2023

Wards affected: (All Wards);

Lead officer: Althea Loderick

Notice of decision: 01/03/2022


01/11/2021 - GW2 Learning Disabilities Supported Living Provision

Approval of contract award for the provision of learning disabilities supported living

Decision Maker: Strategic Director of Children and Adult Services

Decision due date: 01/2024

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 01/11/2021


01/11/2021 - GW2 Mental Health Supported Living Provision

Approval of contract award for the provision of mental health supported living

Decision Maker: Cabinet

Decision due date: 10/2023

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 01/11/2021


30/09/2021 - Heat metering policy

To approve a heat metering policy which is fair and transparent, encourages efficient use of heat, avoids fuel poverty, and meets legal requirements. The number of heat meters operated within Southwark will rise significantly in the coming years.

Decision Maker: Cabinet

Decision due date: 09/2023

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 30/09/2021


01/07/2021 - Gateway 1: The Provision of Care Services in Flexi Care Housing

Approval for the procurement of the delivery care services in of extra care housing

Decision Maker: Cabinet

Decision due date: 10/2023

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 01/07/2021