Issue - decisions

Quietway Canada Water to South Dock

02/07/2018 - Quietway Canada Water to South Dock

That the scheme for implementation, as shown in the draft outline design (Appendix A of the report), which includes the changes summarised in paragraph 4 of the report, the Albion bridge design (Appendix D of the report), and the South Dock movable bridge recommended option (Appendix E of the report) subject to the necessary statutory procedures and confirmation of construction funding be approved.