The
Chair invited Councillor Mwangangye (Cabinet Member for Council
Homes) and Officers Hakeem Osinaike (Strategic Director of
Housing), Ryan Collymore (Director of Repairs and Maintenance),
Paul Murtagh (Design and Delivery Manager), Abi Oguntokun (Director
of Landlord Services) and Candida Thompson (Director of Housing
Needs and Support) to start the interview by summarising the five
accompanying reports and key aspects of the portfolio.
Councillor Mwangangye informed the Commission that in respect of
the Fair Street/Devon Mansions, Canada and Kirby Estates QHIP Major
Works Projects:
- to
date, 27 of the 36 recommendations had been implemented and
completed
- resident panels had been appointed to help resolve issues as
these arose
- a
management action plan was in place with incompletely implemented
recommendations having been assigned dates for expected
completion
In
respect of Voids, Councillor Mwangangye reported that:
- only
void council homes came under the Cabinet Member for Council Homes
portfolio – those relating to private homes or as empty homes
related to homelessness were the remit of the Cabinet Member for
New Homes & Sustainable Development
- private sector empty homes were managed and, in some cases
brought into the council’s supply of housing through, for
example, compulsory purchase orders, empty dwelling management
orders, and loan funding (with matched funding from
owners)
- Southwark had high levels of empty homes as
a result of estate regeneration, new builds (where
properties were waiting sign-off from surveyors), buildings
awaiting demolition (e.g. Ledbury and Marie Curie) and being
situated in London where homes were sometimes left empty by
property developers and private owners
- to
help with homelessness and rough sleeping, suitable properties were
made available where possible – currently around 85% of rough
sleepers were housed in appropriate long-term
accommodation
- empty
homes were being brought back into use for homeless
families
- contractors had been appointed to strengthen existing provision
with work underway on the Aylesbury Estate
Regarding downsizing, Councillor Mwangangye reported
that:
- the
Older People Strategy passed earlier this year detailed the
incentives in place to encourage larger properties being made
available to families
On
The Good Landlord Plan, Councillor Mwangangye informed the
Commission that:
- resident boards had been launched
- residents would be increasingly involved in procurement and
decision?making as with the pilot at Chilton Grove where a resident
was sitting on the procurement panel appointing a
contractor
The
Chair invited the Commission to question the Cabinet Member and
Officers – questions included:
- the
sum of loan funding for bringing private homes into Council
use
- whether downsizing from a 3-bedroom property to 2 conferred the
same advantages (in terms of Banding) as downsizing to a 1-bedroom
property
- what a
temporary accommodation void was
- whether the team managing voids on the Aylesbury Estate sat
outside of the main voids service and, if so, the extent to which
lessons learned there could be generalised to the wider voids
service
- whether Plentific had been used to
procure the four contractors
- whether benchmarking data was available to compare
Southwark’s council housing voids performance with that of
other large, local authority landlords
- the
value for money guiding the decision to use Taplow for temporary
accommodation
- how
the new Voids Manager would employ the necessary Council
resources
- whether it might be better that residents living in temporary
accommodation-assigned Council properties scheduled for demolition
in the long-term be offered secure tenancies
- what
plans the Council had to deal with upcoming regulation e.g. minimum
energy efficiency standards as part of its work on
voids
Responding to Commission questions, Councillor Mwangangye and
Officers noted that:
- loan
funding of £1.1million together with matched funding from
building owners would be used to refurbish empty private homes for
subsequent leasing to the Council
- temporary accommodation voids were empty properties identified
for use as temporary accommodation
- on the
Aylesbury Estate, voids would be used for temporary accommodation
although they fell into different categories – those in
blocks which would not be brought back into use and would be
demolished; those in other blocks with different phases or
destinations of development; those in Taplow block which had been
decanted following identification for demolition and which would
now, subject to permission from the Building Safety Regulator, be
refurbished and re-let as temporary accommodation
- the
Aylesbury Estate represented a special case in terms of voids given
the high number of voids there and their context (as opposed to
voids generally which occurred in a random fashion as part of the
process of housing turnover)
- the
team currently working on voids on the Aylesbury Estate was the
Council’s DLO – this would soon be complemented by
additional teams appointed following a Southwark Construction
review of the voids management
- the
Council’s preference was to deliver around 90% of voids work
through its DLO and use external contractors only when capacity was
needed
- one
lesson learned to speed up delays with voids was to have
contractors deal with voids as a whole
instead of having separate, specialist contractors managing
single component parts/systems of the building (e.g. one contractor
focusing on electrics, another on plumbing etc)
- four
contractors had been brought in to complement the Council’s
own DLO voids team – these would focus on the Aylesbury
Estate and the Taplow block, and the particular and urgent needs
there
- Plentific had
not been used to procure the above contractors; a pilot was
underway with approximately 11 voids being offered on the
Plentific market platform
- while
benchmarking data of the kind requested existed, it was not
available to hand although the Commission was informed that a
“good” benchmark was for voids to be around 1% of total
housing stock; Southwark’s was currently closer to
2%
- current median turnaround times in London were 40 days for minor
voids (i.e. those not requiring roof repairs, new kitchens, new
bathrooms or similar, significant interventions) and 90 days for
major voids
- Southwark was not yet consistently meeting these informal
targets
- there
were no statutory targets for void turnaround; the aim was first to
reach the London median
- value
for money had been assessed for the Taplow block – even
though it would eventually be demolished and required refurbishing,
the rent collected and current expenditure (often very expensive)
on temporary accommodation elsewhere meant this was the best course
of action
- when
properties were offered under secure tenancies, they needed to be
let through the allocations policy (i.e. be publicised and have
bids invited)
- tenants should receive the same service whether in temporary
accommodation or if they had secure tenancies
- offering secure tenancies to residents of properties scheduled
for demolition could be misleading to residents
- a
Voids Manager was being recruited – they would have their own
staff and be able to call on wider resources to deliver on the
voids process
- in the
short-term, additional resources would increase capacity and help
to reduce the backlog in voids whilst the longer-term changes
(including the Voids Manager, indicated above, who would manage the
strategic delivery of void turnaround as an end-to-end process)
would make future work more efficient and the service would be
happy to report on this once the Voids Manager had been appointed
and had had time to improve practices
- in
terms of meeting upcoming regulation such as minimum energy
efficiency standards, findings from the ongoing Stock Condition
Survey would inform future planning as to how best to comply with
regulation – whether through a specific programme of works or
by tackling voids as and when they presented
The
Chair then moved to Commission questions on the progress
implementing recommendations on Fair Street/Devon Mansions, Canada
and Kirby Estates QHIP Major Works Projects including:
- whether the target dates, where indicated, were
realistic
- whether residents were being kept abreast of targeted deadlines
and revisions to these
- what
the council was doing in response to Recommendation 8 of the
Management Action Plan (incentives to consultants to reduce costs
of contracts) and what would have happened by the end of
March
- how regular
communication by officers as to progress/stalling of implementation
activities could help to build trust between parties (relating to
Recommendation 21 of the Management Action Plan – conduct of
TRA members and officers)
Officers responded, noting that:
- target
dates were realistic and, if revisions were necessary, reasons why
were given
- in
some cases e.g. with works on Devon
Mansions, there had been very large dumps of contractor work logs
and other information and this was
taking a long time to work through
- a
newsletter had been sent to residents in October informing them of
the works planned and finishing dates, and meetings were planned
with residents to provide updates directly
- consultants were now managed more directly through KPIs and were
paid a fee instead of a percentage of the contract
value
- the
department did need to improve its communication with residents on
updates to projects – with the new approach on the Consort
Estate, this was happening via regular meetings with residents,
leaseholders and tenants
The
Chair then invited the Commission to explore The Good Landlord
Plan and updates. Questions were asked on:
- how
the Resident Engagement Strategy was developing
- whether the Stock Condition Survey was on track
- what
the status of residents sitting on boards was – whether
council staff or volunteers
- what
developments might be communicated regarding the Abbeyfield Estate
on timescales for regeneration and when decisions would be taken on
how regeneration would be carried out
- whether the proportion of homes judged to be decent in initial
findings of the Stock Condition Survey matched
expectations
- whether Plentific was costing as
expected, if there were any unexpected issues and if Officers were
satisfied with it
- whether findings from the Stock Condition Survey would be shared
with residents including at an individual property
level
Officers responded, noting that:
- on the
Resident Engagement Strategy, a training provider had been
commissioned to support the development of the recently launched
boards and a resident-friendly version
of the strategy was in development
- also
on the Resident Engagement Strategy, where focus groups of
residents provided recommendations, they were fed back to and so
kept informed on how implementation of the recommendation was
progressing
- the
target for the Stock Condition Survey internals was 20% by the end
of March – work was ahead of target
- residents on the boards set up as part of the Resident
Engagement Strategy and The Good Landlord Plan were not council
staff but paid volunteers, paid in recognition of their
time
- from
an upcoming meeting between Councillors Mwangangye and Dennis, and
a subsequent Cabinet paper, more information on how Abbeyfield
Estate regeneration might take place would be shared with the
Commission
- prior
to the Stock Condition Survey, 74% of the Council’s homes
were estimated to meet the decent homes standard – the
current, partially completed stock condition survey suggested 88%
decency
- use of
Plentific had started in November and
there was not currently enough detail to analyse costs although the
increased visibility of contractor performance through indicators
such as Right First Time, First Time Fix Rate and
Appointments Made and Kept showed quite good or good
performance
- once
the Stock Condition Survey had covered 40% of properties, an asset
management strategy would be developed with residents invited to
consider how money should be spent on the issues
identified
- the
purpose of the Stock Condition Survey was to inform investment
decisions regarding the maintenance of the Council’s housing
stock, not to provide individual, household-level feedback on the
state of a particular property