04/03/2021 - Gateway 2: Contract award approval for Cator Street 2 Main works - Stage 1 ref: 7313 Recommendations Approved
- Find out more about this decision (item 113)
- Share this item
To approve the award of the stage 1 contract for works in relation to Cator Street (2)
Decision Maker: Strategic Director of Housing
Decision published: 08/03/2021
Effective from: 16/03/2021
Decision:
1. That in consultation with the cabinet member for housing prior approval be formalised of the revised procurement strategy for the enabling works package as set out in paragraph 12 of the report.
2. That in consultation with the cabinet member for housing that the award of the pre-construction services agreement (PCSA), stage one of the design and build contract, for the construction of 50 extra care housing units, additional seven wheelchair units and a multi-purpose community space to Engie Regeneration Limited in the sum of £724,500 for a period of 30 weeks commencing on 16 March 2021 be approved.
3. That in consultation with the cabinet member for housing that the award of the enabling works package, to run concurrently with the PCSA, for the substation relocation to Engie Regeneration Limited for the sum of £370,500 be approved.
4. That in consultation with the cabinet member for housing that the client contingency sums as set out in paragraph 89 of the closed report be noted.
Wards affected: Peckham;
Lead officer: Michael Scorer
23/06/2020 - GW2: Canada Estate QHIP 17-18 ref: 7122 Recommendations Approved
- Find out more about this decision (item 112)
- Share this item
GW2: Contract award approval – Canada Estate QHIP
Decision Maker: Strategic Director of Housing
Decision published: 23/06/2020
Effective from: 01/07/2020
Decision:
That the award of the Canada Estate Phase 2 (2017-18) QHIP Works call-off contract via a mini-competition from the major works constructor framework to Durkan Ltd for a period of 60 weeks be approved.
Wards affected: Rotherhithe;
Lead officer: Michael Scorer
17/10/2019 - Gateway 2 - Contract Ward Approval - Works Contract for the New Home Delivery Programme - Rye Hill Park Garages, London SE15 ref: 6955 Recommendations Approved
- Find out more about this decision (item 111)
- Share this item
Contract award approval
Decision Maker: Strategic Director of Housing
Decision published: 22/10/2019
Effective from: 30/10/2019
Decision:
That the award of a works contract for Rye Hill park Garages, to Engie Regeneration Ltd for the contract sum of £6,039,681 commencing from 17 February 2020 for a period of 70 weeks be approved.
That the total scheme cost as detailed in paragraph 59 be noted.
Wards affected: Peckham Rye;
Lead officer: Michael Scorer
18/10/2019 - GW2 - Approval of the procurement of contractor services - Goschen Estate ref: 6946 Recommendations Approved
- Find out more about this decision (item 110)
- Share this item
Contract award approval
Decision Maker: Strategic Director of Housing
Decision published: 21/10/2019
Effective from: 29/10/2019
Decision:
1. That the award of a works contract for Goschen Estate to Guildmore Ltd. for the sum of £6,454,990, commencing 20 January 2020 for a period of 74 weeks from site possession until approximately 16 July 2021. The proposed works will provide 17 new units within two blocks, be approved.
2. That the scheme costs in paragraph 65 be noted.
Wards affected: Camberwell Green;
Lead officer: Michael Scorer
09/10/2019 - GW2 - Approval of the procurement services - Haddonfield Estate ref: 6942 Recommendations Approved
- Find out more about this decision (item 109)
- Share this item
Contract award approval
Decision Maker: Strategic Director of Housing
Decision published: 10/10/2019
Effective from: 18/10/2019
Decision:
1. That the award of a works contract for 14 new homes on land at Haddonfield Estate, SE8 to Guildmore Ltd in the sum of £4,229, 439 for a period of 52 weeks be approved.
2. That the total scheme cost of £4,878,493 which includes associated on-costs of £437,582 and a 5% contingency sum of £211,472 be noted.
Wards affected: Rotherhithe;
Lead officer: Michael Scorer
01/10/2019 - GW2: Approval of the procurement of contractor services - Commercial Way ref: 6935 Recommendations Approved
- Find out more about this decision (item 108)
- Share this item
Approval of the procurement strategy
Decision Maker: Strategic Director of Housing
Decision published: 02/10/2019
Effective from: 10/10/2019
Decision:
That the award of works contract for the 109 unit scheme located on Commercial Way, appointing Durkan Limited commencing from 8 August 2019 for a period of 98 weeks plus 12 weeks for mobilisation from posession, be approved.
That an anicipated contingency sum and a further unanticipated contigency sum in the total scheme costs, be approved.
Wards affected: Old Kent Road;
Lead officer: Michael Scorer
04/09/2019 - GW2 - Approval of the procurement of contractor services - Rutley Close ref: 6923 Recommendations Approved
- Find out more about this decision (item 107)
- Share this item
Contract award approval
Decision Maker: Strategic Director of Housing
Decision published: 05/09/2019
Effective from: 13/09/2019
Decision:
1. That the award of a works contract for 39-44 Rutley Close, to Guildmore Ltd for the contract sum of £5,698,915 commencing from 9 December 2019 for a period of 84 weeks be approved.
2. That the total scheme costs as detailed in paragraph 59 of the report be noted.
Wards affected: Newington;
Lead officer: Michael Scorer
31/07/2019 - South London Innovation Corridor programme funding agreement ref: 6915 Recommendations Approved
- Find out more about this decision (item 106)
- Share this item
To approve the council’s entry into an agreement with Lambeth Council for £1,433,333 in Strategic Investment Pot grant funding to deliver workspace projects under the cross-borough South London Innovation Corridor programme.
Decision Maker: Cabinet Member for Jobs, Business and Innovation
Decision published: 31/07/2019
Effective from: 08/08/2019
Decision:
1. That the council’s entry into an agreement with Lambeth Council for £1,433,333 in Strategic Investment Pot grant funding to deliver workspace projects under the cross-borough South London Innovation Corridor programme be approved.
2. That the additional support for talent development and entrepreneurship in the creative digital industries for Southwark residents that will also be available under the programme be noted.
Wards affected: (All Wards);
Lead officer: Eleanor Kelly
11/07/2019 - GW2 - Approval of the procurement of contractor services - Welsford Street ref: 6891 Recommendations Approved
- Find out more about this decision (item 105)
- Share this item
Contract award approval
Decision Maker: Strategic Director of Housing
Decision published: 12/07/2019
Effective from: 20/07/2019
Decision:
1. That the award of a works contract for Welsford Street, SE1 to Bonds Builders and Contractors Limited for a contract sum of £2,957,576 for a period of 52 weeks from site possession commencing 19 September 2019 be approved.
2. That the total project costs as detailed in paragraph 59 of the report be noted.
Wards affected: South Bermondsey;
Lead officer: Michael Scorer
18/06/2019 - Gateway 3: Contract variation in relation to Willow Walk and deed of settlement ref: 6856 Recommendations Approved
- Find out more about this decision (item 104)
- Share this item
To approve a variation to the original contract for works at Willow Walk
Decision Maker: Strategic Director of Finance and Governance
Decision published: 20/06/2019
Effective from: 28/06/2019
Decision:
That the following be approved:
1. The variation to Balfour Beatty Construction Ltd (‘Balfour Beatty’) for pre-construction services, early works and main works contracts in respect of the Willow Walk new temporary hostel accommodation and general needs housing project for a total variation of £1,156,761. This applies to each contract as follows:
2. A variation to the contract with Balfour Beatty for pre-construction services (PCSA) relating to the Willow Walk new temporary hostel accommodation and general needs housing project. .
3. A variation to the contract with Balfour Beatty for enabling works related to the Willow Walk new temporary hostel accommodation and general needs housing project.
4. A variation to the contract with Balfour Beatty for main works related to the Willow Walk new temporary hostel accommodation and general needs housing project.
Wards affected: Borough & Bankside; St George's;
Lead officer: Kevin Fenton
11/06/2019 - Tenants and Residents Social Improvements Grant (TRSIG) 2019 - 20 ref: 6840 Recommendations Approved
- Find out more about this decision (item 103)
- Share this item
Award of Tenants & Residents Social Improvements Grant (TRSIG) 2019/20
Decision Maker: Cabinet Member for Housing Management and Modernisation
Decision published: 12/06/2019
Effective from: 20/06/2019
Decision:
That the Tenants & Residents Social Improvements Grant (TRSIG) programme recommendations for 2019-20 for a total sum of £162,044.03 to the 26 organisations detailed in Appendix 1 be approved.
Wards affected: (All Wards);
Lead officer: Michael Scorer
07/06/2019 - Harper Road and Bath Terrace trial width restrictions - Recommendation for width restrictions to be made permanent ref: 6838 Recommendations Approved
- Find out more about this decision (item 102)
- Share this item
Updated description
To approve the retention, under a permanent traffic order, of width restriction at Harper Road and Bath Terrace operating as two 2 metre lanes reinforced with a central traffic island and bollards.
Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency
Decision published: 11/06/2019
Effective from: 19/06/2019
Decision:
a) That the implementation of permanent width restrictions accessible to emergency services at Harper Road and Bath Terrace with camera enforcement, with estimated cost of £24,000 comprising of £19,200 for implementation works and £4,800 staff costs be approved.
b) That it be noted that statutory objections to the traffic order will be formally considered and determined before a decision is made to amend, if needed, the new width restrictions.
Wards affected: Chaucer;
Lead officer: Mick Lucas
15/05/2019 - Gateway 2 - Contract award approval - Southwark Works employment support commissioning framework ref: 6818 Recommendations Approved
- Find out more about this decision (item 101)
- Share this item
To approve appointment of providers to Southwark Works Framework. To approve award of call off contracts.
Decision Maker: Chief Executive
Decision published: 15/05/2019
Effective from: 23/05/2019
Decision:
1. That the establishment of the Southwark Works framework agreement, for the period July 2019 – July 2023, appointing the suppliers specified below to the framework be approved.
Table 1: Framework appointments |
||
Lot |
Lot name |
Framework providers |
Lot 1 |
Vulnerable young people, including care leavers |
St Giles Trust InSpire Twin Training |
Lot 2 |
Long term unemployed |
St Giles Trust Renaisi Wellfair2work (Get Set) |
Lot 3 |
Mental health |
South London and Maudsley NHS Trust |
Lot 4 |
Learning disabilities and learning difficulties, including autism |
Unity Works Southwark Mencap |
Lot 5 |
Families & lone parents |
JCCS Ltd |
Lot 6 |
Ex-offenders |
St Giles Trust |
Lot 7 |
Substance use |
JCCS Ltd St Giles Trust |
Lot 8 |
Homelessness |
Thames Reach Salvation Army |
Lot 9 |
Pre-apprenticeship support |
No appointment |
Lot 10 |
Sectors |
JCCS Ltd Step Ahead Wellfair2work (Get Set) |
2. That the individual call-off contracts from the framework as set out below for an initial period of 2 years from 1 July 2019 to 30 June 2021 with the option to extend for a further two years be approved.
Table 2: Call-off contract awards |
||
Lot |
Lot name |
Provider |
Lot 1 |
Vulnerable young people, including care leavers |
No call-off until October 2019 (see paragraph 61 for anticipated costs) |
Lot 2 |
Long term unemployed |
Renaisi |
Lot 3 |
Mental health |
South London and Maudsley NHS Trust |
Lot 4 |
Learning disabilities and learning difficulties, including autism |
Unity Works Southwark |
Lot 5 |
Families & lone parents |
JCCS Ltd |
Lot 6 |
Ex-offenders |
St Giles Trust |
Lot 7 |
Substance use |
St Giles Trust |
Lot 8 |
Homelessness |
Thames Reach |
Lot 9 |
Pre-apprenticeship support |
No call-off award |
Lot 10 |
Sectors |
JCCS Ltd Step Ahead Wellfair2work (Get Set) |
3. That it be noted that call-off contracts for Lot 1 will be procured later in 2019, to start in October 2019, and that a further Gateway report will be brought forward for approval.
4. That it be noted that no providers have been appointed to Lot 9 and that alternative plans are being developed to procure pre-apprenticeship provision, as set out in paragraph 30 of the report. Approval for these plans will be sought via further Gateway reports as necessary.
Wards affected: (All Wards);
Lead officer: Stephen Gaskell
07/05/2019 - Gateway 2 - Southwark Regeneration in Partnership Programme Lot B - Copeland Road Car Park Re-Procurement ref: 6813 Recommendations Approved
- Find out more about this decision (item 100)
- Share this item
Report seeking procurement strategy approval for the Copeland Road Car Park site.
Decision Maker: Strategic Director of Housing
Decision published: 09/05/2019
Effective from: 17/05/2019
Decision:
1. That the award of the Southwark Regeneration in Partnership Programme (SRPP) Lot B, The Copeland Car Park Site, to Purelake New Homes Limited, to deliver 67 new homes including 24 council homes and 18 intermediate, for a contract value of £16,654,772 (excluding fees) with a 5% contingency for £832,740 for approximately an 86 week period commencing in May 2019, be approved.
2. That it be noted that the contract will be funded from the housing investment programme subject to approval by the cabinet member for social regeneration, great estates and new council homes.
Wards affected: Rye Lane;
Lead officer: Michael Scorer
30/04/2019 - Gateway 2 - Contract Award Approval: Approval Phase 1 construction for Peckham Rye Station project ref: 6798 Recommendations Approved
- Find out more about this decision (item 99)
- Share this item
To approve the award of contract for the construction works of phase 1 on Peckham Rye Station project
Decision Maker: Strategic Director of Place and Wellbeing
Decision published: 30/04/2019
Effective from: 09/05/2019
Decision:
That the award of the Phase 1 Construction for Peckham Rye Station to KN Group Ltd for the value of £4,915,868 for a period of 16 months commencing in May 2019 be approved.
Wards affected: Rye Lane;
Lead officer: Kevin Fenton
23/04/2019 - Tenant Fund Budget 2019/2020 ref: 6797 Recommendations Approved
- Find out more about this decision (item 98)
- Share this item
To approve the Tenants Fund budget for 19/20
Decision Maker: Cabinet Member for Housing Management and Modernisation
Decision published: 25/04/2019
Effective from: 03/05/2019
Decision:
1. That the proposed 2019/20 Tenant Fund budget of £541K as summarised in Table 1 of the report following consultation with the Tenant Fund Management Committee (TFMC) and Tenant Council (TC) and subject to review in light of decisions adopted by Cabinet arising from the ongoing Resident Involvement Review be approved.
2. That the grant budget for Southwark Group of Tenants Organisations (SGTO) of £228k for 2019/20 attached as Appendix 2 and the KPIs attached as Appendix 3 of the report be noted and approved.
3. That retrospective approval be given for £16,875 from 2018/19 budget to fund the Citizens Advice Southwark digital inclusion support project from September 2018 to March 2019.
Wards affected: (All Wards);
Lead officer: Michael Scorer
10/04/2019 - Exchequer Services Rent Arrears Debt Write-Off - Over £5,000 ref: 6792 Recommendations Approved
- Find out more about this decision (item 97)
- Share this item
Write off of former tenant arrears debts over £5,000 and under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision published: 11/04/2019
Effective from: 19/04/2019
Decision:
That approval is given for write off of £955,432.15 of debts set out in Appendix 1 of the report for accounting purposes.
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
10/04/2019 - Housing benefit overpayment write-offs over £5,000 and under £50,000 ref: 6791 Recommendations Approved
- Find out more about this decision (item 96)
- Share this item
1. To approve the write-off of £111,549.93 of debt detailed in Appendix 1 of the report.
2. To advise any further action required on any write-offs not agreed within the report.
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision published: 11/04/2019
Effective from: 19/04/2019
Decision:
That approval is given for the write off of £111,549.93 of debt detailed in Appendix 1 of the report (multiple write-offs).
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
10/04/2019 - National non-domestic rates write-offs over £5,000 and under £50,000 ref: 6790 Recommendations Approved
- Find out more about this decision (item 95)
- Share this item
Write off of NNDR over £5,000 but under £50,0000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision published: 10/04/2019
Effective from: 18/04/2019
Decision:
That approval is given for the write-off of £966,662.84 of debt detailed in Appendix 1 of the report (multiple write-offs).
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
10/04/2019 - Council tax write offs over £5,000 and under £50,000 ref: 6789 Recommendations Approved
- Find out more about this decision (item 94)
- Share this item
Write off of council tax debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision published: 10/04/2019
Effective from: 18/04/2019
Decision:
That the write off of £84,018.01 of debt detailed in Appendix 1 of the report (multiple write-offs) be approved.
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
29/03/2019 - Non-domestic Rates - Discretionary Rate Relief policy for revaluation relief and retail discount 2019-20 ref: 6783 Recommendations Approved
- Find out more about this decision (item 93)
- Share this item
To agree the 2019-20 discretionary relief policy for revaluation relief and retail relief.
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision published: 01/04/2019
Effective from: 09/04/2019
Decision:
That the 2019-20 discretionary relief policy for revaluation relief and retail relief set out within Appendix 1 of the report be agreed.
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
22/03/2019 - North Peckham Healthy Streets improvements ref: 6760 Recommendations Approved
- Find out more about this decision (item 92)
- Share this item
Approval to implement subject to statutory consultation
Decision Maker: Cabinet Member for Environment, Transport Management and Air Quality
Decision published: 22/03/2019
Effective from: 30/03/2019
Decision:
1. That the implementation of a new parking zone in the North Peckham area, operating Monday to Friday, 8.30am to 6.30pm, be approved subject to the outcome of any necessary statutory procedures.
2. That it be noted that a further report will be brought should there be any statutory objections to the traffic order required to implement the new parking zone.
3. That the position and type of parking bays and restrictions for the new parking zone and surrounding streets as shown in the outline design save for any amendments which may be required at the implementation stage which may be determined by officers (Appendix 2 of the report) be approved.
4. That the proposed junction changes on Wells Way, St George’s Way and Commercial Way to facilitate safer walking and cycling be approved, subject to the necessary statutory procedures and minor changes resulting from the detailed design process (Appendix 2 of the report). It should be noted that St George’s Way closure would be under an experimental traffic management order.
5. That it be noted that a further report will be brought should there be any statutory objections to the traffic order required to implement the cycling and walking interventions.
Wards affected: Peckham; St Giles;
Lead officer: Ian Smith
20/03/2019 - Gateway 2: Southwark Young People's 16+ Support and Resettlement Services ref: 6756 For Determination
- Find out more about this decision (item 91)
- Share this item
Approval of Gateway 2: Contract Award Report
Decision Maker: Cabinet Member for Children, Schools and Adult Care
Decision published: 20/03/2019
Effective from: 28/03/2019
Decision:
1. That the cabinet member for children, schools and adult care, in consultation with the cabinet member for housing management and modenisation, approve the award of two contracts for the 16+ support and resettlement services to Oasis Aquila Housing and the Salvation Army for a period of 4 years from 1 July 2019 with an option to extend for a further 2 years (1+1). The total estimated maximum value of both contracts for 4 years is £5.6m as further detailed in paragraph 32 with an estimated maximum contract value of £8.6m should the contract extensions be used for both contracts.
- Contract A (North) Oasis Aquila Housing – Total estimated maximum contract value £2.8m (4 years).
- Contract B (South) The Salvation Army – Total estimated maximum contract value £2.8m (4 years).
2. That it be noted that the third lot for specialist ‘high needs‘ unit that was approved in the gateway 1 report will not be procured at this time and the business case is being explored with a timescale of June 2019 for considering options.
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
18/03/2019 - Gateway 2 - Contract Award Approval: Council for the Voluntary Sector (CVS), infrastucture & voluntary services and the new Emergency Support Scheme, 2019-2024 ref: 6755 Recommendations Approved
- Find out more about this decision (item 90)
- Share this item
Southwark’s Council for the Voluntary Sector (CVS), infrastructure and volunteering services and the Emergency Support Scheme 2019-24
Decision Maker: Deputy Leader and Cabinet Member for Culture, Leisure, Equalities and Communities
Decision published: 19/03/2019
Effective from: 27/03/2019
Decision:
That the award of the Council for the Voluntary Sector (CVS), infrastructure and volunteering service and Southwark Emergency Support Scheme (SESS) contract to Community Southwark for a total annual sum of £783,000 over a period of up to five years (4 + 1 years for both service areas), from 1 April 2019 to 31 March 2024, making a total maximum contract sum of £3,915,000 be approved.
Wards affected: (All Wards);
Lead officer: Kevin Fenton
15/03/2019 - The High Street Challenge Round 7 grant awards (Further development group - Part two) ref: 6753 Recommendations Approved
- Find out more about this decision (item 89)
- Share this item
To allocate £35,000 of grant funding from The High Street Challenge for Round 7 of this funding. The projects recommended for award are set out in Appendix 1 of the report.
Decision Maker: Cabinet Member for Jobs, Skills and Innovation
Decision published: 15/03/2019
Effective from: 23/03/2019
Decision:
That £35,000 of grant funding from The High Street Challenge for Round 7 of this funding be allocated to the projects recommended for award in Appendix 1 of the report.
Wards affected: (All Wards);
Lead officer: Eleanor Kelly
15/03/2019 - Car parking charges in parks ref: 6725 Recommendations Approved
- Find out more about this decision (item 88)
- Share this item
To approve statutory consultation on proposals to charge for car parking in car parks in parks
Decision Maker: Deputy Leader and Cabinet Member for Culture, Leisure, Equalities and Communities
Decision published: 15/03/2019
Effective from: 23/03/2019
Decision:
1. That the recommendation set out in paragraph 1 of the report be agreed. This decision is to consult on the proposed introduction and amendment of existing parking control measures.
2. That the consultation period as outlined in paragraph 34 (f) of the report be extended to a period of six weeks, from 1st April to 13th May.
The consultation will include the following:
- Engagement with specific user groups to gain an understanding of impact of proposed measures on those with disability and on regular users i.e. dog walkers to ensure these users have an opportunity to engage and provide their views.
Wards affected: (All Wards);
Lead officer: Ian Smith
05/03/2019 - Northcott House Hostel Extension ref: 6740 Recommendations Approved
- Find out more about this decision (item 87)
- Share this item
The renewal of the lease at Northcott House hostel, which provides temporary, supported accommodation for people in the borough.
Decision Maker: Cabinet Member for Housing Management and Modernisation
Decision published: 05/03/2019
Effective from: 13/03/2019
Decision:
1. That the extension of the lease on Northcott House for a period of 5 years, subject to acceptable terms being agreed with the landlord, with a view to using and managing the buildings as ‘step down’ accommodation for vulnerable adults, deemed able to live independently, pending their move into either a social or private rented tenancy be agreed.
2. That authority be delegated to the head of property to agree detailed lease terms and to complete a lease of the premises on the terms (or better) as set out in the report.
Wards affected: St George's;
Lead officer: Michael Scorer
27/02/2019 - Authorisation of Debt Write-Offs over £5,000 for Place and Wellbeing Department, Commercial Rents ref: 6729 Recommendations Approved
- Find out more about this decision (item 86)
- Share this item
To approve debt write off
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision published: 27/02/2019
Effective from: 07/03/2019
Decision:
That the write off of £320,036.54 for the three debts set out in the report be approved.
Lead officer: Kevin Fenton
22/02/2019 - Gateway 2 - Contract Appointment Approval: New Spa School Camberwell (SEN Provision) - Main Contractor - JCT Design and Build - main works (New Autism Spectrum Disorder Free School) ref: 6724 Recommendations Approved
- Find out more about this decision (item 85)
- Share this item
Report seeking approval to appoint main contractor for main works for the new Spa school Camberwell
Decision Maker: Strategic Director of Place and Wellbeing
Decision published: 25/02/2019
Effective from: 05/03/2019
Decision:
1. That the contract award for a two stage design and build contract for the delivery of the new Spa School Camberwell to Kier Construction Limited for up to £6,832,176 which in addition to the PCSA which costs £439,885 produces a total cost of up to £7,272,061 with a works period of approximately three years commencing on 1 March 2019 be approved, subject to confirmation from the council’s cost consultant that the project represents value for money and that the submission from Kier Construction Ltd satisfies the council’s requirements.
2. That the council entering into the Development Agreement with the Secretary of State for Homes Communities and Local Government (SSHCLG) and the Spa Education Ltd Multi Academy Trust (SEMAT) under the terms detailed in paragraph 55 of the report be approved.
3. That it be noted that the strategic director of children’s and adults’ services has authorised the council contribution of up to £720,000 as described in paragraphs 46 and 47 of the report.
Wards affected: Camberwell Green;
Lead officer: Kevin Fenton
05/02/2019 - The High Street Challenge Round 7 grant awards (Further development group - Part one) ref: 6716 Recommendations Approved
- Find out more about this decision (item 84)
- Share this item
To allocate £30,000 of grant funding to a single Round 7 applicant that has received support from the council to develop their application further. The project recommended for award is set out in Appendix 1 of the report.
Decision Maker: Cabinet Member for Jobs, Skills and Innovation
Decision published: 05/02/2019
Effective from: 13/02/2019
Decision:
That £30,000 of grant funding be allocated to a single Round 7 applicant that has received support from the council to develop their application further. The project recommended for award is set out in Appendix 1 of the report.
Wards affected: (All Wards);
Lead officer: Eleanor Kelly
31/01/2019 - Gateway 0: Strategic options assessment for the provision of mental health support and housing services
- Find out more about this decision (item 83)
- Share this item
The decision is a strategic options assessment for the provision of support and accommodation services for adults with mental health needs or adults who are at risk of homelessness due to mental health.
Decision Maker: Cabinet Member for Children, Schools and Adult Care
Decision due date: Not before 08/02/2019
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 30/11/2018
15/01/2019 - Gateway 2 - Contract Award Approval: Southwark Regeneration in Partnership Programme - Lot A1 ref: 6689 Recommendations Approved
- Find out more about this decision (item 82)
- Share this item
To approve the award of contract
Decision Maker: Strategic Director of Place and Wellbeing
Decision published: 16/01/2019
Effective from: 24/01/2019
Decision:
1. That the award of Lot A1 from the Southwark Regeneration in Partnership Programme (SRPP), Manor Place and Braganza, to Durkan Ltd to deliver 89 new homes of which there are 20 council homes, 1,543m2 of commercial space that will be retained by the council and a residual land offer to the council of £4,600,000 with a development period of two years seven months commencing from 22 January 2019 and completing on July 2021 be approved.
2. That it be noted that the award is subject to approval being given for the disposal of the council’s land at Manor Place and Braganza on the terms of the development agreement to be entered into with Durkan Ltd pursuant to the contract being awarded.
3. That it be noted that the award is based on the developer’s overage payment to the council at 33.3% of sales above the developer’s projected total sales of the private units at the final bid submission stage calculated after deducting the projected sales costs not exceeding 5% of actual sales (see paragraph 74 of the report).
4. That it be noted that the council will receive a total benefit of £11,300,306 consisting of 20 rented units, preparation costs of £700,306 a land offer of £4,600,000 which is approximately £2,400,306 greater than if the land was sold on the open market with an estimated value of £8,900,000.
Wards affected: (All Wards);
Lead officer: Kevin Fenton
15/01/2019 - Gateway 2: Contract Award - Lot A4 Southwark Regeneration in Partnership Programme - Lot A4 ref: 6690 Recommendations Approved
- Find out more about this decision (item 81)
- Share this item
To approve the award of contract
Decision Maker: Strategic Director of Place and Wellbeing
Decision published: 16/01/2019
Effective from: 24/01/2019
Decision:
1. That the award of Lot A4 from the Southwark Regeneration in Partnership Programme (SRPP), land at Cherry Garden School, Macks Road SE16, subject to obtaining a Section 77 Consent, to Higgins Homes Plc to deliver 56 New Homes of which 18 will be council homes and a residual land offer to the council of £1,200,000 with a development period of two years commencing from February 2019 and completing in December 2020 be approved.
2. That it be noted that the award is subject to approval being given for the disposal of the council’s land at Cherry Garden School, Macks Road SE16 on the terms of the development agreement to be entered into with Higgins Homes Plc pursuant to the contract being awarded.
3. That it be noted that the award is based on the developer’s overage payment to the council at 50% of sales above the developer’s projected total sales of the private units at the final bid submission calculated after deducting the projected sales costs and indexed build costs from the additional sales value (see paragraph 83).
4. That it be noted that the council will receive a total benefit of £6,726,000 consisting of 18 social rented units, council’s preparation costs of £126,196 and a land offer of £1,200,000 which is approximately £1,726,000 greater than if the land was sold on the open market with an estimated value of £5,000,000.
Wards affected: (All Wards);
Lead officer: Kevin Fenton
11/01/2019 - Southwark Brexit Panel - Recommendations to Cabinet
- Find out more about this decision (item 80)
- Share this item
To consider the recommendations of the Southwark Brexit Panel.
Decision Maker: Cabinet
Decision due date: 22/01/2019
Wards affected: (All Wards);
Lead officer: Stephen Gaskell
Notice of decision: 11/01/2019
07/01/2019 - Creation of a post - Director of New Homes ref: 6685 Recommendations Approved
- Find out more about this decision (item 79)
- Share this item
To approve the creation of a new post of Director of New Homes.
Decision Maker: Cabinet Member for Social Regeneration, Great Estates and New Council Homes
Decision published: 08/01/2019
Effective from: 16/01/2019
Decision:
That the creation of a new post of Director of New Homes, the purpose and duties which are set out in the job description appended to the report be approved.
Lead officer: Michael Scorer
07/01/2019 - Allocation of funds to wards via Cleaner Greener Safer and Devolved Highways programmes ref: 6686 Recommendations Approved
- Find out more about this decision (item 78)
- Share this item
To approve the recommended changes to how funding from both the Cleaner Greener Safer and Devolved Highways programmes are allocated to Community Councils.
Decision Maker: Cabinet Member for Environment, Transport Management and Air Quality
Decision published: 08/01/2019
Effective from: 16/01/2019
Decision:
That the recommended changes to how funding from both the Cleaner Greener Safer and Devolved Highways programmes is allocated to Community Councils, as set out in paragraph 14 of the report, be approved.
Wards affected: (All Wards);
Lead officer: Dale Foden
21/12/2018 - New Common Purpose grants programme awards for 2019 onwards ref: 6684 Recommendations Approved
- Find out more about this decision (item 77)
- Share this item
To approve the funding recommendations for voluntary sector organisations delivering services under the new Common Purpose grants programme 2019 onwards subject to council assembly approval of the council’s budget. The recommendations are set out in Appendix 1 of the report.
Decision Maker: Deputy Leader and Cabinet Member for Culture, Leisure, Equalities and Communities
Decision published: 02/01/2019
Effective from: 10/01/2019
Decision:
That the funding recommendations for voluntary sector organisations delivering services under the new Common Purpose grants programme 2019 onwards be approved, subject to council assembly approval of the council’s budget. The recommendations are set out in Appendix 1 of the report.
Wards affected: (All Wards);
Lead officer: Kevin Fenton
02/01/2019 - National non-domestic rates write offs over £50,000 - September 2019
- Find out more about this decision (item 76)
- Share this item
To write off any NNDR debts over £50,000
Decision Maker: Cabinet
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
02/01/2019 - 1 Ann Moss Way, Rotherhithe SE16 1TL
- Find out more about this decision (item 75)
- Share this item
Authority to acquire a former specialist care unit as a potential site for new council housing
Decision Maker: Cabinet
Decision due date: 01/2019
Wards affected: Rotherhithe;
Lead officer: Kevin Fenton
Notice of decision: 02/01/2019
02/01/2019 - Policy and Resources Strategy 2020-21 to 2022-23 Recommendations Approved
- Find out more about this decision (item 74)
- Share this item
To note the outcomes and implications of the local government funding position for the council to agree the MTFS
Decision Maker: Cabinet
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
02/01/2019 - Great Estates Programme - Estate Improvement Plans
- Find out more about this decision (item 73)
- Share this item
To agree the principles of the Estate Improvement Plans, which are a part of the Great Estates Programme
Decision Maker: Cabinet
Decision due date: 03/2019
Wards affected: (All Wards);
Lead officer: Ian Smith
Notice of decision: 02/01/2019
02/01/2019 - The Future of Greenland Dock South Marina and Boatyard
- Find out more about this decision (item 72)
- Share this item
To set out the options for improvements to the docks and boatyard and to seek approval to engage with residents and berth holders about the options
Decision Maker: Cabinet
Decision due date: 03/2019
Wards affected: Surrey Docks;
Lead officer: Ian Smith
Notice of decision: 02/01/2019
02/01/2019 - National non-domestic rates write offs over £5,000 and under £50,000
- Find out more about this decision (item 71)
- Share this item
Write off of NNDR debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
02/01/2019 - Housing benefit overpayment write offs over £5,000 and under £50,000
- Find out more about this decision (item 70)
- Share this item
Write off of housing benefit overpayment debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
02/01/2019 - Policy and Resources Strategy: financial remit 2020-21 and scene setting Recommendations Approved
- Find out more about this decision (item 69)
- Share this item
To note the financial remit for 2020-21
Decision Maker: Cabinet
Decision due date: 07/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
02/01/2019 - Policy and Resources Strategy: revenue monitoring report, including treasury management 2019-20 Recommendations Approved
- Find out more about this decision (item 68)
- Share this item
To note the forecast revenue outturn position, including treasury management
Decision Maker: Cabinet
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
02/01/2019 - Former tenants arrears write offs over £5,000 and under £50,000
- Find out more about this decision (item 67)
- Share this item
Write off of former tenant arrears debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
02/01/2019 - Policy and Resources Strategy: capital monitoring report, including capital programme update 2019-20 Recommendations Approved
- Find out more about this decision (item 66)
- Share this item
To note the forecast capital outturn position and to approve amendments to the capital programme
Decision Maker: Cabinet
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
02/01/2019 - Gateway 3: Domestic abuse 9 month contract extension
- Find out more about this decision (item 65)
- Share this item
Decision to extend current domestic abuse service for a further 9 months at the end of its current contract end date of October 2019
Decision Maker: Strategic Director of Housing
Decision due date: 02/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 02/01/2019
02/01/2019 - Council tax write offs over £5,000 and under £50,000
- Find out more about this decision (item 64)
- Share this item
Write off of council tax debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
30/11/2018 - Social Regeneration Framework and Indicators Recommendations Approved
- Find out more about this decision (item 63)
- Share this item
To approve the updated social regeneration framework and high-level indicators
Decision Maker: Cabinet
Decision due date: 01/2019
Wards affected: (All Wards);
Lead officer: Kevin Fenton
Notice of decision: 30/11/2018
30/11/2018 - Gateway 3: Contract variations in supported housing for 16+
- Find out more about this decision (item 62)
- Share this item
To approve the contract variations for supported housing for 16+
Decision Maker: Strategic Director of Children and Adult Services
Decision due date: 04/2019
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 30/11/2018
30/11/2018 - Approach to Community Engagement Recommendations Approved
- Find out more about this decision (item 61)
- Share this item
To approve the award of contract for community advice services from October 2019
Decision Maker: Cabinet
Decision due date: 04/2019
Wards affected: (All Wards);
Lead officer: Kevin Fenton
Notice of decision: 30/11/2018
30/11/2018 - Faith Strategy Recommendations Approved
- Find out more about this decision (item 60)
- Share this item
Report seeking approval of a council strategy for working with faith organisations
Decision Maker: Cabinet
Decision due date: 03/2019
Wards affected: (All Wards);
Lead officer: Kevin Fenton
Notice of decision: 30/11/2018
30/11/2018 - Joint Strategic Needs Assessment on serious youth violence Recommendations Approved
- Find out more about this decision (item 59)
- Share this item
Interim youth report on joint strategic needs assessment and framework for public health approach to preventing youth violence
Decision Maker: Cabinet
Decision due date: 10/2019
Wards affected: (All Wards);
Lead officer: Kevin Fenton
Notice of decision: 30/11/2018
30/11/2018 - Aylesbury Regeneration - Moving Forward
- Find out more about this decision (item 58)
- Share this item
Agreement to sub-phases for rehousing purposes. Agreement to principle of local letting scheme for Plot 18. Approve draft Social Regeneration Charter for Walworth. Note update on programme delivery.
Decision Maker: Cabinet
Decision due date: 03/2019
Wards affected: Faraday;
Lead officer: Kevin Fenton
Notice of decision: 30/11/2018
30/11/2018 - Fairer Future Procurement Framework Recommendations Approved
- Find out more about this decision (item 57)
- Share this item
To agree the updated Fairer Future Procurement Strategy
Decision Maker: Cabinet
Decision due date: 06/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 30/11/2018
30/11/2018 - LBS Housing Rents Income Collection Policy Recommendations Approved
- Find out more about this decision (item 56)
- Share this item
To note new rent income collection policy developed in response to Government welfare reform and Universal Credit
Decision Maker: Cabinet
Decision due date: 07/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 30/11/2018
30/11/2018 - Implementing Civil Penalties in the Private Rented Sector Recommendations Approved
- Find out more about this decision (item 55)
- Share this item
Approval of the enforcement policy and penalty matrix for implementing civic penalty notices in the private rented sector under the Housing and Planning Act 2016
Decision Maker: Cabinet
Decision due date: 01/2019
Wards affected: (All Wards);
Lead officer: Deborah Collins
Notice of decision: 30/11/2018
30/11/2018 - Livesey Exchange Recommendations Approved
- Find out more about this decision (item 54)
- Share this item
Terms of lease disposal of council land. Conditions relating to council and GLA Good Growth Funding.
Decision Maker: Cabinet
Decision due date: 01/2019
Wards affected: Old Kent Road;
Lead officer: Kevin Fenton
Notice of decision: 30/11/2018
30/11/2018 - New library for Walworth Recommendations Approved
- Find out more about this decision (item 53)
- Share this item
To commit to taking a lease to provide new library facilities
Decision Maker: Cabinet
Decision due date: 01/2019
Wards affected: North Walworth;
Lead officer: Kevin Fenton
Notice of decision: 30/11/2018
30/11/2018 - Gateway 3: Contract variations in supported housing for mental health and mental health homelessness - Up to March 2020
- Find out more about this decision (item 52)
- Share this item
To approve the contract for supporting peoples services mental health
Decision Maker: Strategic Director of Children and Adult Services
Decision due date: 04/2019
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 30/11/2018
30/11/2018 - Library and Heritage Strategy Recommendations Approved
- Find out more about this decision (item 51)
- Share this item
Approval of strategy to be implemented next financial year
Decision Maker: Cabinet
Decision due date: 01/2019
Wards affected: (All Wards);
Lead officer: Deborah Collins
Notice of decision: 30/11/2018
06/11/2018 - East Dulwich and Peckham West Controlled Parking Zones
- Find out more about this decision (item 50)
- Share this item
Approval to implement subject to statutory consultation
Decision Maker: Cabinet Member for Environment, Transport Management and Air Quality
Decision due date: 02/2019
Wards affected: Dulwich Hill; Goose Green; Rye Lane;
Lead officer: Deborah Collins
Notice of decision: 01/11/2018
06/11/2018 - Gateway 1: Procurement Strategy approval for Riverside School
- Find out more about this decision (item 49)
- Share this item
Report seeking approval of Gateway 1 for procurement of works and services for Riverside School rebuilding of damaged 1960s blocks.
Decision Maker: Strategic Director of Children and Adult Services
Decision due date: 01/2019
Wards affected: Borough & Bankside;
Lead officer: David Quirke-Thornton
Notice of decision: 01/11/2018
06/11/2018 - Neighbourhoods Fund (NsF) 2019-20
- Find out more about this decision (item 48)
- Share this item
Approval of awards to successful projects for NsF 2019-20 round
Decision Maker: Dulwich Community Council
Decision due date: 01/2019
Wards affected: Dulwich Hill; Dulwich Village; Dulwich Wood; Goose Green;
Lead officer: Michael Scorer
Notice of decision: 01/11/2018
06/11/2018 - Forest Hill Road 20mph
- Find out more about this decision (item 47)
- Share this item
Approval to implement subject to statutory consultation
Decision Maker: Cabinet Member for Environment, Transport Management and Air Quality
Decision due date: 01/2019
Wards affected: Peckham Rye;
Lead officer: Deborah Collins
Notice of decision: 01/11/2018
06/11/2018 - Treasury Management Performance - 2018-19 annual report and prudential indicators
- Find out more about this decision (item 46)
- Share this item
To note the treasury management performance and outturn for prudential indicators on capital finance, debt and investments 2018-19
Decision Maker: Council Assembly
Decision due date: 07/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/11/2018
06/11/2018 - Neighbourhoods Fund (NsF) 2019-20
- Find out more about this decision (item 45)
- Share this item
Approval of awards to successful projects for NsF 2019-20 round
Decision Maker: Borough, Bankside and Walworth Community Council
Decision due date: 02/2019
Wards affected: Borough & Bankside; Chaucer; Faraday; Newington; North Walworth; St George's;
Lead officer: Michael Scorer
Notice of decision: 01/11/2018
06/11/2018 - GW2: Print document management services
- Find out more about this decision (item 44)
- Share this item
Contract award for a replacement print document management service
Decision Maker: Cabinet Member for Housing Management and Modernisation
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/11/2018
06/11/2018 - Neighbourhoods Fund (NsF) 2019-20
- Find out more about this decision (item 43)
- Share this item
Approval of awards to successful projects for NsF 2019-20 round
Decision Maker: Bermondsey and Rotherhithe Community Council
Decision due date: 01/2019
Wards affected: London Bridge & West Bermondsey; North Bermondsey; Old Kent Road; Rotherhithe; South Bermondsey; Surrey Docks;
Lead officer: Michael Scorer
Notice of decision: 01/11/2018
06/11/2018 - Neighbourhoods Fund (NsF) 2019-20
- Find out more about this decision (item 42)
- Share this item
Approval of awards to successful projects for NsF 2019-20 round
Decision Maker: Camberwell Community Council
Decision due date: 02/2019
Wards affected: Camberwell Green; Champion Hill; St Giles;
Lead officer: Michael Scorer
Notice of decision: 01/11/2018
06/11/2018 - Neighbourhoods Fund (NsF) 2019-20
- Find out more about this decision (item 41)
- Share this item
Approval of awards to successful projects for NsF 2019-20 round
Decision Maker: Peckham and Nunhead Community Council
Decision due date: 01/2019
Wards affected: Nunhead & Queen's Road; Old Kent Road; Peckham; Peckham Rye; Rye Lane;
Lead officer: Michael Scorer
Notice of decision: 01/11/2018
06/11/2018 - Sydenham Hill 20mph
- Find out more about this decision (item 40)
- Share this item
Approval to implement subject to statutory consultation
Decision Maker: Cabinet Member for Environment, Transport Management and Air Quality
Decision due date: 07/2019
Wards affected: Dulwich Wood;
Lead officer: Mick Lucas
Notice of decision: 01/11/2018
06/11/2018 - Home Owner Fund
- Find out more about this decision (item 39)
- Share this item
To approve the Home Owner Fund budget for 19/20
Decision Maker: Cabinet Member for Housing Management and Modernisation
Decision due date: 03/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/11/2018
01/10/2018 - Council tax write offs over £5,000 and under £50,000
- Find out more about this decision (item 38)
- Share this item
Write off of council tax debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 06/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/10/2018
01/10/2018 - Housing benefit overpayment write offs over £5,000 and under £50,000
- Find out more about this decision (item 37)
- Share this item
Write off of housing benefit overpayment debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 06/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/10/2018
01/10/2018 - Former tenant arrears write offs over £5,000 and under £50,000
- Find out more about this decision (item 36)
- Share this item
Write off of former tenant arrears debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 06/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/10/2018
01/10/2018 - GW2: Kirby Estate QHIP 18/19
- Find out more about this decision (item 35)
- Share this item
Contract award approval – Adams Gardens QHIP
Decision Maker: Strategic Director of Housing
Decision due date: 01/2019
Wards affected: London Bridge & West Bermondsey;
Lead officer: Michael Scorer
Notice of decision: 01/10/2018
01/10/2018 - GW2: Neckinger Estate QHIP 18/19
- Find out more about this decision (item 34)
- Share this item
Contract award approval – Neckinger estate QHIP
Decision Maker: Strategic Director of Housing
Decision due date: 01/2019
Wards affected: London Bridge & West Bermondsey;
Lead officer: Michael Scorer
Notice of decision: 01/10/2018
01/10/2018 - Policy and Resources Strategy: capital monitoring report outturn 2018-19 Recommendations Approved
- Find out more about this decision (item 33)
- Share this item
To note the capital outturn position for 2018-19
Decision Maker: Cabinet
Decision due date: 06/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/10/2018
01/10/2018 - Policy and Resources Strategy: revenue monitoring report outturn, including treasury management 2018-19 Recommendations Approved
- Find out more about this decision (item 32)
- Share this item
To note the forecast revenue outturn position for 2017-18, including treasury management
Decision Maker: Cabinet
Decision due date: 06/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/10/2018
01/10/2018 - National non-domestic rates write offs over £50,000 - June 2019
- Find out more about this decision (item 31)
- Share this item
Write off of any NNDR debts over £50,000
Decision Maker: Cabinet
Decision due date: 06/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/10/2018
01/10/2018 - Disposal of land on the Comber Estate adjacent to 56-60 Comber Grove, SE5
- Find out more about this decision (item 30)
- Share this item
To approve appropriation of land for planning purposes and disposal of land to adjacent owner to facilitate a residential – led development, including re-provision of Hollington club
Decision Maker: Cabinet
Decision due date: 03/2019
Wards affected: Camberwell Green;
Lead officer: Kevin Fenton
Notice of decision: 01/10/2018
01/10/2018 - GW1: Contractor Services for the delivery of Sceaux Gardens Recommendations Approved
- Find out more about this decision (item 29)
- Share this item
Procurement Strategy Approval
Decision Maker: Cabinet
Decision due date: 01/2019
Wards affected: Camberwell Green;
Lead officer: Michael Scorer
Notice of decision: 01/10/2018
01/10/2018 - Gateway 1 - Major Building Works Recommendations Approved
- Find out more about this decision (item 28)
- Share this item
Procurement Strategy Approval
Decision Maker: Cabinet
Decision due date: 07/2020
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/10/2018
31/08/2018 - Gateway 1: Lost Effra Flood Alleviation and Environmental Improvement Scheme
- Find out more about this decision (item 27)
- Share this item
To approve the procurement strategy
Decision Maker: Strategic Director of Environment and Social Regeneration
Decision due date: 03/2019
Wards affected: Peckham Rye;
Lead officer: Deborah Collins
Notice of decision: 31/08/2018
31/08/2018 - GW0 - South London Commissioning Group (SLCG) Procurement for Children's Residential Care and Independent Fostering
- Find out more about this decision (item 26)
- Share this item
Seeking to approve procurement approach as part of the sub-regional framework for residential and independent fostering
Decision Maker: Cabinet Member for Children, Schools and Adult Care
Decision due date: 05/2019
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 31/08/2018
31/08/2018 - Resident Involvement Review recommendations Recommendations Approved
- Find out more about this decision (item 25)
- Share this item
To note the recommendations on resident involvement and agree further consultation
Decision Maker: Cabinet
Decision due date: 06/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 31/08/2018
31/08/2018 - Gateway 0 - Parking and associated services Recommendations Approved
- Find out more about this decision (item 24)
- Share this item
To approve the procurement strategy
Decision Maker: Cabinet
Decision due date: 02/2019
Wards affected: (All Wards);
Lead officer: Deborah Collins
Notice of decision: 31/08/2018
01/08/2018 - Southwark coordinated admission schemes for primary, junior and secondary admissions 2020 Recommendations Approved
- Find out more about this decision (item 23)
- Share this item
To agree the Southwark coordinated admission schemes for primary, junior, and secondary admissions for September 2020
Decision Maker: Cabinet
Decision due date: 01/2019
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 01/08/2018
01/08/2018 - Admission arrangements for community primary schools - September 2020 Amendment of Primary Published Admissions Numbers (PANs) for September 2019 Recommendations Approved
- Find out more about this decision (item 22)
- Share this item
To agree the admission arrangements for community primary schools for September 2020
Decision Maker: Cabinet
Decision due date: 01/2019
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 01/08/2018
01/06/2018 - GW2 Professional Technical Services
- Find out more about this decision (item 21)
- Share this item
Contract award approval of the provision of professional technical services to the major works team on the delivery of the housing capital programme
Decision Maker: Cabinet Member for Council Homes and Homelessness
Decision due date: 07/2021
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/06/2018
01/06/2018 - Policy and Resources Strategy 2019-20 to 2021-22 update
- Find out more about this decision (item 20)
- Share this item
To recommend to council and agree a 2019-20 general fund revenue budget
Decision Maker: Cabinet
Decision due date: 02/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/06/2018
01/06/2018 - Policy and Resources Strategy: capital monitoring report, including capital programme update 2018-19
- Find out more about this decision (item 19)
- Share this item
To note the forecast capital outturn position, and to approve amendments to the capital programme
Decision Maker: Cabinet
Decision due date: 02/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/06/2018
01/06/2018 - Setting the council tax 2019-20
- Find out more about this decision (item 18)
- Share this item
To set the council tax levels
Decision Maker: Council Assembly
Decision due date: 02/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/06/2018
01/06/2018 - Treasury Management Strategy 2019-20 including annual investment strategy, prudential indicators and annual minimum revenue provision statement
- Find out more about this decision (item 17)
- Share this item
To note the treasury management strategy and agree the investment strategy, capital financial and treasury indicators, and provisions for debt
Decision Maker: Council Assembly
Decision due date: 02/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/06/2018
01/06/2018 - Policy and Resources Strategy 2019-20 to 2021-22 update
- Find out more about this decision (item 16)
- Share this item
To agree a 2019-20 general fund revenue budget, including fees and charges
Decision Maker: Council Assembly
Decision due date: 02/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/06/2018
01/06/2018 - Policy and Resources Strategy: revenue monitoring report, including treasury management 2018-19 Recommendations Approved
- Find out more about this decision (item 15)
- Share this item
To note the forecast revenue outturn position, including treasury management
Decision Maker: Cabinet
Decision due date: 02/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/06/2018
01/06/2018 - National non-domestic rates write offs over £50,000 - February 2019
- Find out more about this decision (item 14)
- Share this item
Write off any NNDR debts over £50,000
Decision Maker: Cabinet
Decision due date: 02/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/06/2018
01/06/2018 - Capital strategy and capital programme refresh for 2019-20 - 2028-29
- Find out more about this decision (item 13)
- Share this item
To agree the recommendations of cabinet for a refreshed general cabinet fund capital programme and housing investment fund programme
Decision Maker: Council Assembly
Decision due date: 02/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/06/2018
01/06/2018 - Policy and Resources Strategy: capital monitoring report, including capital programme update 2018-19, and capital strategy and capital programme refresh for 2019-20 - 2028-29 Recommendations Approved
- Find out more about this decision (item 12)
- Share this item
To note the forecast capital outturn position, approve amendments to the capital programme and consider the capital strategy and capital programme refresh for 2019-20 – 2028-29
Decision Maker: Cabinet
Decision due date: 02/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/06/2018
01/06/2018 - Gateway 1 - FM contract for the councils operational estate
- Find out more about this decision (item 11)
- Share this item
Procurement Strategy Approval
Decision Maker: Cabinet
Decision due date: 03/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/06/2018
01/05/2018 - London Councils Grant Levy 2019-20
- Find out more about this decision (item 10)
- Share this item
To approve the Southwark Levy Contribution for 2019-20
Decision Maker: Deputy Leader and Cabinet Member for Culture, Leisure, Equalities and Communities
Decision due date: 01/2019
Wards affected: (All Wards);
Lead officer: Kevin Fenton
Notice of decision: 01/05/2018
29/03/2018 - 152 Fort Road, SE1, 48 Hayles Street, SE11 and 121 Grosvenor Park SE5
- Find out more about this decision (item 9)
- Share this item
To dispose of the council’s freehold interest in the properties at auction
Decision Maker: Cabinet
Decision due date: 06/2019
Wards affected: Camberwell Green; South Bermondsey; St George's;
Lead officer: Kevin Fenton
Notice of decision: 29/03/2018
29/03/2018 - Gateway 1: Procurement strategy approval - for Cator Street (2) works
- Find out more about this decision (item 8)
- Share this item
To approve the procurement strategy for the works in relation to Cator Street (2)
Decision Maker: Cabinet
Decision due date: 03/2019
Wards affected: Peckham;
Lead officer: Kevin Fenton
Notice of decision: 29/03/2018
11/02/2019 - Gateway 2 - Elizabeth Estate QHIP 17/18 ref: 6720 Recommendations Approved
- Find out more about this decision (item 7)
- Share this item
Contract award approval
Decision Maker: Strategic Director of Housing
Decision published: 29/03/2018
Effective from: 20/02/2019
Decision:
That the award of the Elizabeth Estate QHIP 2017-18 via a mini-competition from the major works constructor framework to Saltash Enterprises Ltd for a period of 46 weeks be approved.
Wards affected: Faraday;
Lead officer: Michael Scorer
01/12/2017 - Peckham QHIP 2018-2019 - Batch 5
- Find out more about this decision (item 6)
- Share this item
To approve the upcoming major works programme under JCT Framework tender.
Decision Maker: Strategic Director of Housing
Decision due date: 01/2020
Wards affected: Peckham;
Lead officer: Michael Scorer
Notice of decision: 01/12/2017
01/11/2017 - Elephant and Castle Centre Compulsory Purchase Order
- Find out more about this decision (item 5)
- Share this item
To seek compulsory purchase powers that may be needed to secure the consented redevelopment of the Elephant and Castle Shopping Centre
Decision Maker: Cabinet
Decision due date: 03/2020
Wards affected: North Walworth; St George's;
Lead officer: Kevin Fenton
Notice of decision: 01/11/2017
01/11/2017 - Elephant and Castle shopping centre progress report
- Find out more about this decision (item 4)
- Share this item
To provide the progress report called for by Cabinet on 9 May 2017 and to set out next steps to deliver a new shopping centre.
Decision Maker: Cabinet
Decision due date: 03/2020
Wards affected: North Walworth; St George's;
Lead officer: Kevin Fenton
Notice of decision: 01/11/2017
01/11/2017 - Gateway 2: Contract award approval - Southwark Athletics Centre Building (Main Contractor)
- Find out more about this decision (item 3)
- Share this item
To approve the award of contract
Decision Maker: Strategic Director of Environment and Social Regeneration
Decision due date: 01/2020
Wards affected: Peckham Rye;
Lead officer: Rebecca Towers
Notice of decision: 01/11/2017
01/11/2017 - Gateway 2: Contract Award approval for the delivery of Mixed Tenure Development, Schools and Commercial units at Beormund School Site - Southwark Regeneration in Partnership - Lot A5
- Find out more about this decision (item 2)
- Share this item
To approve the award of contract
Decision Maker: Cabinet
Decision due date: 06/2020
Wards affected: (All Wards);
Lead officer: Kevin Fenton
Notice of decision: 01/11/2017
03/03/2016 - Gateway 1: Procurement strategy approval - reablement services
- Find out more about this decision (item 1)
- Share this item
Report seeking approval to procure a new supplier of reablement services
Decision Maker: Cabinet
Decision due date: 03/2020
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 03/03/2016