Decisions

04/03/2021 - Gateway 2: Contract award approval for Cator Street 2 Main works - Stage 1 ref: 7313    Recommendations Approved

To approve the award of the stage 1 contract for works in relation to Cator Street (2)

Decision Maker: Strategic Director of Housing

Decision published: 08/03/2021

Effective from: 16/03/2021

Decision:

 

1.   That in consultation with the cabinet member for housing prior approval be formalised of the revised procurement strategy for the enabling works package as set out in paragraph 12 of the report.

 

2.   That in consultation with the cabinet member for housing that the award of the pre-construction services agreement (PCSA), stage one of the design and build contract, for the construction of 50 extra care housing units, additional seven wheelchair units and a multi-purpose community space to Engie Regeneration Limited in the sum of £724,500 for a period of 30 weeks commencing on 16 March 2021 be approved.

 

3.   That in consultation with the cabinet member for housing that the award of the enabling works package, to run concurrently with the PCSA, for the substation relocation to Engie Regeneration Limited for the sum of £370,500 be approved.

 

4.   That in consultation with the cabinet member for housing that the client contingency sums as set out in paragraph 89 of the closed report be noted.

Wards affected: Peckham;

Lead officer: Michael Scorer


18/05/2020 - GW2 - Approval of the procurement of contractor services Sedgmoor Place ref: 7097    Recommendations Approved

Contract award approval

Decision Maker: Strategic Director of Housing

Decision published: 18/05/2020

Effective from: 27/05/2020

Decision:

1.  That the award of a works contract for 13 new homes at Sedgmoor Place SE5 to Neilcott Construction Limited for a period of 65 weeks including mobilisation be approved.

 

2.  That it be noted the total scheme cost includes associated on-costs and a 5% contingency sum.

Wards affected: St Giles;

Lead officer: Michael Scorer


01/04/2020 - GW2 - Approval of the procurement of contractor services - Salisbury Estate ref: 7040    Recommendations Approved

Contract award approval

Decision Maker: Strategic Director of Housing

Decision published: 01/04/2020

Effective from: 09/04/2020

Decision:

 

That the award of a works contract for 26 new homes on land at Salisbury Close Estate, SE17 to Glenman Limited for a period of 83 weeks be approved.

Wards affected: North Walworth;

Lead officer: Michael Scorer


19/12/2019 - Gateway 2: Contract award approval Walworth Library and Southwark Heritage Centre (Design and Build) ref: 6982    Recommendations Approved

To approve the award of contract for design and build contract in relation to 145 – 147 Walworth Road

Decision Maker: Acting Strategic Director of Environment, Neighbourhoods and Growth

Decision published: 19/12/2019

Effective from: 19/12/2019

Decision:

That the award of contract to Lendlease to deliver the Design and Build for Walworth Library and Southwark Heritage Centre to a value of £3,250,000 (including a 10% works contingency to be held by the client) to commence on 20 December 2019 for a period of 2 years be approved.

Wards affected: North Walworth;

Lead officer: Rebecca Towers


05/12/2019 - Leathermarket Development Management - New Council Homes

Approval of the overarching grant agreement with Leathermarket CBS to deliver 161 council homes.

Decision Maker: Cabinet

Decision due date: 17/12/2019

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 01/05/2019


17/10/2019 - Gateway 2 - Contract Ward Approval - Works Contract for the New Home Delivery Programme - Rye Hill Park Garages, London SE15 ref: 6955    Recommendations Approved

Contract award approval

Decision Maker: Strategic Director of Housing

Decision published: 22/10/2019

Effective from: 30/10/2019

Decision:

 

 

 

That the award of a works contract for Rye Hill park Garages, to Engie Regeneration Ltd for the contract sum of £6,039,681 commencing from 17 February 2020 for a period of 70 weeks be approved.

 

That the total scheme cost as detailed in paragraph 59 be noted.

 

Wards affected: Peckham Rye;

Lead officer: Michael Scorer


18/10/2019 - GW2 - Approval of the procurement of contractor services - Goschen Estate ref: 6946    Recommendations Approved

Contract award approval

Decision Maker: Strategic Director of Housing

Decision published: 21/10/2019

Effective from: 29/10/2019

Decision:

1.  That the award of a works contract for Goschen Estate to Guildmore Ltd. for the sum of £6,454,990, commencing 20 January 2020 for a period of 74 weeks from site possession until approximately 16 July 2021. The proposed works will provide 17 new units within two blocks, be approved.

 

2.  That the scheme costs in paragraph 65 be noted.

Wards affected: Camberwell Green;

Lead officer: Michael Scorer


09/10/2019 - GW2 - Approval of the procurement services - Haddonfield Estate ref: 6942    Recommendations Approved

Contract award approval

Decision Maker: Strategic Director of Housing

Decision published: 10/10/2019

Effective from: 18/10/2019

Decision:

 

 

1.  That the award of a works contract for 14 new homes on land at Haddonfield Estate, SE8 to Guildmore Ltd in the sum of £4,229, 439 for a period of 52 weeks be approved.

 

2.  That the total scheme cost of £4,878,493 which includes associated on-costs of £437,582 and a 5% contingency sum of £211,472 be noted.

Wards affected: Rotherhithe;

Lead officer: Michael Scorer


04/09/2019 - GW2 - Approval of the procurement of contractor services - Rutley Close ref: 6923    Recommendations Approved

Contract award approval

Decision Maker: Strategic Director of Housing

Decision published: 05/09/2019

Effective from: 13/09/2019

Decision:

1.  That the award of a works contract for 39-44 Rutley Close, to Guildmore Ltd for the contract sum of £5,698,915 commencing from 9 December 2019 for a period of 84 weeks be approved.

 

2.  That the total scheme costs as detailed in paragraph 59 of the report be noted.

Wards affected: Newington;

Lead officer: Michael Scorer


13/08/2019 - Gateway 3: Continued access to London e-service for online sexual health testing ref: 6920    Recommendations Approved

To approve continued access to the Pan London sexual health e-service and associated spend

Decision Maker: Cabinet Member for Community Safety and Public Health

Decision published: 13/08/2019

Effective from: 21/08/2019

Decision:

1.  That a maximum spend on activity costs in the pan-London sexual health e-service, Sexual Health London (SHL), delivered by Preventx over the next 3-year period of the contract from 1 October 2019 to 30 September 2022 of £3,000,000, equivalent to £1,000,000 per annum be approved.

 

2.  That an estimated spend on sexual health e-service related-costs (non-activity costs) over the next 3-year period of the contract from 1 October 2019 to 30 September 2022 of £75,000, equivalent to £25,000 per annum be approved.

 

3.  That a continuation to the Inter-Authority Agreement (IAA) between the City of London Corporation and Southwark Council that enables Southwark to continue to access the pan-London sexual health e-service, Sexual Health London, delivered by Preventx, up to the maximum length of the contract be noted.

 

4.  That approval for the maximum annual spend for years 6-9 of the e-service contract and non-activity-related costs (1 October 2022 – 14 August 2026) will be sought no later than July 2022, through a separate gateway report be noted.

 

Wards affected: (All Wards);

Lead officer: Kevin Fenton


07/08/2019 - Outdoor events policy refresh ref: 6918    Recommendations Approved

To approve the policy refresh

Decision Maker: Deputy Leader and Cabinet Member for Culture, Leisure, Equalities and Communities

Decision published: 09/08/2019

Effective from: 17/08/2019

Decision:

That the new Outdoor Events Policy (Appendix 1 of the report) be approved.

Wards affected: (All Wards);

Lead officer: Rebecca Towers


07/08/2019 - East Dulwich and Peckham West controlled parking zone ref: 6916    Recommendations Approved

Approval to implement subject to statutory consultation

Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency

Decision published: 07/08/2019

Effective from: 15/08/2019

Decision:

1.  That the current recommended CPZ is split into two separate areas known as East Dulwich CPZ, with zone operational hours of 8.30am to 6.30pm, and Peckham West CPZ, with zone operational hours of Mon-Fri and 9am to 11am.

 

2.  The Peckham West CPZ to have the same boundaries as those proposed in the consultation process.  The East Dulwich boundary is to reflect Dulwich Community Council feedback to the interim revised boundaries.

 

3.  The implementation of each zone be subject to separate statutory consultation.

 

4.  That decisions relating to further minor amendments to the detailed engineering design be delegated to officers.

 

5.  That the statutory consultation be extended to longer than the minimum 21 days to allow consideration of the recommendations and to account for overlap with school holiday time if applicable.

 

6.  That any representations that cannot be entirely dealt with be brought back to the cabinet member for determination.

 

7.  That officers review the zone operation within six to nine months of implementation (subject to the outcome of necessary statutory procedures).

 

8.  That the public realm improvements included in the scheme design under the healthy streets approach be noted.

 

9.  That the financial implications of delivery detailed in the report be noted.

Wards affected: Dulwich Hill; Goose Green; Rye Lane;


31/07/2019 - South London Innovation Corridor programme funding agreement ref: 6915    Recommendations Approved

To approve the council’s entry into an agreement with Lambeth Council for £1,433,333 in Strategic Investment Pot grant funding to deliver workspace projects under the cross-borough South London Innovation Corridor programme.

Decision Maker: Cabinet Member for Jobs, Business and Innovation

Decision published: 31/07/2019

Effective from: 08/08/2019

Decision:

1.  That the council’s entry into an agreement with Lambeth Council for £1,433,333 in Strategic Investment Pot grant funding to deliver workspace projects under the cross-borough South London Innovation Corridor programme be approved.

 

2.  That the additional support for talent development and entrepreneurship in the creative digital industries for Southwark residents that will also be available under the programme be noted.

Wards affected: (All Wards);

Lead officer: Eleanor Kelly


18/07/2019 - Peckham Rye Bus Journey Time Improvements ref: 6911    Recommendations Approved

Approval of parking restrictions to assist with bus journey times

Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency

Decision published: 19/07/2019

Effective from: 27/07/2019

Decision:

That the implementation of double yellow lines on both sides of the road along Peckham Rye between Harris Boys Academy and Forest Hill Road as shown in the report and Appendix 1, subject to the necessary statutory consultation and procedures, be approved.

 

Wards affected: Dulwich Hill; Peckham Rye;


11/07/2019 - GW2 - Approval of the procurement of contractor services - Welsford Street ref: 6891    Recommendations Approved

Contract award approval

Decision Maker: Strategic Director of Housing

Decision published: 12/07/2019

Effective from: 20/07/2019

Decision:

1.  That the award of a works contract for Welsford Street, SE1 to Bonds Builders and Contractors Limited for a contract sum of £2,957,576 for a period of 52 weeks from site possession commencing 19 September 2019 be approved.

 

2.  That the total project costs as detailed in paragraph 59 of the report be noted. 

Wards affected: South Bermondsey;

Lead officer: Michael Scorer


01/07/2019 - Gateway 3 - Variation Decision Southwark Young People's 16+ Support and Resettlement Services ref: 6869    Recommendations Approved

To approve the contract variations for supported housing for 16+

Decision Maker: Strategic Director of Children and Adult Services

Decision published: 02/07/2019

Effective from: 01/07/2019

Decision:

That the contract extensions for the Southwark accommodation based service for young people and young people’s floating support service to the providers listed below for a period of up to three months from 1April to 30 June 2019 for an additional cost of  £195,044 be approved as detailed in Table 1 below:

 

Table 1

Provider

Annual Contract Value 2018-19

Contract Value Variation 1st April 2019 – 30th June 2019

Look Ahead Care and Support

407,863

101,965

The Salvation Army

273,463

68,365

Oasis Trust

98,859

24,714

Total

780,185

195,044

 

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton


25/06/2019 - Gateway 2 - Contract award approval for Peckham THI Phase 2 construction ref: 6859    Recommendations Approved

To award the award of contract for works to deliver Peckham THI Phase 2

Decision Maker: Strategic Director of Place and Wellbeing

Decision published: 26/06/2019

Effective from: 04/07/2019

Decision:

 

 

1.  That the appointment of Triton Building Restoration Limited (TBR) as the principal contractor to deliver Phase 2 of the Peckham Townscape Heritage Initiative (Peckham THI) Capital Works to the estimated value of £546,817 for an approximate duration of 35 weeks be approved.

 

2.  That it be noted that the contract once awarded will include provisions for variation to allow additional eligible properties to be included if necessary with any additional awards being approved through a subsequent Gateway 3.

 

Wards affected: Peckham;

Lead officer: Kevin Fenton


25/06/2019 - Positive Futures Fund - Phase One ref: 6858    Recommendations Approved

Phase One funding award in relation to applications received for Positive Futures Fund

Decision Maker: Cabinet Member for Community Safety and Public Health

Decision published: 25/06/2019

Effective from: 03/07/2019

Decision:

1.  That the funding recommendations (set out at paragraph 22 of the report)  for phase 1 of the Positive Futures Fund that aims to support community organisations to provide inspiring opportunities for young people that divert them away from crime be approved.

 

2.  That officers work with the applicant of the ‘Dear Future Me Project’ to further develop the proposal and to identify funding for the project (£225).

Wards affected: (All Wards);

Lead officer: Michael Scorer


21/06/2019 - Route Modernisation Plans (RMP) for Coldharbour Lane ref: 6857    Recommendations Approved

Extension to the hours of operation of the bus lane along Coldharbour Lane to 7am to 7pm Monday to Friday

Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency

Decision published: 21/06/2019

Effective from: 29/06/2019

Decision:

That the implementation of an extension to the hours of operation of the bus lane along Coldharbour Lane to 7am to 7pm Monday to Friday and conversion of existing single yellow lines to double yellow lines at the junction of Coldharbour Lane with Lowth Road, with Crawford Road, and outside No’s 58-66 Coldharbour Lane as shown in the report and design (Appendices 1A and 1B) be approved subject to the necessary statutory consultation and procedures.

Wards affected: Camberwell Green;

Lead officer: Dale Foden


18/06/2019 - Gateway 3: Contract variation in relation to Willow Walk and deed of settlement ref: 6856    Recommendations Approved

To approve a variation to the original contract for works at Willow Walk

Decision Maker: Strategic Director of Finance and Governance

Decision published: 20/06/2019

Effective from: 28/06/2019

Decision:

That the following be approved:

 

1.  The variation to Balfour Beatty Construction Ltd (‘Balfour Beatty’) for pre-construction services, early works and main works contracts in respect of the Willow Walk new temporary hostel accommodation and general needs housing project for a total variation of £1,156,761. This applies to each contract as follows:

 

2.  A variation to the contract with Balfour Beatty for pre-construction services (PCSA) relating to the Willow Walk new temporary hostel accommodation and general needs housing project. .

 

3.  A variation to the contract with Balfour Beatty for enabling works related to the Willow Walk new temporary hostel accommodation and general needs housing project.

 

4.  A variation to the contract with Balfour Beatty for main works related to the Willow Walk new temporary hostel accommodation and general needs housing project.

 

 

 

 

Wards affected: Borough & Bankside; St George's;

Lead officer: Kevin Fenton


19/06/2019 - Gateway 3: Northgate revenues and benefits managed services ref: 6855    Recommendations Approved

To extend the contract for the provision of managed service and support NPS revenues and benefits and Information@Work solutions with Northgate

Decision Maker: Strategic Director of Finance and Governance

Decision published: 19/06/2019

Effective from: 27/06/2019

Decision:

That the extension of the revenues and benefits information technology managed service contract with Northgate Public Service (UK) Ltd for a period of two years from 1 July 2019 to 30 June 2021 at an estimated yearly cost of £887,500 and total contract cost of £1,775,000 be approved.

Wards affected: (All Wards);

Lead officer: Duncan Whitfield


12/06/2019 - Gateway 2: Contract award approval for material supply ref: 6842    Recommendations Approved

To approve the award of contract

Decision Maker: Acting Strategic Director of Environment, Neighbourhoods and Growth

Decision published: 12/06/2019

Effective from: 20/06/2019

Decision:

That the contract award for the purchase of materials for Southwark Building Services, through an existing (Pretium) framework agreement from Travis Perkins Managed Services at an estimated cost of £1.5 million for a one year period from 10 June 2019 to 9 June 2020 be approved.

Wards affected: (All Wards);

Lead officer: Mick Lucas


11/06/2019 - Tenants and Residents Social Improvements Grant (TRSIG) 2019 - 20 ref: 6840    Recommendations Approved

Award of Tenants & Residents Social Improvements Grant (TRSIG) 2019/20

 

Decision Maker: Cabinet Member for Housing Management and Modernisation

Decision published: 12/06/2019

Effective from: 20/06/2019

Decision:

That the Tenants & Residents Social Improvements Grant (TRSIG) programme recommendations for 2019-20 for a total sum of £162,044.03 to the 26 organisations detailed in Appendix 1 be approved.

 

Wards affected: (All Wards);

Lead officer: Michael Scorer


11/06/2019 - Empowering Communities Programme - Creation of Democracy Fund and Ward Fund ref: 6841    Recommendations Approved

To create democracy fund and ward fund.

Decision Maker: Leader of the Council

Decision published: 12/06/2019

Effective from: 20/06/2019

Decision:

1.  That the introduction of a new Ward Fund (WF) for ward councillors to organise at least six ward based meetings a year be approved.

 

2.  That the creation of a Democracy Fund (DF) to allow communities to hold their own events/meetings to tackle local priorities be approved and that decisions relating to these events, after consultation with the council community champions, be delegated to the director of communities.

 

3.  That future ward fund decisions be delegated to the cabinet member for culture, leisure, equalities and communities.

 

4.  That Leader’s Question Time be replaced with an annual residents conference to be coordinated by community champions.

Wards affected: (All Wards);

Lead officer: Stephen Douglass


07/06/2019 - Harper Road and Bath Terrace trial width restrictions - Recommendation for width restrictions to be made permanent ref: 6838    Recommendations Approved

Updated description

 

To approve the retention, under a permanent traffic order, of width restriction at Harper Road and Bath Terrace operating as two 2 metre lanes reinforced with a central traffic island and bollards.

 

 

Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency

Decision published: 11/06/2019

Effective from: 19/06/2019

Decision:

a)  That the implementation of permanent width restrictions accessible to emergency services at Harper Road and Bath Terrace with camera enforcement, with estimated cost of £24,000 comprising of £19,200 for implementation works and £4,800 staff costs be approved.

 

b)  That it be noted that statutory objections to the traffic order will be formally considered and determined before a decision is made to amend, if needed, the new width restrictions.

Wards affected: Chaucer;

Lead officer: Mick Lucas


10/06/2019 - Paid Internships    Recommendations Approved

To agree a programme to deliver 500 paid internships as part of the council’s internship scheme.

Decision Maker: Cabinet

Decision due date: 16/07/2019

Wards affected: (All Wards);

Lead officer: Stephen Gaskell

Notice of decision: 10/06/2019


10/06/2019 - New Homes site purchase, SE15    Recommendations Approved

Decision Maker: Cabinet

Wards affected: Old Kent Road;

Notice of decision: 10/06/2019


31/05/2019 - Gateway 2 - Kirby Estate QHIP 18/19 ref: 6837    Recommendations Approved

Contract award approval – Kirby Estate QHIP

Decision Maker: Strategic Director of Housing

Decision published: 04/06/2019

Effective from: 12/06/2019

Decision:

That the award of the Kirby Estate QHIP 2018/19 via a mini-competition from the major works constructor framework to A&E Elkins Ltd for a period of 30 weeks be approved.

Wards affected: London Bridge & West Bermondsey;

Lead officer: Michael Scorer


31/05/2019 - GW2: Neckinger Estate QHIP 18/19 ref: 6836    Recommendations Approved

Contract award approval-Neckinger estate QHIP

Decision Maker: Strategic Director of Housing

Decision published: 03/06/2019

Effective from: 11/06/2019

Decision:

That the award of the Neckinger QHIP Estate 18-19 via a mini-competition from the major works constructor framework to A&E Elkins for a period of 26 weeks be approved.

Wards affected: London Bridge & West Bermondsey;

Lead officer: Michael Scorer


31/05/2019 - Gateway 2 - Contract award approval for main works for Flaxyard and Peckham Library Square

Authority to award contract to deliver new council homes on the Flaxyard and Peckham Library Square sites

Decision Maker: Strategic Director of Housing

Decision due date: 11/2019

Wards affected: Peckham;

Lead officer: Michael Scorer

Notice of decision: 31/05/2019


31/05/2019 - Gateway 2 (short form) - Contract award strategy - Removal of security grills and installation of new

Contract awards

Decision Maker: Strategic Director of Housing

Decision due date: 09/2019

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 31/05/2019


31/05/2019 - Gateway 2 - Contract award approval for East Dulwich Estate Environmental Works Phase 3

Authority to award contract for the Phase 3 environmental works on East Dulwich Estate

Decision Maker: Strategic Director of Housing

Decision due date: 08/2019

Wards affected: Champion Hill;

Lead officer: Bruce Glockling

Notice of decision: 31/05/2019


31/05/2019 - Gateway 3: Contracted variations in supported housing for mental health and mental health homelessness - Up to March 2020

To approve the contract variations

Decision Maker: Strategic Director of Children and Adult Services

Decision due date: 07/2019

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 31/05/2019


31/05/2019 - GW1 Children's Centres 2020-23

To approve grants to lead agencies for the delivery of the children’s centres programme for 01/04/2020 – 31/03/2024

Decision Maker: Strategic Director of Finance and Governance

Decision due date: 03/2020

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 31/05/2019


31/05/2019 - Rotherhithe Movement Plan Lower Road creating two way streets including Cycleway 4

Report that provides the results of the public consultation and seeks approval to move to design and construction

Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency

Decision due date: 06/2020

Wards affected: Rotherhithe; Surrey Docks;

Lead officer: Sally Crew

Notice of decision: 31/05/2019


31/05/2019 - Former tenant arrears write offs over £5,000 and under £50,000

Write off of former tenant arrears debts over £5,000 but under £50,000

Decision Maker: Cabinet Member for Finance, Performance and Brexit

Decision due date: 12/2019

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 31/05/2019


31/05/2019 - Rotherhithe Movement Plan Rotherhithe cycleway

Report that provides the results of the public consultation and seeks approval to move to design and construction

Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency

Decision due date: 11/2019

Wards affected: Rotherhithe; Surrey Docks;

Lead officer: Sally Crew

Notice of decision: 31/05/2019


31/05/2019 - Cycle Superhighway 4 (between Rotherhithe roundabout and Hawkstone Road)

Report that provides the results of the public consultation and seeks approval to move to design and construction

Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency

Decision due date: 11/2019

Wards affected: Rotherhithe;

Lead officer: Sally Crew

Notice of decision: 31/05/2019


31/05/2019 - National non-domestic rates write offs over £50,000 - February 2020

Write off of any NNDR debts over £50,000

Decision Maker: Cabinet

Decision due date: 02/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 31/05/2019


31/05/2019 - Treasury Management Strategy 2020-21 including capital strategy, annual investment strategy, prudential indicators and annual medium revenue provision statement

To note the treasury management strategy and agree the capital strategy, investment strategy, capital financial and treasury indicators, and provisions for debt

Decision Maker: Council Assembly

Decision due date: 02/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 31/05/2019


31/05/2019 - Policy and Resources Strategy: capital monitoring report, including capital programme update 2019-20

To note the forecast capital outturn position, and to approve amendments to the capital programme

Decision Maker: Cabinet

Decision due date: 03/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 31/05/2019


31/05/2019 - Policy and Resources Strategy: revenue monitoring report, including treasury management 2019-20

To note the forecast revenue outturn position, including treasury management

Decision Maker: Cabinet

Decision due date: 03/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 31/05/2019


31/05/2019 - Setting the council tax 2020-21

To set the council tax levels

Decision Maker: Council Assembly

Decision due date: 02/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 31/05/2019


31/05/2019 - Policy and Resources Strategy 2020-21 to 2022-23 update

To agree a 2020-21 general fund revenue budget, including fees and charges

Decision Maker: Council Assembly

Decision due date: 02/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 31/05/2019


31/05/2019 - Gateway 1 In house repairs 12 month review

Note 12 month review of in-house repairs service

Decision Maker: Cabinet

Decision due date: 10/2019

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 31/05/2019


31/05/2019 - Intermediate rent housing list - Feedback on consultation and agreeing the next steps    Recommendations Approved

To agree the next steps for the development of the new intermediate rent housing list

Decision Maker: Cabinet

Decision due date: 07/2019

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 31/05/2019


31/05/2019 - District Heating Strategy    Recommendations Approved

Approval of emerging district heating strategy including short-term projects, funding and enabling actions

Decision Maker: Cabinet

Decision due date: 07/2019

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 31/05/2019


31/05/2019 - Serious Youth Violence Panel    Recommendations Approved

To note the recommendations from the cross political party panel on serious youth violence and agree the timescale for the response

Decision Maker: Cabinet

Decision due date: 07/2019

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 31/05/2019


31/05/2019 - Old Vic Theater Annex    Recommendations Approved

To consider the community benefits and financing Annex proposals

Decision Maker: Cabinet

Decision due date: 07/2019

Wards affected: (All Wards);

Lead officer: Rebecca Towers

Notice of decision: 31/05/2019


31/05/2019 - Canada Water investment option

To create a budget so that, should the council so wish, it will be able to invest in the Canada Water masterplan scheme

Decision Maker: Cabinet

Decision due date: 07/2019

Wards affected: Rotherhithe; Surrey Docks;

Lead officer: Kevin Fenton

Notice of decision: 31/05/2019


31/05/2019 - Introduction of free healthy nursery meals    Recommendations Approved

Report outlines how free healthy nursery meals will be implemented over the next financial year

Decision Maker: Cabinet

Decision due date: 07/2019

Wards affected: (All Wards);

Lead officer: Kevin Fenton

Notice of decision: 31/05/2019


31/05/2019 - Generic Emergency Plan    Recommendations Approved

Agree the 2019-20 Emergency Plan

Decision Maker: Cabinet

Decision due date: 07/2019

Wards affected: (All Wards);

Lead officer: Stephen Gaskell

Notice of decision: 31/05/2019


31/05/2019 - Resident Involvement Framework

To agree the proposals for the new resident involvement framework following consultation

Decision Maker: Cabinet Member for Housing Management and Modernisation

Decision due date: 11/2019

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 31/05/2019


18/05/2019 - Reform of Community Councils: Empowering Communities Programme ref: 6829    Recommendations Approved

Decision Maker: Council Assembly

Made at meeting: 18/05/2019 - Council Assembly

Decision published: 30/05/2019

Effective from: 18/05/2019

Decision:

Councillor Rebecca Lury introduced the report.

 

Following debate (Councillor Anood Al-Samerai), the recommendations contained with the report were put to the vote and declared Carried.  

 

RESOLVED:

 

1.  That Council Assembly agreed the proposal to replace Community Councils (CCs) with a more flexible and devolved Empowering Communities Programme, that promotes:

 

·  Resident-led initiatives

·  Strengthens the local leadership role of ward councillors

·  Cabinet accountability

·  Community Champion councillors

·  Transparency of funding.

 

2.  That council assembly noted that there would still be opportunities to discuss Cleaner Greener Safer capital programmes (CGS), Devolved Highways, and Neighbourhoods Fund applications at ward meetings. Ward councillors will take the final decisions for their respective areas. This proposal retains the popular opportunity for residents to present funding proposals for their local area.

 

3.  That council assembly approved the creation of five Community Champions.

 

4.  That council assembly noted that the proposed changes will require changes to Article 8 and Part 3H of the Constitution and any other consequential constitutional changes.

 

5.  That council assembly noted that once the new structure is agreed, it would then be implemented for a year, during which time the effectiveness would be reviewed to ensure that any new model is as effective as possible in engaging the public.  There will be an update on how the process is working presented to the Constitutional Steering Panel followed by a full annual review which will include feedback from residents.  The purpose of these reviews is to ensure the changes are effective, inclusive and value for money.  There will be evaluation of individual meetings as they take place.

 

That council assembly noted that the following recommendations will be considered by the Leader as an IDM:

 

6.  To approve the creation of a Democracy Fund to allow communities to hold their own events/meetings to tackle local priorities.

 

7.  To approve the introduction of a new Ward Fund for ward councillors to organise at least six ward based meetings a year.

 

8.  To introduce the option for an Annual Residents' Conference.

 

9.  The leader will be asked to delegate executive functions for Neighbourhoods Fund, CGS and Devolved Highways to ward councillors.


18/05/2019 - Member Allowances Scheme 2019-2020 - amendment to special responsibility allowances ref: 6830    Information Only

Decision Maker: Council Assembly

Made at meeting: 18/05/2019 - Council Assembly

Decision published: 30/05/2019

Effective from: 18/05/2019

Decision:

The recommendations contained within the report were put to the vote and declared to be Carried.

 

RESOLVED:

 

1.  That council assembly approved an amendment to section 5 of the Member Allowances Scheme for 2019-2020 with effect from 18 May 2019 (see paragraphs 11 to 14 of the report), having regard to the update reports on community councils and overview and scrutiny committees being considered at this meeting.

 

2.  That council assembly noted that a notice of motion signed by 16 councillors has been received, as per council assembly procedure rules 1.11.2.


18/05/2019 - Nominations to London Councils Committees, Greater London Employment Forum, Borough Lead members, London Local Government Pension Scheme (LGPS) Common Investment Vehicle (CIV) Ltd. and London Councils Limited 2019/20 ref: 6832    Information Only

Decision Maker: Council Assembly

Made at meeting: 18/05/2019 - Council Assembly

Decision published: 30/05/2019

Effective from: 18/05/2019

Decision:

RESOLVED:

 

1.  LONDON COUNCILS LEADERS’ COMMITTEE (S101 JOINT COMMITTEE)

 

Note:  Council Assembly may only nominate cabinet members as representatives or deputies to this joint committee.

 

1 representative and up to 2 deputies

 

Labour nomination  Councillor Peter John

 

Deputies

 

Labour nominations  Councillors Rebecca Lury, Victoria Mills

 

2.  LONDON COUNCILS TRANSPORT AND ENVIRONMENT COMMITTEE (S101 ASSOCIATED JOINT COMMITTEE)

 

Note:  Council Assembly may only nominate cabinet members as representatives or deputies to this joint committee.

 

1 representative and up to 4 deputies

 

Labour nomination  Councillor Richard Livingstone

 

Deputies

 

Labour nominations  Councillor Johnson Situ

 

 

3.  LONDON COUNCILS GRANTS COMMITTEE (ASSOCIATED JOINT COMMITTEE)

 

Note:  Council Assembly may only nominate cabinet members as representatives or deputies to this joint committee

 

1 representative and up to 4 deputies

 

Labour nomination  Councillor Evelyn Akoto

 

Deputies

 

Labour nominations  Councillor Rebecca Lury

 

4.  LONDON LGBS COMMON INVESTMENT VEHICLE (CIV) LIMITED

 

1 representative and up to 2 deputies

 

Labour nomination  Councillor Victoria Mills

 

Deputy

 

Labour nomination  Councillor Peter John

 

5.  GREATER LONDON EMPLOYMENT FORUM

 

1 representative and 1 deputy

 

Labour nomination  Councillor Stephanie Cryan

 

Deputy

 

Labour nomination  Councillor Leo Pollak

 

6.  LONDON COUNCILS BOROUGH LEAD MEMBER – ARTS/CULTURE, TOURISM, SPORT AND LEISURE

 

Labour nomination  Councillor Rebecca Lury

 

7.  LONDON COUNCILS BOROUGH LEAD MEMBER – CHILDREN AND YOUNG PEOPLE/SAFEGUARDING AND SCHOOLS

 

Labour nomination  Councillor Jasmine Ali

 

8.  LONDON COUNCILS BOROUGH LEAD MEMBER – CRIME AND PUBLIC PROTECTION

 

Labour nomination  Councillor Evelyn Akoto

 

 

9.  LONDON COUNCILS BOROUGH LEAD MEMBER – ECONOMIC DEVELOPMENT/BUSINESS

 

Labour nomination  Councillor Stephanie Cryan

 

10.  LONDON COUNCILS BOROUGH LEAD MEMBER – FINANCE AND CORPORATE SERVICES

 

Labour nomination  Councillor Victoria Mills

 

11.  LONDON COUNCILS BOROUGH LEAD MEMBER – HEALTH AND SOCIAL CARE INCLUDING ADULT SERVICES

 

Labour nomination  Councillor Jasmine Ali

 

 

12.  LONDON COUNCILS BOROUGH LEAD MEMBER – HOUSING AND REGENERATION

 

Labour nomination  Councillor Kieron Williams

 

 

13.  LONDON COUNCILS BOROUGH LEAD MEMBER – PLANNING/ INFRASTRUCTURE/DEVELOPMENT

 

Labour nomination  Councillor Johnson Situ

 

14.  LONDON COUNCILS BOROUGH LEAD MEMBER – SKILLS AND EMPLOYMENT

 

Labour nomination  Councillor Stephanie Cryan

 

15.  LONDON COUNCILS LIMITED

 

1 representative

 

Labour nomination  Councillor Peter John


18/05/2019 - Election of the Mayor ref: 6821    Recommendations Approved

Decision Maker: Council Assembly

Made at meeting: 18/05/2019 - Council Assembly

Decision published: 30/05/2019

Effective from: 18/05/2019

Decision:

The outgoing Mayor, Councillor Catherine Rose, welcomed everyone to the meeting. 

 

The outgoing Mayor announced that the leaders of each political group wished to make a statement.

 

Thereafter, Councillors Peter John and Anood Al-Samerai paid tribute to the outgoing Mayor.

 

The outgoing Mayor asked for nominations for Mayor for the ensuing municipal year 2019-20.

 

Councillor Peter John, seconded by Councillor Stephanie Cryan, moved that Councillor Sandra Rhule be elected Mayor of the London Borough of Southwark for the municipal year 2019-20.

 

The nomination was put to the vote and it was:

 

RESOLVED:  That Councillor Sandra Rhule be elected Mayor for the 2019-20 municipal year.

 

Councillor Sandra Rhule accepted the office of Mayor.  The outgoing Mayor declared that Councillor Sandra Rhule was duly elected Mayor of Southwark for 2019-20. 

 

The retiring Mayor, Councillor Catherine Rose, invested the new Mayor, Councillor Sandra Rhule, with the badge of office.  The new Mayor signed the declaration of acceptance of office and took the chair. 

 

Thereafter, the outgoing Mayor was presented with a replica of the Mayoral badge of the London Borough of Southwark.

 

The new Mayor stated that she appointed Councillor Lorraine Lauder MBE as the Mayor's consort. The new Mayor’s consort was presented with a badge.

 

The new Mayor appointed Councillor Barrie Hargrove as Deputy Mayor.  The Deputy Mayor was invested with the badge of office.

 

The outgoing Mayor, Councillor Catherine Rose, gave her outgoing speech. 

 

The new Mayor gave her incoming speech and announced that her chosen charities would be the MumMum Foundation, Camberwell Choir School and Art Academy London.


18/05/2019 - Changes to scrutiny arrangements for 2019-20 ref: 6827    Information Only

Decision Maker: Council Assembly

Made at meeting: 18/05/2019 - Council Assembly

Decision published: 30/05/2019

Effective from: 18/05/2019

Decision:

The recommendations contained within the report were put to the vote and declared to be Carried.

 

RESOLVED:

 

1.  That the constitutional changes to the scrutiny article and procedure rules as set out in appendices as agreed at Constitutional Steering Panel 1 May 2019 be agreed.

 

2.  That the proposals at paragraph 7 of the report for the practical operation of scrutiny be noted.


18/05/2019 - Announcements from the mayor, members of the cabinet or chief executive ref: 6822    Information Only

Decision Maker: Council Assembly

Made at meeting: 18/05/2019 - Council Assembly

Decision published: 30/05/2019

Effective from: 18/05/2019

Decision:


Councillors Peter John and David Noakes paid tribute to Marion Marples, a noted local teacher, community worker and recipient of the Honorary Liberty of the Old Metropolitan Borough of Southwark, who passed away suddenly on 30 April 2019.

 

At this point, the meeting agreed the programme motion.

 

RESOLVED:

 

The order of business and timings for the meeting will be as follows:

 

Time

Business

12:00 - 12:15

1. Preliminary business and announcements

12:15 – 13:30*

3. Reports

3.1: Executive Functions

3.2: Reform of Community Councils: Empowering Communities Programme

3.3: Changes to Scrutiny Arrangements

3.4: Member Allowances Scheme 2019-20 – Amendment to Special Responsibility Allowances

3.5: Establishment of Committees, Panels and Related Matters

3.6: Nominations to London Councils Committees, Greater London Employment Forum, Borough Lead members,  London Local Government Pension Scheme (LGPS) Common Investment Vehicle (CIV) Ltd and London Councils Limited 2019-20

 

Note:  Start time is approximate; the meeting will commence at the rise of the civic awards ceremony. Any time left remaining will be rolled into the next items.

 

* subject to the guillotine rule; maximum 15 minutes debate per item.

 

That the meeting be conducted as follows:

 

Item 3.5 Establishment of committees, panels and related matters

 

To seek the meeting's consent to suspend council assembly procedure rule 4.5.2 in relation to the number of reserve members on the planning committee and agree that the group whips may appoint additional reserve members as follows:

 

Planning Committee – 8 Places

 

Labour (6)

Liberal Democrat (2)

Reserves

 

Labour (6)

Liberal Democrat (2)

 

 


18/05/2019 - Establishment of Committees, Panels and Related Matters 2019-20 ref: 6826    Information Only

Decision Maker: Council Assembly

Made at meeting: 18/05/2019 - Council Assembly

Decision published: 30/05/2019

Effective from: 18/05/2019

Decision:

The nominations for chairs and vice chairs of committees and the nominations to the Local Government Association General Assembly were circulated. 

 

There were three contested positions.

 

The position of chair of overview and scrutiny committee was put to the vote, and it was agreed that Councillor Ian Wingfield be appointed chair of overview and scrutiny committee.

 

The position of vice-chair of planning committee was put to the vote, and it was agreed that Councillor Kath Whittam be appointed vice-chair of planning committee.

 

The position of community champion for the north-east area was put to the vote, and it was agreed that Councillor Sunny Lambe be appointed community champion for the north-east area.

 

The substantive motion was carried.

 

RESOLVED:

 

1.  That council assembly noted the appointment of political group leaders, deputies and whips.

 

LABOUR GROUP

 

Leader  Councillor Peter John

 

Deputy Leader  Councillor Rebecca Lury

 

Chief Whip  Councillor Sarah King

 

LIBERAL DEMOCRAT GROUP

 

Leader  Councillor Anood Al-Samerai

 

Deputy Leader  Councillor William Houngbo

 

Chief Whip  Councillor Hamish McCallum

 

2.  That council assembly noted the political balance of the council as set out in the report

 

3.  That council assembly noted that with one independent member on the council, there is no change to proportionality; the allocation of seats on committees and panels, as agreed by council assembly on 11 July 2018, remains the same as set out below.

 

4.  That council assembly established the following committees for the coming municipal year 2019-20:

 

Table 2: Ordinary Committees - Total number of seats 29

 

Committee

Total

Lab

Lib Dem

Committee 1

Appointments Committee

7

6 

1

Committee 2

Planning Committee

8

6

2 

Committee 3

Audit, Governance and Standards Committee

7

 

5

 

2

 

Committee 4

Corporate Parenting Committee

7

6

1 

Total

29

23

 6

 

Table 3: Other committees - Total number of seats 26

 

Committee

Total

Lab

Lib Dem

Overview and Scrutiny Committee

11

8

3

Licensing Committee

15

12

3

Total

26

20

 6

 

Note: The political balance rules require that the political groups represented on council have proportionate representation on council committees. A political group must comprise at least two members, so the one Independent member does not constitute a political group. Councils can allocate seats on committees to members not aligned to a group, but are under no statutory obligation to do so.

 

Table 4: Multi-ward areas

 

1.

North-west

2.

North-east

3.

West-central

4.

East-central

5.

South

 

Note:  The composition of multi-ward areas will be set out in Article 8 of the constitution(see paragraphs 42 to 43 of the report).

 

Health and wellbeing board

 

5.  That the health and wellbeing board be established as a committee of the council under the Health and Social Care Act 2012 with the membership set out in paragraph 39 of the report. 

 

6.  That it be noted that the local authority membership is nominated by the leader of the council. In accordance with committee procedure rules, the board is chaired by the leader.

 

Appointment of chairs and vice chairs

 

7.  That council assembly appoint chairs and vice chairs for the following committees:

 

APPOINTMENTS COMMITTEE

 

Chair - Councillor Peter John

Vice chair – Vacant

 

AUDIT, GOVERNANCE AND STANDARDS COMMITTEE

 

Chair - Councillor James McAsh

Vice chair – Vacant

 

CORPORATE PARENTING COMMITTEE

 

Chair -  Councillor Jasmine Ali (Appointment of cabinet member with the responsibility for children and schools formally noted)

Vice chair – Vacant

 

LICENSING COMMITTEE

 

Chair - Councillor Renata Hamvas

Vice chair - Councillor Adele Morris

 

OVERVIEW & SCRUTINY COMMITTEE

 

Chair - Councillor Ian Wingfield

Vice chair - Councillor Jane Salmon

 

PLANNING COMMITTEE

 

Chari - Councillor Martin Seaton

Vice Chair - Councillor Kath Whittam

 

All outstanding appointments will be referred to the first meeting of the respective committee in the 2019-20 municipal year.

 

Appointment of community champions

 

8.  That council assembly appointed community champions for the following multi-ward areas:

 

 

Councillor

Multi-ward area

1.

David Noakes

North-west

Deputy

Karl Eastham

North-west

2.

Sunny Lambe

North-east

Deputy

Leanne Werner

North-east

3.

Dora Dixon-Fyle

West Central

Deputy

Jason Ochere

West Central

4.

Sunil Chopra

East Central

Deputy

Vikki Mills

East Central

5.

Andy Simmons

South

Deputy

Margy Newens

South

 

Establishment of the council’s panels

 

9.  That council assembly established the following council panels (see paragraph 56 of the report):

 

Table 5: Panels - Total number of seats 16

 

Panel

Total

Lab

Lib Dem

Council assembly business panel

4

3

1

Constitutional steering panel

4

3

1

Pensions advisory panel

3

2

1

Voluntary bodies appointments panel

5

4

1

Total

16

12

4

 

Note: This table is based on the panels established in 2018-19.

 

Appointments of chair to constitutional steering panel and voluntary bodies appointments panel

 

10.  That Councillor Sarah King be appointed chair of the Constitutional Steering Panel.

 

Notes:

 

1.  That it be noted that the council assembly business panel is chaired by the Mayor.

 

Urgency committee

 

11.  That the role of the urgency committee between a municipal election and the annual meeting of council assembly, as agreed by council assembly on 26 March 2014, be noted as set out in paragraphs 58 and 59 of the report.

 

Appointments to Local Government Association (LGA) General Assembly

 

12.  That council assembly appointed up to three representatives and allocates the seven votes to representatives to attend the LGA General Assembly (see paragraphs 58 and 59 of the report).

 

Representative

No. of votes

Group

To be nominated by whip

3

Labour

To be nominated by whip

3

Labour

To be nominated by whip

1

Liberal Democrat

 

Other appointments to joint committees/outside bodies

 

13.  That council assembly noted the cabinet and other committees will make appointments to all other outside committees and bodies for the municipal year 2019-20 as required by part 3Q of the constitution.


18/05/2019 - Amendments ref: 6831    Recommendations Approved

Decision Maker: Council Assembly

Made at meeting: 18/05/2019 - Council Assembly

Decision published: 30/05/2019

Effective from: 18/05/2019

Decision:

There were none.


01/05/2019 - Council Plan Annual Performance Report 2018-19    Recommendations Approved

To note performance against the council plan 2018 – 2022

Decision Maker: Cabinet

Decision due date: 07/2019

Wards affected: (All Wards);

Lead officer: Eleanor Kelly

Notice of decision: 01/05/2019


01/05/2019 - Faith Strategy Action Plan

Report that outlines how we will deliver the faith strategy agreed in March 2019

Decision Maker: Cabinet

Decision due date: 01/2020

Wards affected: (All Wards);

Lead officer: Kevin Fenton

Notice of decision: 01/05/2019


01/05/2019 - Approach to community engagement    Recommendations Approved

Report that outlines how we will deliver the vision and principles agreed at April Cabinet

Decision Maker: Cabinet

Decision due date: 09/2019

Wards affected: (All Wards);

Lead officer: Kevin Fenton

Notice of decision: 01/05/2019


01/05/2019 - GW2: Contract Award for FM Contract for the council's operational estate

Contract award approval

Decision Maker: Cabinet

Decision due date: 12/2019

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 01/05/2019


01/05/2019 - Gateway 1 - Procurement Strategy Approval for main works Flaxyard and Peckham Library Square

Authority to tender for a contractor to deliver new council homes on the Flaxyard and Peckham Library Square sites

Decision Maker: Strategic Director of Housing

Decision due date: 08/2019

Wards affected: Peckham;

Lead officer: Michael Scorer

Notice of decision: 01/05/2019


01/05/2019 - GW3: Extension to the Consolidated Facilities Management Contract

Extension of the current contract

Decision Maker: Cabinet Member for Housing Management and Modernisation

Decision due date: 09/2019

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 01/05/2019


01/05/2019 - Policy and Resources Strategy 2020-21 to 2022-23 update

To note the council’s deliberations for the 2020-21 general fund revenue budget and agree the next step in the budgeting process

Decision Maker: Cabinet

Decision due date: 01/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/05/2019


01/05/2019 - Approval of the Housing Revenue Account Budget 2020-21 and rent setting    Recommendations Approved

To approve the HRA budget for 2020-21 and rent setting

Decision Maker: Cabinet

Decision due date: 01/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/05/2019


01/05/2019 - Gateway 1: Procurement Strategy approval community advice services

Approval of the procurement strategy 2020 to 2025

Decision Maker: Deputy Leader and Cabinet Member for Culture, Leisure, Equalities and Communities

Decision due date: 07/2019

Wards affected: (All Wards);

Lead officer: Kevin Fenton

Notice of decision: 01/05/2019


01/05/2019 - Gateway 2: Lost Peck Flood Alleviation & Environmental Improvement Scheme

Approval to procure scheme implementation through the EA’s Next Generation Supplier Arrangement (NGSA) subject to securing FDGIA funding

Decision Maker: Acting Strategic Director of Environment, Neighbourhoods and Growth

Decision due date: 02/2021

Wards affected: Peckham Rye;

Lead officer: Caroline Bruce

Notice of decision: 01/05/2019


01/05/2019 - Polling district and polling station review

Statutory polling district and polling station review

Decision Maker: Strategic Director of Finance and Governance

Decision due date: 07/2019

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/05/2019


01/04/2019 - GW2 - Approval of the procurement of contractor services 66 Linden Grove

Contract award approval

Decision Maker: Strategic Director of Housing

Decision due date: 08/2021

Wards affected: Nunhead & Queen's Road;

Lead officer: Michael Scorer

Notice of decision: 01/04/2019


01/04/2019 - Gateway 2: Contract award approval for general building repair works

To approve the award of contract

Decision Maker: Acting Strategic Director of Environment, Neighbourhoods and Growth

Decision due date: 10/2019

Wards affected: (All Wards);

Lead officer: Mick Lucas

Notice of decision: 01/04/2019


01/04/2019 - Gateway 1: Housing Aids and Adaptations Contracts (North & South)

Procurement Strategy Approval

Decision Maker: Strategic Director of Housing

Decision due date: 10/2019

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 01/04/2019


01/04/2019 - Council tax write offs over £5,000 and under £50,000

Write off of council tax debts over £5,000 but under £50,000

Decision Maker: Cabinet Member for Finance, Performance and Brexit

Decision due date: 12/2019

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/04/2019


01/04/2019 - Housing benefit overpayment write offs over £5,000 and under £50,000

Write off of housing benefit overpayment debts over £5,000 but under £50,000

Decision Maker: Cabinet Member for Finance, Performance and Brexit

Decision due date: 12/2019

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/04/2019


01/04/2019 - National non-domestic rates write offs over £5,000 and under £50,000

Write off of NNDR debts over £5,000 but under £50,000

Decision Maker: Cabinet Member for Finance, Performance and Brexit

Decision due date: 12/2019

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/04/2019


01/04/2019 - Policy and Resources Strategy 2020-21 to 2022-23 update

To note the council’s deliberations for the 2020-21 general fund revenue budget and agree the next step in the budgeting process and the 2020-21 fees and charges.

Decision Maker: Cabinet

Decision due date: 12/2019

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/04/2019


01/04/2019 - Indicative HRA budget and rent setting 2020-21

To note the draft HRA budget and indicative rent increase

Decision Maker: Cabinet

Decision due date: 12/2019

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/04/2019


01/04/2019 - Council tax base 2020-21

To set the council tax base and note that the NNDR base will be signed off by the s.151 officer

Decision Maker: Cabinet

Decision due date: 12/2019

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/04/2019


01/04/2019 - Southwark Late Night Levy Consultation

To consider the implementation of a late night levy within the borough

Decision Maker: Council Assembly

Decision due date: 07/2019

Wards affected: (All Wards);

Lead officer: Mick Lucas

Notice of decision: 01/04/2019


01/04/2019 - Creative Southwark: Cultural strategy mid-term review    Recommendations Approved

To consider the mid-term review of Creative Southwark: cultural strategy 2017 to 2022 noting achievements and emerging priorities

Decision Maker: Cabinet

Decision due date: 07/2019

Wards affected: (All Wards);

Lead officer: Rebecca Towers

Notice of decision: 01/04/2019


01/04/2019 - Gateway 1: Care at Home - Additional Provision (adults)    Recommendations Approved

Report seeking approval to procure care at home additional provision (adults)

Decision Maker: Cabinet

Decision due date: 10/2019

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 01/04/2019


01/04/2019 - Annual Home Care Report    Recommendations Approved

Care at Home update

Decision Maker: Cabinet

Decision due date: 10/2019

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 01/04/2019


01/04/2019 - Disposal of freehold interest in 4 D'Eynsford Road, London SE5

Dispose of the council’s freehold interest to facilitate the development of a new care home in support of the corporate commitment towards improved provision in the borough.

Decision Maker: Cabinet

Decision due date: 03/2020

Lead officer: Kevin Fenton

Notice of decision: 01/04/2019


01/03/2019 - Treasury Management - mid year update 2019-20

To note treasury management operational activity at mid-year

Decision Maker: Council Assembly

Decision due date: 11/2019

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/03/2019


01/03/2019 - National non-domestic rates write offs over £50,000 - October 2019

To write off any NNDR debts over £50,000

Decision Maker: Cabinet

Decision due date: 10/2019

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/03/2019


01/03/2019 - Pupil Place Planning Report    Recommendations Approved

Report seeking to inform members as to the adequacy of provision of primary and secondary school places

Decision Maker: Cabinet

Decision due date: 10/2019

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 01/03/2019


01/03/2019 - School Standards Yearly Report

Report seeking to inform members of School Standards Yearly Report

Decision Maker: Cabinet

Decision due date: 12/2019

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 01/03/2019


01/03/2019 - Gateway 1: The Provision of Mental Health Supported Housing and Outreach Services

Report seeking approval for the procurement of the delivery of supported housing and homelessness services for people with mental health issues

Decision Maker: Cabinet

Decision due date: 06/2021

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 01/03/2019


01/02/2019 - Housing allocations scheme

Authorise the proposed housing allocations scheme to be the subject of a formal 12 week consultation period

Decision Maker: Cabinet

Decision due date: 01/2020

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 01/02/2019


01/02/2019 - Youth Justice Plan 2019-20

To approve the youth justice plan 2019-20, which is an annual review of the provision of youth justice services and the functions of the Youth Offending services as required by Section 40 of the Crime and Disorder Act 1998

Decision Maker: Council Assembly

Decision due date: 07/2019

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 01/02/2019


01/02/2019 - Adoption of new library bylaws under Section 19 of the Public Libraries and Museums Act 1964

Council to adopt new library bylaws

Decision Maker: Council Assembly

Decision due date: 07/2019

Wards affected: (All Wards);

Lead officer: Rebecca Towers

Notice of decision: 01/02/2019


01/02/2019 - Gateway 1: The provision of learning disabilities support and accommodation services

Report seeking approval for the procurement of the delivery of support and accommodation services for people with learning disabilities

Decision Maker: Cabinet

Decision due date: 03/2020

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 01/02/2019


02/01/2019 - Council tax write offs over £5,000 and under £50,000

Write off of council tax debts over £5,000 but under £50,000

Decision Maker: Cabinet Member for Finance, Performance and Brexit

Decision due date: 09/2019

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 02/01/2019


02/01/2019 - Former tenants arrears write offs over £5,000 and under £50,000

Write off of former tenant arrears debts over £5,000 but under £50,000

Decision Maker: Cabinet Member for Finance, Performance and Brexit

Decision due date: 09/2019

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 02/01/2019


02/01/2019 - Housing benefit overpayment write offs over £5,000 and under £50,000

Write off of housing benefit overpayment debts over £5,000 but under £50,000

Decision Maker: Cabinet Member for Finance, Performance and Brexit

Decision due date: 09/2019

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 02/01/2019


02/01/2019 - National non-domestic rates write offs over £5,000 and under £50,000

Write off of NNDR debts over £5,000 but under £50,000

Decision Maker: Cabinet Member for Finance, Performance and Brexit

Decision due date: 09/2019

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 02/01/2019


02/01/2019 - National non-domestic rates write offs over £50,000 - September 2019

To write off any NNDR debts over £50,000

Decision Maker: Cabinet

Decision due date: 09/2019

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 02/01/2019


02/01/2019 - Policy and Resources Strategy: capital monitoring report, including capital programme update 2019-20    Recommendations Approved

To note the forecast capital outturn position and to approve amendments to the capital programme

Decision Maker: Cabinet

Decision due date: 09/2019

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 02/01/2019


02/01/2019 - Policy and Resources Strategy: revenue monitoring report, including treasury management 2019-20    Recommendations Approved

To note the forecast revenue outturn position, including treasury management

Decision Maker: Cabinet

Decision due date: 09/2019

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 02/01/2019


02/01/2019 - Policy and Resources Strategy: financial remit 2020-21 and scene setting    Recommendations Approved

To note the financial remit for 2020-21

Decision Maker: Cabinet

Decision due date: 07/2019

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 02/01/2019


02/01/2019 - Policy and Resources Strategy 2020-21 to 2022-23    Recommendations Approved

To note the outcomes and implications of the local government funding position for the council to agree the MTFS

Decision Maker: Cabinet

Decision due date: 09/2019

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 02/01/2019


30/11/2018 - LBS Housing Rents Income Collection Policy    Recommendations Approved

To note new rent income collection policy developed in response to Government welfare reform and Universal Credit

Decision Maker: Cabinet

Decision due date: 07/2019

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 30/11/2018


30/11/2018 - Joint Strategic Needs Assessment on serious youth violence    Recommendations Approved

Interim youth report on joint strategic needs assessment and framework for public health approach to preventing youth violence

Decision Maker: Cabinet

Decision due date: 10/2019

Wards affected: (All Wards);

Lead officer: Kevin Fenton

Notice of decision: 30/11/2018


06/11/2018 - GW2: Print document management services

Contract award for a replacement print document management service

Decision Maker: Cabinet Member for Housing Management and Modernisation

Decision due date: 09/2019

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 01/11/2018


06/11/2018 - Treasury Management Performance - 2018-19 annual report and prudential indicators

To note the treasury management performance and outturn for prudential indicators on capital finance, debt and investments 2018-19

Decision Maker: Council Assembly

Decision due date: 07/2019

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/11/2018


01/10/2018 - Gateway 1 - Major Building Works    Recommendations Approved

Procurement Strategy Approval

Decision Maker: Cabinet

Decision due date: 07/2020

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 01/10/2018


01/06/2018 - GW2 Professional Technical Services

Contract award approval of the provision of professional technical services to the major works team on the delivery of the housing capital programme

Decision Maker: Cabinet Member for Council Homes and Homelessness

Decision due date: 07/2021

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 01/06/2018


01/12/2017 - Peckham QHIP 2018-2019 - Batch 5

To approve the upcoming major works programme under JCT Framework tender.

Decision Maker: Strategic Director of Housing

Decision due date: 01/2020

Wards affected: Peckham;

Lead officer: Michael Scorer

Notice of decision: 01/12/2017


01/11/2017 - Elephant and Castle Centre Compulsory Purchase Order

To seek compulsory purchase powers that may be needed to secure the consented redevelopment of the Elephant and Castle Shopping Centre

Decision Maker: Cabinet

Decision due date: 03/2020

Wards affected: North Walworth; St George's;

Lead officer: Kevin Fenton

Notice of decision: 01/11/2017


01/11/2017 - Elephant and Castle shopping centre progress report

To provide the progress report called for by Cabinet on 9 May 2017 and to set out next steps to deliver a new shopping centre.

Decision Maker: Cabinet

Decision due date: 03/2020

Wards affected: North Walworth; St George's;

Lead officer: Kevin Fenton

Notice of decision: 01/11/2017


01/11/2017 - Gateway 2: Contract award approval - Southwark Athletics Centre Building (Main Contractor)

To approve the award of contract

Decision Maker: Strategic Director of Environment and Social Regeneration

Decision due date: 01/2020

Wards affected: Peckham Rye;

Lead officer: Rebecca Towers

Notice of decision: 01/11/2017


01/11/2017 - Gateway 2: Contract Award approval for the delivery of Mixed Tenure Development, Schools and Commercial units at Beormund School Site - Southwark Regeneration in Partnership - Lot A5

To approve the award of contract

Decision Maker: Cabinet

Decision due date: 06/2020

Wards affected: (All Wards);

Lead officer: Kevin Fenton

Notice of decision: 01/11/2017


03/03/2016 - Gateway 1: Procurement strategy approval - reablement services

Report seeking approval to procure a new supplier of reablement services

Decision Maker: Cabinet

Decision due date: 03/2020

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 03/03/2016