To approve the award of the stage 1 contract for works in relation to Cator Street (2)
Decision Maker: Strategic Director of Housing
Decision published: 08/03/2021
Effective from: 16/03/2021
Decision:
1. That in consultation with the cabinet member for housing prior approval be formalised of the revised procurement strategy for the enabling works package as set out in paragraph 12 of the report.
2. That in consultation with the cabinet member for housing that the award of the pre-construction services agreement (PCSA), stage one of the design and build contract, for the construction of 50 extra care housing units, additional seven wheelchair units and a multi-purpose community space to Engie Regeneration Limited in the sum of £724,500 for a period of 30 weeks commencing on 16 March 2021 be approved.
3. That in consultation with the cabinet member for housing that the award of the enabling works package, to run concurrently with the PCSA, for the substation relocation to Engie Regeneration Limited for the sum of £370,500 be approved.
4. That in consultation with the cabinet member for housing that the client contingency sums as set out in paragraph 89 of the closed report be noted.
Wards affected: Peckham;
Lead officer: Michael Scorer
Contract award approval
Decision Maker: Strategic Director of Housing
Decision published: 18/05/2020
Effective from: 27/05/2020
Decision:
1. That the award of a works contract for 13 new homes at Sedgmoor Place SE5 to Neilcott Construction Limited for a period of 65 weeks including mobilisation be approved.
2. That it be noted the total scheme cost includes associated on-costs and a 5% contingency sum.
Wards affected: St Giles;
Lead officer: Michael Scorer
That the Sydenham Hill 20mph scheme be approved for implementation, as shown in the draft outline design (Appendix A), subject to amendments proposed in the consultation summary report and the necessary statutory procedures.
Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency
Decision due date: 04/2020
Wards affected: Dulwich Wood;
Lead officer: Caroline Bruce
Notice of decision: 01/07/2019
Contract award approval
Decision Maker: Strategic Director of Housing
Decision published: 01/04/2020
Effective from: 09/04/2020
Decision:
That the award of a works contract for 26 new homes on land at Salisbury Close Estate, SE17 to Glenman Limited for a period of 83 weeks be approved.
Wards affected: North Walworth;
Lead officer: Michael Scorer
To approve a write-off of £190,458.64 of debt (multiple write-offs).
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision published: 25/02/2020
Effective from: 04/03/2020
Decision:
That the write offs of £190,458.64 of debt detailed in Appendix 1 of the report (multiple write-offs) be approved.
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
To approve the award of contract for design and build contract in relation to 145 – 147 Walworth Road
Decision Maker: Acting Strategic Director of Environment, Neighbourhoods and Growth
Decision published: 19/12/2019
Effective from: 19/12/2019
Decision:
That the award of contract to Lendlease to deliver the Design and Build for Walworth Library and Southwark Heritage Centre to a value of £3,250,000 (including a 10% works contingency to be held by the client) to commence on 20 December 2019 for a period of 2 years be approved.
Wards affected: North Walworth;
Lead officer: Rebecca Towers
Approval of the overarching grant agreement with Leathermarket CBS to deliver 161 council homes.
Decision Maker: Cabinet
Decision due date: 17/12/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/05/2019
To approve the implementation of a CPZ with the Rotherhithe and Surrey Docks wards
Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency
Decision published: 20/11/2019
Effective from: 28/11/2019
Decision:
1. That the implementation of a new parking zone in the Rotherhithe and Surrey Docks area, operating Monday to Friday, 8.30am to 6.30pm and subject to the outcome of any necessary statutory procedures be approved.
2. That a further report be brought forward should there be any statutory objections to the traffic order required to implement the new parking zone.
3. That the position and type of parking bays and restrictions for the new parking zone and surrounding streets as shown in the outline design save for any amendments which may be required at the implementation stage be approved and would be determined by officers (Appendix B).
Wards affected: Rotherhithe; Surrey Docks;
Lead officer: Caroline Bruce
Contract award approval
Decision Maker: Strategic Director of Housing
Decision published: 22/10/2019
Effective from: 30/10/2019
Decision:
That the award of a works contract for Rye Hill park Garages, to Engie Regeneration Ltd for the contract sum of £6,039,681 commencing from 17 February 2020 for a period of 70 weeks be approved.
That the total scheme cost as detailed in paragraph 59 be noted.
Wards affected: Peckham Rye;
Lead officer: Michael Scorer
Contract award approval
Decision Maker: Strategic Director of Housing
Decision published: 21/10/2019
Effective from: 29/10/2019
Decision:
1. That the award of a works contract for Goschen Estate to Guildmore Ltd. for the sum of £6,454,990, commencing 20 January 2020 for a period of 74 weeks from site possession until approximately 16 July 2021. The proposed works will provide 17 new units within two blocks, be approved.
2. That the scheme costs in paragraph 65 be noted.
Wards affected: Camberwell Green;
Lead officer: Michael Scorer
Contract award approval
Decision Maker: Strategic Director of Housing
Decision published: 10/10/2019
Effective from: 18/10/2019
Decision:
1. That the award of a works contract for 14 new homes on land at Haddonfield Estate, SE8 to Guildmore Ltd in the sum of £4,229, 439 for a period of 52 weeks be approved.
2. That the total scheme cost of £4,878,493 which includes associated on-costs of £437,582 and a 5% contingency sum of £211,472 be noted.
Wards affected: Rotherhithe;
Lead officer: Michael Scorer
To agree a 2 year extension to the contract
Decision Maker: Strategic Director of Finance and Governance
Decision published: 05/09/2019
Effective from: 13/09/2019
Decision:
That the variation of the goods removals, storage and disposal call-off contract to Harrow Green Ltd to extend the term for a period of 2 years from 1 October 2019 at a maximum estimated contract value of £1.24m be approved.
Wards affected: (All Wards);
Lead officer: Michael Scorer
Contract award approval
Decision Maker: Strategic Director of Housing
Decision published: 05/09/2019
Effective from: 13/09/2019
Decision:
1. That the award of a works contract for 39-44 Rutley Close, to Guildmore Ltd for the contract sum of £5,698,915 commencing from 9 December 2019 for a period of 84 weeks be approved.
2. That the total scheme costs as detailed in paragraph 59 of the report be noted.
Wards affected: Newington;
Lead officer: Michael Scorer
To note the strategic options assessment for delivery of these services for Southwark Council and approve the next steps
Decision Maker: Cabinet Member for Community Safety and Public Health
Decision published: 26/07/2019
Effective from: 03/08/2019
Decision:
1. That the Strategic Options Assessment for delivery of Children and Young People’s (0 – 19) Public Health services for Southwark Council, and the recommendation set out at paragraph 87 of the report to consider securing external provision for this service, be approved.
2. That the next steps set out in the report be noted:
· the council to work with the commissioned services to engage with the community on the proposed outcomes for the services;
· the council to conduct an open book accounting exercise with the commissioned services, in order to inform future changes to services; and,
· the council to conduct further work on a detailed procurement strategy for the re-commissioning of the service against the proposed outcomes, once they are agreed, to be presented to cabinet for decision.
Wards affected: (All Wards);
Lead officer: Kevin Fenton
Appointment of a works contractor for the Camberwell Old Cemetery Area Z Placement landscaping and finishing works.
Decision Maker: Acting Strategic Director of Environment, Neighbourhoods and Growth
Decision published: 25/07/2019
Effective from: 02/08/2019
Decision:
1. That the award for the Area Z Camberwell Old Cemetery, Placement & Landscaping Works contract for a period of 32 weeks to Blakedown Landscapes Ltd, in accordance with the Landscape Framework for the parks capital programme, be approved.
2. That the allocation of a contingency, which will be held within the capital project budget, be approved.
Lead officer: Rebecca Towers
To consider and determine any objections received to the proposed introduction and/or amendment of parking controls in existing park carparks.
Decision Maker: Deputy Leader and Cabinet Member for Culture, Leisure, Equalities and Communities
Decision published: 24/07/2019
Effective from: 01/08/2019
Decision:
1. That:
· The 388 representations and objections (Appendix A of the report) received in response to the proposed traffic management orders (TMO) be noted.
· Officers be instructed to make the TMO in accordance with the statutory process to implement parking control measure in park car parks that will apply at all times during park opening hours, except in Belair Park which will be deferred until further notice. Maps of areas are shown in Appendix D of the report.
· Officers be instructed that the order should be made with an exception for Emergency ‘A’ permit holders.
· Officers be instructed to write to each person who made representations and to inform them of the council’s decision.
· Officers be instructed to undertake a full review 12 months after implementation as set out in paragraph 34 of the report.
· Officers be instructed to increase cycle parking within the affected parks by 50% within 12 months to encourage travel to parks by bicycle. Dulwich Park will be the first location to receive extra bicycle parking provision, which will be installed before any car parking charges are applied. Southwark currently has 24 sites (112 stands) allocated to cycle parking in parks with car parks.
Wards affected: (All Wards);
Lead officer: Rebecca Towers
Approval of parking restrictions to assist with bus journey times
Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency
Decision published: 19/07/2019
Effective from: 27/07/2019
Decision:
That the implementation of double yellow lines on both sides of the road along Peckham Rye between Harris Boys Academy and Forest Hill Road as shown in the report and Appendix 1, subject to the necessary statutory consultation and procedures, be approved.
Wards affected: Dulwich Hill; Peckham Rye;
Contract award approval
Decision Maker: Strategic Director of Housing
Decision published: 12/07/2019
Effective from: 20/07/2019
Decision:
1. That the award of a works contract for Welsford Street, SE1 to Bonds Builders and Contractors Limited for a contract sum of £2,957,576 for a period of 52 weeks from site possession commencing 19 September 2019 be approved.
2. That the total project costs as detailed in paragraph 59 of the report be noted.
Wards affected: South Bermondsey;
Lead officer: Michael Scorer
To note the Examiner’s report and recommendations on the draft South Bank and Waterloo neighbourhood development plan and to agree the response to each of the Examiner’s recommendations.
To agree proposed modifications to the draft South Bank and Waterloo neighbourhood development plan and to agree the area for referendum.
Decision Maker: Cabinet Member for Growth, Development and Planning
Decision published: 11/07/2019
Effective from: 19/07/2019
Decision:
1. That the Examiner’s report on the draft South Bank and Waterloo neighbourhood development plan and the Examiner’s recommendation and his proposed modifications be noted.
2. That the response to each of the Examiner’s recommendations and the reasons for those recommendations, as set out in Table 1 of Appendix C of the report be agreed.
3. That the proposed modifications to the draft South Bank and Waterloo neighbourhood development plan set out in Tables 1 and 2 of Appendix C of the report be agreed.
4. That it be agreed, subject in each instance set out in this recommendation at (i) to (iv) to the modifications set out in Tables 1 and 2 of Appendix C of the report (including any further amendments to those Tables arising from recommendation (6), the draft South Bank and Waterloo neighbourhood forum plan: (i) meets the basic conditions as provided for in paragraph 8 (2) of Schedule 4B to the Town and Country Planning Act 1990; (ii) complies with the relevant provisions of sections 38A and 28B of the Planning and Compulsory Purchase Act 2004; (iii) is compatible with the European Convention on Human Rights and (iv) should be sent to two referendums (residential and business).
5. That the area for referendum (residential and business) to be the designated South Bank and Waterloo neighbourhood area be agreed.
6. That delegated authority be granted to the director of planning to publish a decision statement in accordable with Regulation 18 of the Neighbourhood Planning (General) Regulations 2012 including taking such steps as are necessary in order to be able to finalise the detailed wording of the modifications set out in Tables 1 and 2 of Appendix C of the report.
7. That delegated authority be granted to the director of planning to carry out all necessary arrangements for and in connection with the holding of two referendums (residential and business), on the making of the draft South Bank and Waterloo neighbourhood development plan including taking such steps as are necessary for the conduct of cross border referendums.
Wards affected: Borough & Bankside; St George's;
Lead officer: Simon Bevan
1. To agree to publish and implement changes to the homelessness policy:
· The Accommodation Procurement Policy for homeless households - Appendix 1.
· The Private Rented Sector Offers Policy for homeless households - Appendix 2.
· The Revised Temporary Accommodation lettings framework - Appendix 3.
2. To note that homeless households in temporary accommodation placed outside of the borough will retain their rights to bid for Southwark’s permanent social housing.
Decision Maker: Cabinet Member for Housing Management and Modernisation
Decision published: 10/07/2019
Effective from: 18/07/2019
Decision:
1. That changes to the homelessness policy be agreed to be implemented and published as set out in the report and with the following amendments to the appendices:
· Appendix 1: Accommodation Procurement Policy for Homeless Households
Insert new 4th bullet point under paragraph 21: “The council’s first priority will be to secure accommodation in Southwark, where it is not possible to secure good quality affordable accommodation in Southwark the council will next look in surrounding boroughs, then in other London boroughs and then in other areas within the M25. The council will also work to secure accommodation for those households who wish to live outside of this area.”
Amend text on Chart 1 on page 5 from “Other areas in line with policy within 90 minutes by bus of London Borough of Southwark” to “Other areas within the M25”
· Appendix 2: Private Rented Sector Offers Policy for Homeless Households
Amend the 3rd bullet point under paragraph 13 from: “PRSOs will be restricted to 90 minutes journey time by bus from either Southwark or the household’s existing location” to “Accommodation will be in or close to Southwark. Unless the household requests a move to a location that is further away, the accommodation offered will be within 90 minutes reasonable journey time by public transport from the address the household was living at before they became homeless and will also be within the M25. Travel times will be measured using the Transport for London online Journey Planner.”
· Appendix 3: Temporary Accommodation Lettings Framework
Inserts new paragraph on page 3: “Unless you request accommodation in a location that is further away, we will offer you accommodation within 90 minutes reasonable journey time by public transport from where you were living before you became homeless, this will also be within the M25 area. Travel times will be measured using the Transport for London online Journey Planner.”
Amend text on diagram on page 3 from “Other areas in line with policy within 90 minutes by bus of London Borough of Southwark” to “Other areas within the M25”
Amend end of 7th bullet point on page 5 from “90 minutes travelling distance of their school or college and we acknowledge this time will be via a journey by bus due to affordability of transport.” to “90 minutes travelling distance by bus of their school or college, alternatively where the journey is possible within 90 minutes by train, tube or tram but not by bus the council will meet the cost difference between the bus fare and the fare using the train, tube or tram.”
Insert a new paragraph after the 5th paragraph on page 6. “If you wish to keep your children in their current school the council will seek to offer you accommodation within 90 minutes journey time by public transport from their school. Where this journey to take the children in your household to and from this existing school is possible within 90 minutes by train, tube or tram but not by bus the council will pay the difference in cost between the bus fare and the fare using the train, tube or tram”
2. That it be noted that homeless households in temporary accommodation placed outside of the borough will retain their rights to bid for Southwark’s permanent social housing.
Wards affected: (All Wards);
Authority to tender for a contractor to deliver new council homes on the Flaxyard and Peckham Library Square sites.
Decision Maker: Cabinet
Decision due date: 16/07/2019
Wards affected: Peckham;
Lead officer: Strategic Director of Housing
Notice of decision: 03/07/2019
To approve the contract variations for supported housing for 16+
Decision Maker: Strategic Director of Children and Adult Services
Decision published: 02/07/2019
Effective from: 01/07/2019
Decision:
That the contract extensions for the Southwark accommodation based service for young people and young people’s floating support service to the providers listed below for a period of up to three months from 1April to 30 June 2019 for an additional cost of £195,044 be approved as detailed in Table 1 below:
Table 1
Provider |
Annual Contract Value 2018-19 |
Contract Value Variation 1st April 2019 – 30th June 2019 |
Look Ahead Care and Support |
407,863 |
101,965 |
The Salvation Army |
273,463 |
68,365 |
Oasis Trust |
98,859 |
24,714 |
Total |
780,185 |
195,044 |
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Permission to dispose of the 11 affordable units secured by the council on shared ownership terms
Decision Maker: Strategic Director of Housing
Decision published: 02/07/2019
Effective from: 10/07/2019
Decision:
That the disposal on shared ownership terms of the 11 affordable units to be acquired by the council at 91 Newington Causeway be agreed.
Wards affected: Chaucer;
Lead officer: Michael Scorer
To agree the proposals for the new resident involvement framework following consultation
Decision Maker: Cabinet
Decision due date: 02/2020
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/07/2019
Write offs of housing benefit overpayment debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 02/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/07/2019
To approve the award of contract
Decision Maker: Acting Strategic Director of Environment, Neighbourhoods and Growth
Decision due date: 11/2019
Wards affected: (All Wards);
Lead officer: Caroline Bruce
Notice of decision: 01/07/2019
To note the council’s deliberations for the 2020-21 general fund revenue budget and agree the next step in the budgeting process.
Decision Maker: Cabinet
Decision due date: 10/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/07/2019
Write off of former tenant arrears debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency
Decision due date: 02/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/07/2019
Write off of NNDR debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 02/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/07/2019
To note the council’s deliberations for the 2020-21 general fund revenue budget and agree the next step in the budgeting process
Decision Maker: Cabinet
Decision due date: 02/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/07/2019
To approve devolved budget decisions to be taken by ward members
Decision Maker: Leader of the Council
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/07/2019
To agree the devolution of decision making authority to ward councillors for the CGS and Devolved Highways budget
Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Caroline Bruce
Notice of decision: 01/07/2019
To approve the award of SRPP Lot A3, 345 Southwark Park Road
Decision Maker: Strategic Director of Place and Wellbeing
Decision published: 01/07/2019
Effective from: 09/07/2019
Decision:
1. That the award of the Southwark Regeneration in Partnership Programme Lot A3, 345 Southwark Park Road, to Lovell Partnerships Ltd for a period of two and half years commencing from November 2019 and completing in January 2022 at a residual land value of £489,961, to deliver 46 new homes (of which 22 will be council homes) and 580m2 of commercial space that will be retained by the council be approved.
2. That the council making a capital contribution of £1,400,000 to Lovell Partnerships 50% at start on site, and the balance 50% at practical completion stage, further details of which are noted at paragraph 14 of the report be approved.
3. That the director of regeneration be authorised to grant on satisfaction of the conditions precedent to the Development Agreement, a 250 year lease at a peppercorn rent.
4. That the director of regeneration be authorised to enter into a “250 year lease less one day” sub lease in the social rent and commercial units to be granted on practical completion of the development, and at a peppercorn rent.
5. That it be noted that the strategic director of place and wellbeing is taking the acquisition decision in the absence of the director of regeneration, and in consultation with the strategic director of housing and modernisation, and the cabinet member for social regeneration, great estates and new homes.
6. That it be noted that the award is based on the developer’s overage payment to the council at 50% of sales above the developer’s projected total sales of the private units at the final bid submission stage of £14,500,000 less any increase in build costs by reference to the BCIS Index.
7. That it be noted that the council will receive a total benefit of £6,045,917 as laid out in paragraph 85 of the report and taking into account a capital contribution by the council of £1.4m, results in a value which is approximately £545,917 greater than if the land was sold on the open market with an estimated value of £5,500,000, further details of which are noted at paragraph 56, Table 4 of the report.
Wards affected: South Bermondsey;
Lead officer: Kevin Fenton
Report seeking approval to award a contract for reablement services
Decision Maker: Strategic Director of Children and Adult Services
Decision published: 01/07/2019
Effective from: 09/07/2019
Decision:
1. That the award of the Reablement Services (interim arrangements) contract to Thames Homecare Limited for a period of 15 months from 1July 2019 to 30 September 2020, for an estimated value of £1.8m be approved.
2. That it be noted that the council has negotiated a reduction in rate which is back dated to the start of the council’s financial year 1 April 2019.
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Authority to award contract to deliver new council homes on the Flaxyard and Peckham Library Square sites
Decision Maker: Strategic Director of Housing
Decision due date: 11/2019
Wards affected: Peckham;
Lead officer: Michael Scorer
Notice of decision: 31/05/2019
Contract awards
Decision Maker: Strategic Director of Housing
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 31/05/2019
Authority to award contract for the Phase 3 environmental works on East Dulwich Estate
Decision Maker: Strategic Director of Housing
Decision due date: 08/2019
Wards affected: Champion Hill;
Lead officer: Bruce Glockling
Notice of decision: 31/05/2019
To approve grants to lead agencies for the delivery of the children’s centres programme for 01/04/2020 – 31/03/2024
Decision Maker: Strategic Director of Finance and Governance
Decision due date: 03/2020
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 31/05/2019
Report that provides the results of the public consultation and seeks approval to move to design and construction
Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency
Decision due date: 06/2020
Wards affected: Rotherhithe; Surrey Docks;
Lead officer: Sally Crew
Notice of decision: 31/05/2019
Write off of former tenant arrears debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 12/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 31/05/2019
Report that provides the results of the public consultation and seeks approval to move to design and construction
Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency
Decision due date: 11/2019
Wards affected: Rotherhithe; Surrey Docks;
Lead officer: Sally Crew
Notice of decision: 31/05/2019
Report that provides the results of the public consultation and seeks approval to move to design and construction
Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency
Decision due date: 11/2019
Wards affected: Rotherhithe;
Lead officer: Sally Crew
Notice of decision: 31/05/2019
To agree the proposals for the new resident involvement framework following consultation
Decision Maker: Cabinet Member for Housing Management and Modernisation
Decision due date: 11/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 31/05/2019
Write off of any NNDR debts over £50,000
Decision Maker: Cabinet
Decision due date: 02/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 31/05/2019
To note the treasury management strategy and agree the capital strategy, investment strategy, capital financial and treasury indicators, and provisions for debt
Decision Maker: Council Assembly
Decision due date: 02/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 31/05/2019
To note the forecast capital outturn position, and to approve amendments to the capital programme
Decision Maker: Cabinet
Decision due date: 03/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 31/05/2019
To note the forecast revenue outturn position, including treasury management
Decision Maker: Cabinet
Decision due date: 03/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 31/05/2019
To set the council tax levels
Decision Maker: Council Assembly
Decision due date: 02/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 31/05/2019
To agree a 2020-21 general fund revenue budget, including fees and charges
Decision Maker: Council Assembly
Decision due date: 02/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 31/05/2019
Note 12 month review of in-house repairs service
Decision Maker: Cabinet
Decision due date: 10/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 31/05/2019
Approval to procure scheme implementation through the EA’s Next Generation Supplier Arrangement (NGSA) subject to securing FDGIA funding
Decision Maker: Acting Strategic Director of Environment, Neighbourhoods and Growth
Decision due date: 02/2021
Wards affected: Peckham Rye;
Lead officer: Caroline Bruce
Notice of decision: 01/05/2019
Authority to tender for a contractor to deliver new council homes on the Flaxyard and Peckham Library Square sites
Decision Maker: Strategic Director of Housing
Decision due date: 08/2019
Wards affected: Peckham;
Lead officer: Michael Scorer
Notice of decision: 01/05/2019
Extension of the current contract
Decision Maker: Cabinet Member for Housing Management and Modernisation
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/05/2019
To note the council’s deliberations for the 2020-21 general fund revenue budget and agree the next step in the budgeting process
Decision Maker: Cabinet
Decision due date: 01/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/05/2019
Contract award approval
Decision Maker: Cabinet
Decision due date: 12/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/05/2019
Report that outlines how we will deliver the vision and principles agreed at April Cabinet
Decision Maker: Cabinet
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Kevin Fenton
Notice of decision: 01/05/2019
Report that outlines how we will deliver the faith strategy agreed in March 2019
Decision Maker: Cabinet
Decision due date: 01/2020
Wards affected: (All Wards);
Lead officer: Kevin Fenton
Notice of decision: 01/05/2019
To approve the HRA budget for 2020-21 and rent setting
Decision Maker: Cabinet
Decision due date: 01/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/05/2019
To set the council tax base and note that the NNDR base will be signed off by the s.151 officer
Decision Maker: Cabinet
Decision due date: 12/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/04/2019
Report seeking approval to procure care at home additional provision (adults)
Decision Maker: Cabinet
Decision due date: 10/2019
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 01/04/2019
Care at Home update
Decision Maker: Cabinet
Decision due date: 10/2019
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 01/04/2019
Dispose of the council’s freehold interest to facilitate the development of a new care home in support of the corporate commitment towards improved provision in the borough.
Decision Maker: Cabinet
Decision due date: 03/2020
Lead officer: Kevin Fenton
Notice of decision: 01/04/2019
Contract award approval
Decision Maker: Strategic Director of Housing
Decision due date: 08/2021
Wards affected: Nunhead & Queen's Road;
Lead officer: Michael Scorer
Notice of decision: 01/04/2019
Write off of housing benefit overpayment debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 12/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/04/2019
Write off of council tax debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 12/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/04/2019
Procurement Strategy Approval
Decision Maker: Strategic Director of Housing
Decision due date: 10/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/04/2019
Contract award approval
Decision Maker: Strategic Director of Housing
Decision due date: 09/2020
Wards affected: St Giles;
Lead officer: Michael Scorer
Notice of decision: 01/04/2019
To note the draft HRA budget and indicative rent increase
Decision Maker: Cabinet
Decision due date: 12/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/04/2019
To note the council’s deliberations for the 2020-21 general fund revenue budget and agree the next step in the budgeting process and the 2020-21 fees and charges.
Decision Maker: Cabinet
Decision due date: 12/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/04/2019
Write off of NNDR debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 12/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/04/2019
To approve the award of contract
Decision Maker: Acting Strategic Director of Environment, Neighbourhoods and Growth
Decision due date: 10/2019
Wards affected: (All Wards);
Lead officer: Mick Lucas
Notice of decision: 01/04/2019
To note treasury management operational activity at mid-year
Decision Maker: Council Assembly
Decision due date: 11/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/03/2019
To write off any NNDR debts over £50,000
Decision Maker: Cabinet
Decision due date: 10/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/03/2019
Report seeking to inform members as to the adequacy of provision of primary and secondary school places
Decision Maker: Cabinet
Decision due date: 10/2019
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 01/03/2019
Report seeking to inform members of School Standards Yearly Report
Decision Maker: Cabinet
Decision due date: 12/2019
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 01/03/2019
Report seeking approval for the procurement of the delivery of supported housing and homelessness services for people with mental health issues
Decision Maker: Cabinet
Decision due date: 06/2021
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 01/03/2019
Authorise the proposed housing allocations scheme to be the subject of a formal 12 week consultation period
Decision Maker: Cabinet
Decision due date: 01/2020
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/02/2019
Report seeking approval for the procurement of the delivery of support and accommodation services for people with learning disabilities
Decision Maker: Cabinet
Decision due date: 03/2020
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 01/02/2019
Write off of council tax debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
Write off of former tenant arrears debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
Write off of housing benefit overpayment debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
Write off of NNDR debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
To note the outcomes and implications of the local government funding position for the council to agree the MTFS
Decision Maker: Cabinet
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
To write off any NNDR debts over £50,000
Decision Maker: Cabinet
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
To note the forecast capital outturn position and to approve amendments to the capital programme
Decision Maker: Cabinet
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
To note the forecast revenue outturn position, including treasury management
Decision Maker: Cabinet
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
Interim youth report on joint strategic needs assessment and framework for public health approach to preventing youth violence
Decision Maker: Cabinet
Decision due date: 10/2019
Wards affected: (All Wards);
Lead officer: Kevin Fenton
Notice of decision: 30/11/2018
Procurement Strategy Approval
Decision Maker: Cabinet
Decision due date: 07/2020
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/10/2018
Contract award approval of the provision of professional technical services to the major works team on the delivery of the housing capital programme
Decision Maker: Cabinet Member for Council Homes and Homelessness
Decision due date: 07/2021
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/06/2018
To seek compulsory purchase powers that may be needed to secure the consented redevelopment of the Elephant and Castle Shopping Centre
Decision Maker: Cabinet
Decision due date: 03/2020
Wards affected: North Walworth; St George's;
Lead officer: Kevin Fenton
Notice of decision: 01/11/2017
To provide the progress report called for by Cabinet on 9 May 2017 and to set out next steps to deliver a new shopping centre.
Decision Maker: Cabinet
Decision due date: 03/2020
Wards affected: North Walworth; St George's;
Lead officer: Kevin Fenton
Notice of decision: 01/11/2017
To approve the award of contract
Decision Maker: Strategic Director of Environment and Social Regeneration
Decision due date: 01/2020
Wards affected: Peckham Rye;
Lead officer: Rebecca Towers
Notice of decision: 01/11/2017
To approve the award of contract
Decision Maker: Cabinet
Decision due date: 06/2020
Wards affected: (All Wards);
Lead officer: Kevin Fenton
Notice of decision: 01/11/2017
Report seeking approval to procure a new supplier of reablement services
Decision Maker: Cabinet
Decision due date: 03/2020
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 03/03/2016