Decisions

This page allows you to search:

NOTE: The "Date range" field refers to the date the decision was first listed on the forward plan, not the date the decision is taken. If you are looking for a decision and cannot find it, please change the earliest decision date to an earlier year and search again.

Please use the Search documents page for meetings held prior to May 2009. For further assistance please contact the constitutional team on 020 7525 7055 or constitutional.team@southwark.gov.uk

Decisions

24/05/2021 - Gateway 2 - Contract Award Approval for main contractor works for Old Kent Road Petrol Station ref: 7343    Recommendations Approved

Authority to award contract to undertake main works for delivery of new council homes on the Old Kent Road petrol station site

Decision Maker: Strategic Director of Housing

Decision published: 25/05/2021

Effective from: 03/06/2021

Decision:

That the award of the main contract works through the Notting Hill Genesis Constructor’s framework for the construction of 24 new homes on the Old Kent Road Petrol Station site (Penry Street) to Glenman Corporation Ltd in the sum of £7,404,829.00, together with a provisional sum allowance of £288,470.00, for a period of 27 Months commencing on 7 June 2021, be approved.

 

Wards affected: South Bermondsey;

Lead officer: Michael Scorer


13/05/2021 - Gateway 3 Contract Variation: Communal Ventilation ref: 7339    Recommendations Approved

To agree a 3 year extension to the contracts

Decision Maker: Strategic Director of Housing

Decision published: 13/05/2021

Effective from: 21/05/2021

Decision:

That the variation of the communal ventilation replacement contract to Ductclean UK Ltd to extend the term of the contract for a period of two years from 1 November 2021 to 31 October 2023 at an estimated additional cost of £770k making a total revised estimated contract value of £2.695m be approved.

Wards affected: (All Wards);

Lead officer: Michael Scorer


31/03/2021 - GW2 Mardyke & Naylor QHIP 20-21 ref: 7331    Recommendations Approved

Contract award approval

Decision Maker: Strategic Director of Housing

Decision published: 31/03/2021

Effective from: 10/04/2021

Decision:

That the award of the Mardyke and Naylor Houses QHIP 2020-2021 call-off contract via a mini-competition from the major works constructor framework to Standage & Co. Ltd for a period of 40 weeks be approved.

Wards affected: North Walworth;

Lead officer: Michael Scorer


04/03/2021 - Gateway 2: Contract award approval for Cator Street 2 Main works - Stage 1 ref: 7313    Recommendations Approved

To approve the award of the stage 1 contract for works in relation to Cator Street (2)

Decision Maker: Strategic Director of Housing

Decision published: 08/03/2021

Effective from: 16/03/2021

Decision:

 

1.   That in consultation with the cabinet member for housing prior approval be formalised of the revised procurement strategy for the enabling works package as set out in paragraph 12 of the report.

 

2.   That in consultation with the cabinet member for housing that the award of the pre-construction services agreement (PCSA), stage one of the design and build contract, for the construction of 50 extra care housing units, additional seven wheelchair units and a multi-purpose community space to Engie Regeneration Limited in the sum of £724,500 for a period of 30 weeks commencing on 16 March 2021 be approved.

 

3.   That in consultation with the cabinet member for housing that the award of the enabling works package, to run concurrently with the PCSA, for the substation relocation to Engie Regeneration Limited for the sum of £370,500 be approved.

 

4.   That in consultation with the cabinet member for housing that the client contingency sums as set out in paragraph 89 of the closed report be noted.

Wards affected: Peckham;

Lead officer: Michael Scorer


06/10/2020 - Gateway 2 Approval of the procurement of contractor services - Nunhead Lane ref: 7165    Recommendations Approved

Contract Award Approval

Decision Maker: Strategic Director of Housing

Decision published: 09/10/2020

Effective from: 17/10/2020

Decision:

 

 

1.  That the award of works contract for Nunhead Lane, appointing Cosmur Construction (London) Limited for a fixed period of 56 weeks be approved.

 

2.  That the total scheme costs includes associated on-costs and a 5% contingency sum be noted.

 

Wards affected: Peckham Rye;

Lead officer: Michael Scorer


06/10/2020 - Gateway 2 - Contract Award Approval Asbestos Removal Works Contracts (Contract A and Contract B) ref: 7164    Recommendations Approved

Contract award approval

Decision Maker: Strategic Director of Housing

Decision published: 08/10/2020

Effective from: 16/10/2020

Decision:

1.  That the award of Contract A - Asbestos Removal Works to Ductclean (UK) Limited (Ductclean) for the estimated sum of £1.1m per annum for a period of 4 years from 15 December 2020 with the option to extend by a further 2-year period in yearly increments, making a total estimated value of £6.6m, be approved.

2.  That the award of Contract B - Asbestos Removal Works to Franklyn Shaw Associates Limited (Franklyn Shaw) for the estimated sum of £1.1m per annum for a period of 4 years from 15 December 2020 with the option to extend by a further 2-year period in yearly increments, making a total estimated value of £6.6m, be approved.

3.  That it be noted that Ductclean and Franklyn Shaw will act as back up contractor to each other on each of their own tendered rates when required.

 

Wards affected: (All Wards);

Lead officer: Michael Scorer


23/06/2020 - GW2: Canada Estate QHIP 17-18 ref: 7122    Recommendations Approved

GW2: Contract award approval – Canada Estate QHIP

Decision Maker: Strategic Director of Housing

Decision published: 23/06/2020

Effective from: 01/07/2020

Decision:

 

That the award of the Canada Estate Phase 2 (2017-18) QHIP Works call-off contract via a mini-competition from the major works constructor framework to Durkan Ltd for a period of 60 weeks be approved.

Wards affected: Rotherhithe;

Lead officer: Michael Scorer


18/05/2020 - GW2 - Approval of the procurement of contractor services Sedgmoor Place ref: 7097    Recommendations Approved

Contract award approval

Decision Maker: Strategic Director of Housing

Decision published: 18/05/2020

Effective from: 27/05/2020

Decision:

1.  That the award of a works contract for 13 new homes at Sedgmoor Place SE5 to Neilcott Construction Limited for a period of 65 weeks including mobilisation be approved.

 

2.  That it be noted the total scheme cost includes associated on-costs and a 5% contingency sum.

Wards affected: St Giles;

Lead officer: Michael Scorer


05/05/2020 - Brenchley Gardens 20MPH consultation report ref: 7085    Recommendations Approved

To approve the recommendations resulting from public consultation

Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency

Decision published: 05/05/2020

Effective from: 14/05/2020

Decision:

That the Brenchley Gardens 20mph scheme be approved for implementation, as shown in the draft outline design (Appendix A of the report), subject to the necessary statutory procedures.

 

Wards affected: Peckham Rye;

Lead officer: Caroline Bruce


24/04/2020 - Sydenham Hill 20mph consultation report    Recommendations Approved

That the Sydenham Hill 20mph scheme be approved for implementation, as shown in the draft outline design (Appendix A), subject to amendments proposed in the consultation summary report and the necessary statutory procedures.

Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency

Decision due date: 04/2020

Wards affected: Dulwich Wood;

Lead officer: Caroline Bruce

Notice of decision: 01/07/2019


08/04/2020 - Gateway 2 - Generalist community legal advice services ref: 7072    Recommendations Approved

Approval of contract award for generalist community legal advice services from 2020-2025.

 

Decision Maker: Deputy Leader and Cabinet Member for Culture, Leisure, Equalities and Communities

Decision published: 08/04/2020

Effective from: 18/04/2020

Decision:

That the contract award for generalist external community legal advice services, to Citizens Advice Southwark (CAS) for an estimated annual sum of £600,000 over a period of up to five years (three years plus option to extend for two years), from 1 May 2020 to 31 March 2025, making a total estimated contract sum of £3m, be approved.

 

Wards affected: (All Wards);

Lead officer: Michael Scorer


03/04/2020 - Gateway 2 - water source heat pumps ref: 7044    Recommendations Approved

To appoint contractor to deliver aquifer heat pump projects at Consort, Newington and Wyndham estates

Decision Maker: Strategic Director of Housing

Decision published: 06/04/2020

Effective from: 16/04/2020

Decision:

That the award of the Consort, Newington and Wyndham District Heating Heat Pump installations call-off contract to Vital Energi Utilities Ltd for a period of 50 weeks be approved.

Wards affected: Camberwell Green; Newington; Rye Lane;

Lead officer: Michael Scorer


01/04/2020 - GW2 - Approval of the procurement of contractor services - Salisbury Estate ref: 7040    Recommendations Approved

Contract award approval

Decision Maker: Strategic Director of Housing

Decision published: 01/04/2020

Effective from: 09/04/2020

Decision:

 

That the award of a works contract for 26 new homes on land at Salisbury Close Estate, SE17 to Glenman Limited for a period of 83 weeks be approved.

Wards affected: North Walworth;

Lead officer: Michael Scorer


26/03/2020 - Gateway 2 approval for Main Works on the Rotherhithe Primary School expansion scheme ref: 7037    Recommendations Approved

To approve the contract award for the main works on Rotherhithe Primary School

Decision Maker: Strategic Director of Children and Adult Services

Decision published: 26/03/2020

Effective from: 03/04/2020

Decision:

That the award for the main works contract of the expansion scheme of Rotherhithe Primary School to Farrans Construction Limited, for a contract sum of £15,464,816 for a period of approximately 90 weeks commencing on 24 April 2020 be approved.

 

Wards affected: Rotherhithe;

Lead officer: David Quirke-Thornton


27/02/2020 - Consultation on Proposals for the Private Rented Sector 2020 - 2026

To seek approval for a public consultation on proposals for discretionary licensing and the Landlord’s Gold Standard Charter

Decision Maker: Cabinet

Decision due date: 03/2020

Wards affected: (All Wards);

Lead officer: Caroline Bruce

Notice of decision: 02/12/2019


24/02/2020 - Council tax write-offs over £5,000 and under £50,000 ref: 7029    Recommendations Approved

To approve a write-off of £190,458.64 of debt (multiple write-offs).

Decision Maker: Cabinet Member for Finance, Performance and Brexit

Decision published: 25/02/2020

Effective from: 04/03/2020

Decision:

That the write offs of £190,458.64 of debt detailed in Appendix 1 of the report (multiple write-offs) be approved.

 

Wards affected: (All Wards);

Lead officer: Duncan Whitfield


24/02/2020 - Admission arrangements for community primary schools - September 2021 ref: 7028    Recommendations Approved

To agree the admission arrangements for community primary schools for September 2021

Decision Maker: Cabinet Member for Children, Schools and Adult Care

Decision published: 24/02/2020

Effective from: 03/03/2020

Decision:

That the Southwark Community Primary Schools Admission Arrangements (“the Arrangements”) for September 2021 as set out in Appendix 1 of the report be agreed.

 

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton


24/02/2020 - Southwark coordinated admission schemes for primary, junior and secondary admissions 2021 ref: 7027    Recommendations Approved

To agree the Southwark coordinated admission schemes for primary, junior and secondary admissions for September 2021

Decision Maker: Cabinet Member for Children, Schools and Adult Care

Decision published: 24/02/2020

Effective from: 03/03/2020

Decision:

1.  That it be noted that the Primary (Reception), Junior and Secondary (Year 7) coordinated admission schemes have worked effectively for Southwark residents during the last academic year, which have not changed for the 2021-22 admissions year.

 

2.  That the Primary (Reception), Junior and Secondary (Year 7) coordinated admission schemes for 2021-22 admissions, attached as Appendix 1, Appendix 2 and Appendix 3 of the report, be agreed.

 

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton


04/02/2020 - Gateway 2 - Major works constructor framework (Lot 1) Rodney Estate QHIP 2019-20 ref: 7017    Recommendations Approved

Contract award approval

Decision Maker: Strategic Director of Housing

Decision published: 04/02/2020

Effective from: 12/02/2020

Decision:

That the award of the Rodney Estate QHIP 2019-20 call-off contract via a mini-competition from the major works constructor framework to Standage & Co Ltd for a period of 36 weeks be approved.

Wards affected: Faraday;

Lead officer: Michael Scorer


03/02/2020 - London Councils pan London grants programme 2020-21 Southwark levy ref: 7016    Recommendations Approved

To approve the Southwark contribution to the London Councils grant programme for 2020-21

Decision Maker: Cabinet Member for Community Safety and Public Health

Decision published: 03/02/2020

Effective from: 11/02/2020

Decision:

That Southwark Council’s contribution to the London Councils Grants Scheme of £237,484  for 2020-21, subject to approval of the council budget by council assembly in February 2020 be approved.

 

Wards affected: (All Wards);

Lead officer: Kevin Fenton


29/01/2020 - Culture Grants 01 April 2020 to 31 March 2021 ref: 7015    Recommendations Approved

To approve the extension of the culture grants programme for one year to 2020-21.

Decision Maker: Deputy Leader and Cabinet Member for Culture, Leisure, Equalities and Communities

Decision published: 29/01/2020

Effective from: 06/02/2020

Decision:

That the extension of grant funding of £152,000 to currently commissioned funded arts and cultural organisations for a period of twelve months from 01 April 2020 to 31 March 2021 be approved.

 

Wards affected: (All Wards);

Lead officer: Caroline Bruce


23/12/2019 - Determination of Objections - East Dulwich controlled parking zone ref: 6984    Recommendations Approved

To determine objections to the statutory consultation

Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency

Decision published: 23/12/2019

Effective from: 09/01/2020

Decision:

  i.  That each of the grounds for objections and comments included in the correspondence be determined, in line with the reasoning in Appendix 1 of the report.

 

  ii.  That objections relating to certain design features be upheld and design changes made as detailed in Appendix 3 of the report, and that otherwise the position and type of parking bays and restrictions be approved as shown in the detailed design (Appendix 2 of the report).

 

  iii.  That officers be instructed to write to each person who made representations to inform them of the council’s decision.

 

  iv.  That officers be instructed to make the necessary Traffic Management Order.

 

  v.  That officers be instructed to proceed with installation of the parking zone in the East Dulwich area operating from Monday to Friday between 8.30am and 6.30pm as per the in principle approval of 7 August 2019, with estimated cost of £100,000 comprising of £75,000 for implementation works and £25,000 staff costs.

 

  vi.  That the decisions relating to further minor amendments to detailed engineering design be delegated to officers.

 

 vii.  That the objections to ‘stop and rest’ spaces in the carriageway be rejected and placeholders retained by way of double yellow lines provided and that the community be engaged on the potential use of the spaces after the zone is implemented.

 

viii.  That officers be instructed to review the parking zone in six to nine months after implementation and to advise on whether operation days and times should be retained or amended in consideration of the consultation results.

Wards affected: Goose Green;

Lead officer: Caroline Bruce


23/12/2019 - Determination of Objections - Peckham West controlled parking zone ref: 6985    Recommendations Approved

To determine objections to the statutory consultation

Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency

Decision published: 23/12/2019

Effective from: 09/01/2020

Decision:

  i.  That each of the grounds for objections and comments included in the correspondence be determined, in line with the reasoning in Appendix 1 of the report.

 

  ii.  That objections relating to certain design features be upheld and design changes made as detailed in Appendix 3 of the report and that otherwise the position and type of parking bays and restrictions be approved as shown in the detailed design (Appendix 2 of the report).

 

  iii.  That officers be instructed to write to each person who made representations to inform them of the council’s decision.

 

  iv.  That officers be instructed to make the necessary Traffic Management Order.

 

  v.  That officers be instructed to proceed with installation of the parking zone in the Peckham West area operating from Monday to Friday between 9am and 11am as per the in-principle approval of 7 August 2019, with estimated cost of £110,000 comprising of £80,000 for implementation works and £30,000 staff costs.

 

  vi.  That the decisions relating to further minor amendments to detailed engineering design be delegated to officers.

 

  vii.  That the objections to ‘stop and rest’ spaces in the carriageway be rejected and placeholders retained by way of double yellow lines provided and that the community be engaged on the potential use of the spaces after the zone is implemented.

 

  viii.  That officers be instructed to review the parking zone in six to nine months after implementation and to advise on whether operation days and times should be retained or amended in consideration of the consultation results.

Wards affected: Goose Green; Rye Lane;

Lead officer: Caroline Bruce


17/12/2019 - GW3 - Extension to the lift maintenance contract A&B ref: 6980    Recommendations Approved

To agree a 2 year extension to the contract

Decision Maker: Cabinet Member for Housing Management and Modernisation

Decision published: 18/12/2019

Effective from: 04/01/2020

Decision:

1.  That the variation of Contract A (north of the borough) Lift Maintenance Contract to Liftec Lifts Ltd (Liftec) to extend the term of the contract for a period of 2 years from 2 January 2020 at an estimated cost of £3.51m be approved.

2.  That the variation of Contract B (south of the borough) Lift Maintenance Contract to Guideline Lift Services Ltd (Guideline) to extend the term of the contract for a period of 2 years from 2 January 2020 at an estimated sum of £2.72m be approved.

3.  That the shortening of the notice period provision to be given to Liftec and Guideline from 6 months to 2 months for this variation be noted.

Wards affected: (All Wards);

Lead officer: Michael Scorer


17/12/2019 - Introduction of parking Scheme on Nunhead Estate ref: 6979    Recommendations Approved

To approve the local traffic and parking amendments, for implementation subject to the outcome of any necessary statutory procedures.

Decision Maker: Cabinet Member for Housing Management and Modernisation

Decision published: 18/12/2019

Effective from: 04/01/2020

Decision:

That the following local traffic and parking amendments be approved for implementation subject to the outcome of any necessary statutory procedures:

 

·  To implement estate parking scheme on Nunhead Estate.

·  Blocks on Nunhead Estate to be included in the estate parking scheme are Creed House, Goodwin House, Tiling House, Glover House and Lancefield House.

·  This shall consist of two separate parking schemes. One scheme will be for Creed, Goodwin and Tiling House and the other one will be for Glover and Lancefield House. Nunhead Lane shall be the boundary line for each estate parking scheme area. This will also provide additional protection for the residents on the estate for forthcoming control parking zones to be introduced shortly on highways across the borough.

·  Upon approval, the next process will be to draft a Traffic Management Order, prepare the relevant TMO schedule, drawings and design to aid implementation of scheme, advertise the Traffic Management Order in line with statutory consultation procedure and carry out the estate markings and signs. 

·  It is anticipated that the scheme will go live around February 2020.

Wards affected: Rye Lane;

Lead officer: Paul Langford


18/12/2019 - Pre-allocation of all new build accommodation policy ref: 6981    Recommendations Approved

To approve the inclusion of the proposed pre-allocation lettings process for new build affordable homes in the council’s allocation scheme, and for the proposed process to take effect from 1 January 2020.

Decision Maker: Cabinet Member for Housing Management and Modernisation

Decision published: 18/12/2019

Effective from: 04/01/2020

Decision:

1.  That the inclusion in the council’s allocation scheme of the proposed pre-allocation lettings process for new build affordable homes as set out in the report be approved.

 

2.  That the proposed process take effect from 1 January 2020.

 

3.  That a report is provided to the Cabinet Member for Housing Management and Modernisation and Cabinet Member for Social Regeneration, Great Estates & New Homes within twelve months providing an evaluation of the policy and recommendations on how it could be further improved.

Wards affected: (All Wards);

Lead officer: Richard Selley


05/12/2019 - Authorisation of debt write-offs of £5,000 up to £50,000 for Adult Social Care Division ref: 6977    For Determination

To authorise the write-off of £31,104.71 of debt as set out in the report.

 

Decision Maker: Cabinet Member for Children, Schools and Adult Care

Decision published: 05/12/2019

Effective from: 13/12/2019

Decision:

 

1.  That the write-off of £31,104.71 of debt as set out in Appendix 1 of the report be authorised.

 

2.  That the cabinet member for children, schools and adult care advise on any further action they require on any write-offs not agreed within the report.

Lead officer: Jay Stickland


03/12/2019 - Minor Traffic Schemes (2019/20 Batch 3) ref: 6976    Recommendations Approved

To approve minor traffic schemes:

 

Farmers Road, Great Suffolk Street, Hansler Road, Munton Road, Parkers Row, Pioneer Street, Woods Road, Maltby Street, Colnbrook Street, King Stairs Close, Athenlay Road , Woods Road , Cherry Garden School ( Ophir Terrace ), De Laune Street, Webber Row, Downtown Road, Townley Road, Windsor Walk, Alleyn Park, Dovercourt Road, Worlingham Road, Hills’boro Road, Greendale , Dulwich Village, Stevenson Crescent, Churchyard Row, Half Moon Lane

Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency

Decision published: 03/12/2019

Effective from: 11/12/2019

Decision:

That the non-strategic traffic and highway improvements, detailed in the appendices to the report and summarised in Table 1 of the report, be approved for implementation subject to the outcome of any necessary statutory consultation and procedures.

 

Wards affected: (All Wards);

Lead officer: Dale Foden


02/12/2019 - GW2 - Children's Residential Care and Independent Fostering Agencies (IFAs)

Approval for Joining a Framework

Decision Maker: Strategic Director of Children and Adult Services

Decision due date: 03/2020

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 02/12/2019


02/12/2019 - Greenhive and Rose Court Lift Replacement (Anchor Lifecycle Programme)

To approve the award of the contract to replace the existing lifts at Rose Court and Greenhive Residential Care Homes for the Elderly and install a second passenger lift at Greenhive

Decision Maker: Director of Adult Social Care

Decision due date: 03/2020

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 02/12/2019


02/12/2019 - Gateway 1 approval to the procurement strategy for the main contractor for phase 2 of The Charter School East Dulwich project

Approval to the procurement strategy to select the main contractor for phase 2 of The Charter School East Dulwich project. Phase 2 will deliver the main school entrance, administration areas, sixth form centre, music facilities, lecture hall, SEN resource, multi-use games areas and general landscaping.

Decision Maker: Strategic Director of Children and Adult Services

Decision due date: 01/2020

Wards affected: Goose Green;

Lead officer: David Quirke-Thornton

Notice of decision: 02/12/2019


02/12/2019 - Gateway 1 approval to the procurement strategy for a demolition contractor for phase 2 of The Charter School East Dulwich project

Approval to the procurement strategy to select a demolition contractor for phase 2 of The Charter School East Dulwich project to clear the site ready for construction works. Phase 2 will deliver the main school entrance, administration areas, sixth form centre, music facilities, lecture hall, SEN resource, multi-use games areas and general landscaping.

Decision Maker: Strategic Director of Children and Adult Services

Decision due date: 01/2020

Wards affected: Goose Green;

Lead officer: David Quirke-Thornton

Notice of decision: 02/12/2019


02/12/2019 - Gateway 2 - Contract Award Approval Rose Court Replacement of Distribution Pipework

To approve the award of the contract to replace the heating and domestic hot and cold water distribution pipework at Rose Court Residential Care Home for the Elderly

Decision Maker: Strategic Director of Children and Adult Services

Decision due date: 01/2020

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 02/12/2019


02/12/2019 - Gateway 3 - Contract Variation

To agree a 1 year extension to the contracts

Decision Maker: Strategic Director of Housing

Decision due date: 01/2020

Wards affected: (All Wards);

Notice of decision: 02/12/2019


02/12/2019 - Gateway 3 - Contract Variation Responsive Repair and Maintenance - Communal Repairs Chargeable Contracts (North & South)

To agree a 1 year extension to the contracts

Decision Maker: Strategic Director of Housing

Decision due date: 03/2020

Wards affected: (All Wards);

Notice of decision: 02/12/2019


02/12/2019 - Gateway 3 - Contract Variation: Responsive Repair and Maintenance - Roofing and Rainwater Chargeable Contracts (North & South)

To agree a 1 year extension to the contracts

Decision Maker: Strategic Director of Housing

Decision due date: 03/2020

Wards affected: (All Wards);

Notice of decision: 02/12/2019


02/12/2019 - Gateway 3 - Contract Variation: Engineering Inspection Contract

To agree a 2 year extension to the contracts

Decision Maker: Strategic Director of Housing

Decision due date: 01/2020

Wards affected: (All Wards);

Notice of decision: 02/12/2019


02/12/2019 - Gateway 3 - Variation Decision Asbestos Consultancy Services Contract A & B

To agree a 2 year extension to the contracts

Decision Maker: Strategic Director of Housing

Decision due date: 08/2020

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 02/12/2019


02/12/2019 - Gateway 2 - Contract Award Approval for Main Works for Flaxyard and Peckham Library Square

Authority to award contract to deliver new council homes on the Flaxyard and Peckham Library Square sites

Decision Maker: Strategic Director of Housing

Decision due date: 11/2020

Wards affected: Peckham;

Lead officer: Michael Scorer

Notice of decision: 02/12/2019


02/12/2019 - Gateway 3 Quality Auditing of Mechanical Services

To agree a 3 year extension to the contracts

Decision Maker: Strategic Director of Housing

Decision due date: 03/2020

Wards affected: (All Wards);

Notice of decision: 02/12/2019


02/12/2019 - Lordship Lane Safety Improvements

To approve recommendations resulting from public consultation

Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency

Decision due date: 06/2020

Wards affected: Goose Green;

Lead officer: Caroline Bruce

Notice of decision: 02/12/2019


02/12/2019 - Gateway 3 - Contract Variation Heating and Water Contracts A&B

To agree a 3 year extension to the contracts

Decision Maker: Cabinet

Decision due date: 10/2020

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 02/12/2019


02/12/2019 - Disposal of 18 St Mary's Road

To dispose of 18 St Mary’s Road by public auction

Decision Maker: Cabinet

Decision due date: 02/2020

Wards affected: Nunhead & Queen's Road;

Lead officer: Kevin Fenton

Notice of decision: 02/12/2019


02/12/2019 - To agree a Community Harm and Serious Violence Action Plan

Action Plan Approval

Decision Maker: Cabinet

Decision due date: 03/2020

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 02/12/2019


02/12/2019 - Gateway 1 - Lifts Maintenance, Refurbishment and replacements    Recommendations Approved

Procurement Strategy Approval

Decision Maker: Cabinet

Decision due date: 07/2020

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 02/12/2019


02/12/2019 - Creation of 5 Area Committees (Multi-Ward Forums)

To approve the creation of five area committees to make devolved budget decisions

Decision Maker: Council Assembly

Decision due date: 01/2020

Wards affected: (All Wards);

Lead officer: Stephen Douglass

Notice of decision: 02/12/2019


02/12/2019 - Gateway 2 - Contract Award Approval for Main Works for Flaxyard and Peckham Library Square

Authority to award contract to deliver new council homes on the Flaxyard and Peckham Library Square sites

Decision Maker: Strategic Director of Housing

Decision due date: 03/2020

Wards affected: Peckham;

Lead officer: Michael Scorer

Notice of decision: 02/12/2019


02/12/2019 - Treasury Management - mid year update 2019-20

To note treasury management  operational activity at mid year

Decision Maker: Council Assembly

Decision due date: 01/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 02/12/2019


02/12/2019 - Positive Futures Fund Grant Programme - Phase Two

Phase Two funding award in relation to applications received for Positive Futures Fund

Decision Maker: Cabinet Member for Community Safety and Public Health

Decision due date: Not before 10/12/2019

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 01/10/2019


02/12/2019 - Gateway 2 approval to the appointment of a design team for phase 2 of The Charter School East Dulwich project ref: 6974    Recommendations Approved

Contract award for the appointment of a design team for The Charter School East Dulwich project phase 2 which includes main school entrance, admin areas, lecture hall, SEN resource, multi-use games and general landscaping.

Decision Maker: Strategic Director of Children and Adult Services

Decision published: 02/12/2019

Effective from: 10/12/2019

Decision:

That the award of the architect-led design team contract for phase 2 of The Charter School East Dulwich project to Feilden Clegg Bradley Studios (FCBS) for RIBA stages 2 - 4 for the sum of £651,083.40 for a period of 9 months commencing in December 2019 be approved.

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton


02/12/2019 - GW2 Borough Wide Cold Water Storage Tank Replacement Programme QHIP 17-20 ref: 6975    Recommendations Approved

Contract Award Approval

Decision Maker: Strategic Director of Housing

Decision published: 02/12/2019

Effective from: 10/12/2019

Decision:

That the award of the Borough wide Cold Water Storage Tank Replacement Programme QHIP 2016 – 20 via a mini competition from the major works constructor framework to MPS Housing Ltd be approved.

Wards affected: Rotherhithe;

Lead officer: Michael Scorer


21/11/2019 - Gateway 3 - Variation Decision Approval, Queens Road 4    Recommendations Approved (subject to call-in)

To approve a variation to commission for the design services scope and fees for Queens Road 4.

Decision Maker: Strategic Director of Finance and Governance

Decision due date: 11/2019

Wards affected: Nunhead & Queen's Road;

Lead officer: Michael Scorer

Notice of decision: 30/08/2019


20/11/2019 - Rotherhithe and Surrey Docks CPZ ref: 6973    Recommendations Approved

To approve the implementation of a CPZ with the Rotherhithe and Surrey Docks wards

Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency

Decision published: 20/11/2019

Effective from: 28/11/2019

Decision:

1.  That the implementation of a new parking zone in the Rotherhithe and Surrey Docks area, operating Monday to Friday, 8.30am to 6.30pm and  subject to the outcome of any necessary statutory procedures be approved.

 

2.  That a further report be brought forward should there be any statutory objections to the traffic order required to implement the new parking zone.

 

3.  That the position and type of parking bays and restrictions for the new parking zone and surrounding streets as shown in the outline design save for any amendments which may be required at the implementation stage be approved and would be determined by officers (Appendix B).

 

Wards affected: Rotherhithe; Surrey Docks;

Lead officer: Caroline Bruce


01/11/2019 - Acquisition of unregistered land on Old Kent Road using Compulsory Purchase powers

To approve the acquisition of small parcels of unregistered land off Old Kent Road using CPO powers to enable development

Decision Maker: Cabinet

Decision due date: 12/2020

Wards affected: London Bridge & West Bermondsey;

Lead officer: Eleanor Kelly

Notice of decision: 01/11/2019


01/11/2019 - GW2 - Local Community Offer (VCS Hubs)    Recommendations Approved

Contract Award Recommendation – Local Community Offer

Decision Maker: Cabinet

Decision due date: 02/2020

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 01/11/2019


01/11/2019 - Policy and Resources Strategy: financial remit 2021-22 and scene setting    Recommendations Approved

To note the financial remit for 2021-22

Decision Maker: Cabinet

Decision due date: 07/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/11/2019


01/11/2019 - Treasury Management Performance - 2019-20 annual report and prudential indicators

To note the treasury management performance and outturn for prudential indicators on capital finance, debt and investments 2019-20

Decision Maker: Council Assembly

Decision due date: 07/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/11/2019


01/11/2019 - Borough Road Healthy Streets (St Georges Circus to Falmouth Road cycleway plus Harper Road Street improvement)

To approve the implementation

Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency

Decision due date: 03/2020

Wards affected: St George's;

Lead officer: Caroline Bruce

Notice of decision: 01/11/2019


01/11/2019 - Selective and Additional Property Licensing Proposals 2021 - 2026

To seek approval for a public consultation on Selective and Additional Property licensing proposals for 2021 - 2026

Decision Maker: Cabinet Member for Finance, Performance and Brexit

Decision due date: 01/2020

Wards affected: (All Wards);

Lead officer: Caroline Bruce

Notice of decision: 01/11/2019


01/11/2019 - Dog Kennel Hill Cycling Improvements

To approve the implementation subject to statutory consultation

Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency

Decision due date: 07/2020

Wards affected: Champion Hill;

Lead officer: Caroline Bruce

Notice of decision: 01/11/2019


01/11/2019 - Neighbourhoods Fund (NSF) 2020-21

Approval of awards to successful projects for NsF 2020-21 round

Decision Maker: North East multi-ward forum

Decision due date: 03/2020

Wards affected: North Bermondsey; Rotherhithe; South Bermondsey; Surrey Docks;

Lead officer: Michael Scorer

Notice of decision: 01/11/2019


01/11/2019 - GW2 Nelson Square Gardens Phase 2 QHIP 20-21

Contract award approval

Decision Maker: Strategic Director of Housing

Decision due date: 07/2021

Wards affected: Borough & Bankside;

Lead officer: Michael Scorer

Notice of decision: 01/11/2019


01/11/2019 - GW2 Redman House QHIP 20-21

Contract award approval

Decision Maker: Strategic Director of Housing

Decision due date: 09/2020

Wards affected: Borough & Bankside;

Lead officer: Michael Scorer

Notice of decision: 01/11/2019


01/11/2019 - Neighbourhoods Fund (NsF) 2020-21

Approval of awards to successful projects for NsF 2020-21 round

Decision Maker: North West multi-ward forum

Decision due date: 03/2020

Wards affected: Borough & Bankside; Chaucer; London Bridge & West Bermondsey; St George's;

Lead officer: Michael Scorer

Notice of decision: 01/11/2019


01/11/2019 - Neighbourhoods Fund (NsF) 2020-21

Approval of awards to successful projects for NsF 2020-21 round

Decision Maker: East Central multi-ward forum

Decision due date: 03/2020

Wards affected: Nunhead & Queen's Road; Old Kent Road; Peckham; Peckham Rye; Rye Lane;

Lead officer: Councillor Rebecca Lury

Notice of decision: 01/11/2019


01/11/2019 - Neighbourhoods Fund (NsF) 2020-21

Approval of awards to successful projects for NsF 2020-21 round

Decision Maker: West Central multi-ward forum

Decision due date: 03/2020

Wards affected: Camberwell Green; Faraday; Newington; North Walworth; St Giles;

Lead officer: Michael Scorer

Notice of decision: 01/11/2019


01/11/2019 - Neighbourhoods Fund (NsF) 2020-21

Approval of awards to successful projects for NsF 2020-21 round

Decision Maker: South multi-ward forum

Decision due date: 02/2020

Wards affected: Champion Hill; Dulwich Hill; Dulwich Village; Dulwich Wood; Goose Green;

Lead officer: Michael Scorer

Notice of decision: 01/11/2019


01/11/2019 - GW2 Rockingham & County Street QHIP 20-21

Contract award approval

Decision Maker: Strategic Director of Housing

Decision due date: 02/2021

Wards affected: Chaucer;

Lead officer: Michael Scorer

Notice of decision: 01/11/2019


01/10/2019 - Gateway 0 - SEND out of borough, independent and non maintained school placements (under 19 year olds)

Approval of a procurement strategy to join a framework

Decision Maker: Cabinet Member for Children, Schools and Adult Care

Decision due date: 02/2020

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 01/10/2019


01/10/2019 - Gateway 1 Contractor Services for the new homes developments

Procurement strategy approval

Decision Maker: Cabinet

Decision due date: 02/2020

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 01/10/2019


01/10/2019 - Gateway 1 MMC Contractor Services for the New Homes Roof Top Developments, other modular opportunities and associated works

Procurement strategy approval

Decision Maker: Cabinet

Decision due date: 03/2020

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 01/10/2019


01/10/2019 - Gateway 1 - Children's residential care and independent fostering agencies (IFA)    Recommendations Approved

Approval of a procurement strategy to join a framework

Decision Maker: Cabinet

Decision due date: 02/2020

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 01/10/2019


01/10/2019 - New key worker housing powers (Churchyard Row)

To agree to let the intermediate market rent flats on Churchyard Row (36 units) under the principles of the intermediate rent housing list

Decision Maker: Cabinet

Decision due date: 03/2020

Wards affected: St George's;

Lead officer: Michael Scorer

Notice of decision: 01/10/2019


01/10/2019 - Active Southwark Action Plan

To approve the action plan for the sports and physical activity strategy (2019-2023)

Decision Maker: Cabinet

Decision due date: 01/2020

Wards affected: (All Wards);

Lead officer: Caroline Bruce

Notice of decision: 01/10/2019


01/10/2019 - Gateway 2 - Award of Southwark Highways Works Contract    Recommendations Approved

To approve the award of the Southwark Highways Works Contract

Decision Maker: Cabinet

Decision due date: 01/2020

Wards affected: (All Wards);

Lead officer: Caroline Bruce

Notice of decision: 01/10/2019


01/10/2019 - Policy and Resources Strategy capital monitoring report outturn 2019-20    Recommendations Approved

To note the capital outturn position for 2019-20

Decision Maker: Cabinet

Decision due date: 06/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/10/2019


01/10/2019 - Gateway 2 Approval of the procurement for (Architect) for the New Homes Development Programme

Contract Award Approval

Decision Maker: Strategic Director of Housing

Decision due date: 03/2020

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 01/10/2019


01/10/2019 - GW2 Wyndham Estate Phase 1 Heating Mains Replacement QHIP 18-19

Contract Award Approval

Decision Maker: Strategic Director of Housing

Decision due date: 01/2020

Wards affected: Camberwell Green;

Lead officer: Michael Scorer

Notice of decision: 01/10/2019


01/10/2019 - Former tenant arrears write offs over £5,000 and under £50,000

Write off of former tenant arrears debts over £5,000 but under £50,000

Decision Maker: Cabinet Member for Finance, Performance and Brexit

Decision due date: 06/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/10/2019


01/10/2019 - Housing benefit overpayment write offs over £5,000 and under £50,000

Write off of housing benefit overpayment debts over £5,000 but under £50,000

Decision Maker: Cabinet Member for Finance, Performance and Brexit

Decision due date: 06/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/10/2019


01/10/2019 - National non-domestic rates write offs over £5,000 and under £50,000

Write off of NNDR debts over £5,000 but under £50,000

Decision Maker: Cabinet Member for Finance, Performance and Brexit

Decision due date: 06/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/10/2019


01/10/2019 - Policy and Resources Strategy: revenue monitoring outturn, including treasury management 2019-20    Recommendations Approved

To note the forecast revenue outturn position for 2019-20, including treasury management

Decision Maker: Cabinet

Decision due date: 06/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/10/2019


01/10/2019 - Council tax write offs over £5,000 and under £50,000

Write off of council tax debts over £5,000 but under £50,000

Decision Maker: Cabinet Member for Finance, Performance and Brexit

Decision due date: 06/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/10/2019


09/06/2020 - GW2 Cossall Estate Boiler Replacement & Systems Improvement QHIP 17-18 ref: 7108    Recommendations Approved

Contract Award Approval

Decision Maker: Strategic Director of Housing

Decision published: 27/09/2019

Effective from: 18/06/2020

Decision:

That the award of the Cossall Estate Boiler Renewal Programme QHIP 2017-18 call-off contract via a mini-competition from the major works constructor framework to BSW Heating Ltd for a period of 12 weeks be approved.

 

Wards affected: Nunhead & Queen's Road;

Lead officer: Michael Scorer


30/08/2019 - Gateway 1 - Generalist community legal advice services

Approval of procurement strategy for Generalist community legal advice services from 2020-2025

Decision Maker: Strategic Director of Finance and Governance

Decision due date: 01/2020

Wards affected: (All Wards);

Lead officer: Kevin Fenton

Notice of decision: 30/08/2019


30/08/2019 - Adult Social Care Fairer Contributions Policy

Approve recommendations to revise the ASC Fairer Contributions Policy

Decision Maker: Cabinet

Decision due date: 03/2020

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 30/08/2019


30/08/2019 - Delegation of executive functions for the Devolved Highways Budget from community councils to appropriate decision maker

To agree the devolution of decision making authority for the Devolved Highway budget

Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency

Decision due date: 01/2020

Wards affected: (All Wards);

Lead officer: Caroline Bruce

Notice of decision: 30/08/2019


01/08/2019 - Public Space Protection Order Review - to tackle dog related anti-social behaviour    Recommendations Approved

To approve the recommendations resulting from a review of the introduction of the dog related Public Space Protection Order

Decision Maker: Cabinet

Decision due date: 01/2020

Wards affected: (All Wards);

Lead officer: Caroline Bruce

Notice of decision: 01/08/2019


01/08/2019 - Delegation of executive functions for the Cleaner Greener Safer Programme and Neighbourhoods Fund from community councils to ward forums

To agree the devolution of decision making authority to ward councillors for the CGS budget

Decision Maker: Leader of the Council

Decision due date: 01/2020

Wards affected: (All Wards);

Lead officer: Caroline Bruce

Notice of decision: 01/08/2019


01/08/2019 - Spa Road Highway Improvements

To approve the implementation of highway improvements on Spa Road subject to statutory consultation

Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency

Decision due date: 03/2020

Wards affected: London Bridge & West Bermondsey; South Bermondsey;

Lead officer: Caroline Bruce

Notice of decision: 01/08/2019


01/08/2019 - Gateway 1 - Variation Decision - Engineering Inspection Contract

Procurement Strategy Approval

Decision Maker: Strategic Director of Finance and Governance

Decision due date: 02/2020

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 01/08/2019


01/08/2019 - Connected Southwark (2021-23)

Approval of the strategy

Decision Maker: Cabinet

Decision due date: 01/2021

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 01/08/2019


01/08/2019 - Canada Water Investment option

To create a budget so that, should the council so wish, it will be able to invest in the Canada Water masterplan scheme

Decision Maker: Cabinet

Decision due date: 03/2020

Wards affected: Rotherhithe; Surrey Docks;

Lead officer: Kevin Fenton

Notice of decision: 01/08/2019


01/08/2019 - Gateway 1 Alternative Provision Procurement Strategy

Procurement strategy for alternative provision in Southwark

Decision Maker: Cabinet

Decision due date: 03/2020

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 01/08/2019


01/08/2019 - Corporate Asset Management Plan

Refreshed strategy for the council’s property assets, aligned to delivering corporate priorities and services

Decision Maker: Cabinet

Decision due date: 03/2020

Wards affected: (All Wards);

Lead officer: Kevin Fenton

Notice of decision: 01/08/2019


01/08/2019 - GW2 Wyndham Estate Phase 1 QHIP 18-19

Contract Award Approval

Decision Maker: Strategic Director of Housing

Decision due date: 01/2020

Wards affected: Camberwell Green;

Lead officer: Michael Scorer

Notice of decision: 01/08/2019


01/08/2019 - Gateway 2: Parking and traffic enforcement and associated services    Recommendations Approved

Approval to procure a new parking and traffic enforcement contract to start April 2020

Decision Maker: Cabinet

Decision due date: 01/2020

Wards affected: (All Wards);

Lead officer: Caroline Bruce

Notice of decision: 01/08/2019


01/08/2019 - Gateway 2 - Contract award approval - South Dock Marina: Lock Gates and Structural Works

To approve the award of the contract

Decision Maker: Acting Strategic Director of Environment, Neighbourhoods and Growth

Decision due date: 01/2020

Wards affected: Surrey Docks;

Lead officer: Caroline Bruce

Notice of decision: 01/08/2019


01/07/2019 - Housing benefit overpayment write offs over £5,000 and under £50,000

Write offs of housing benefit overpayment debts over £5,000 but under £50,000

Decision Maker: Cabinet Member for Finance, Performance and Brexit

Decision due date: 02/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/07/2019


01/07/2019 - National non-domestic rates write offs over £5,000 and under £50,000

Write off of NNDR debts over £5,000 but under £50,000

Decision Maker: Cabinet Member for Finance, Performance and Brexit

Decision due date: 02/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/07/2019


01/07/2019 - Former tenant arrears write offs over £5,000 and under £50,000

Write off of former tenant arrears debts over £5,000 but under £50,000

Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency

Decision due date: 02/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/07/2019


01/07/2019 - Policy and Resources Strategy 2020-21 to 2022-23 update    Recommendations Approved

To note the council’s deliberations for the 2020-21 general fund revenue budget and agree the next step in the budgeting process

Decision Maker: Cabinet

Decision due date: 02/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/07/2019


01/07/2019 - Resident Involvement Framework    Recommendations Approved

To agree the proposals for the new resident involvement framework following consultation

Decision Maker: Cabinet

Decision due date: 02/2020

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 01/07/2019


31/05/2019 - GW1 Children's Centres 2020-23

To approve grants to lead agencies for the delivery of the children’s centres programme for 01/04/2020 – 31/03/2024

Decision Maker: Strategic Director of Finance and Governance

Decision due date: 03/2020

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 31/05/2019


31/05/2019 - Rotherhithe Movement Plan Lower Road creating two way streets including Cycleway 4

Report that provides the results of the public consultation and seeks approval to move to design and construction

Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency

Decision due date: 06/2020

Wards affected: Rotherhithe; Surrey Docks;

Lead officer: Sally Crew

Notice of decision: 31/05/2019


31/05/2019 - National non-domestic rates write offs over £50,000 - February 2020

Write off of any NNDR debts over £50,000

Decision Maker: Cabinet

Decision due date: 02/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 31/05/2019


31/05/2019 - Treasury Management Strategy 2020-21 including capital strategy, annual investment strategy, prudential indicators and annual medium revenue provision statement

To note the treasury management strategy and agree the capital strategy, investment strategy, capital financial and treasury indicators, and provisions for debt

Decision Maker: Council Assembly

Decision due date: 02/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 31/05/2019


31/05/2019 - Policy and Resources Strategy: capital monitoring report, including capital programme update 2019-20

To note the forecast capital outturn position, and to approve amendments to the capital programme

Decision Maker: Cabinet

Decision due date: 03/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 31/05/2019


31/05/2019 - Policy and Resources Strategy: revenue monitoring report, including treasury management 2019-20

To note the forecast revenue outturn position, including treasury management

Decision Maker: Cabinet

Decision due date: 03/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 31/05/2019


31/05/2019 - Setting the council tax 2020-21

To set the council tax levels

Decision Maker: Council Assembly

Decision due date: 02/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 31/05/2019


31/05/2019 - Policy and Resources Strategy 2020-21 to 2022-23 update

To agree a 2020-21 general fund revenue budget, including fees and charges

Decision Maker: Council Assembly

Decision due date: 02/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 31/05/2019


01/05/2019 - Gateway 2: Lost Peck Flood Alleviation & Environmental Improvement Scheme

Approval to procure scheme implementation through the EA’s Next Generation Supplier Arrangement (NGSA) subject to securing FDGIA funding

Decision Maker: Acting Strategic Director of Environment, Neighbourhoods and Growth

Decision due date: 02/2021

Wards affected: Peckham Rye;

Lead officer: Caroline Bruce

Notice of decision: 01/05/2019


01/05/2019 - Approval of the Housing Revenue Account Budget 2020-21 and rent setting    Recommendations Approved

To approve the HRA budget for 2020-21 and rent setting

Decision Maker: Cabinet

Decision due date: 01/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/05/2019


01/05/2019 - Policy and Resources Strategy 2020-21 to 2022-23 update

To note the council’s deliberations for the 2020-21 general fund revenue budget and agree the next step in the budgeting process

Decision Maker: Cabinet

Decision due date: 01/2020

Wards affected: (All Wards);

Lead officer: Duncan Whitfield

Notice of decision: 01/05/2019


01/05/2019 - Faith Strategy Action Plan

Report that outlines how we will deliver the faith strategy agreed in March 2019

Decision Maker: Cabinet

Decision due date: 01/2020

Wards affected: (All Wards);

Lead officer: Kevin Fenton

Notice of decision: 01/05/2019


01/04/2019 - GW2 - Approval of the procurement of contractor services 66 Linden Grove

Contract award approval

Decision Maker: Strategic Director of Housing

Decision due date: 08/2021

Wards affected: Nunhead & Queen's Road;

Lead officer: Michael Scorer

Notice of decision: 01/04/2019


01/04/2019 - GW2 - Approval of the procurement of Pre Contract Services Agreement (PCSA) for Sceaux Gardens (Phase 1)

Contract award approval

Decision Maker: Strategic Director of Housing

Decision due date: 09/2020

Wards affected: St Giles;

Lead officer: Michael Scorer

Notice of decision: 01/04/2019


01/04/2019 - Disposal of freehold interest in 4 D'Eynsford Road, London SE5

Dispose of the council’s freehold interest to facilitate the development of a new care home in support of the corporate commitment towards improved provision in the borough.

Decision Maker: Cabinet

Decision due date: 03/2020

Lead officer: Kevin Fenton

Notice of decision: 01/04/2019


01/03/2019 - Gateway 1: The Provision of Mental Health Supported Housing and Outreach Services

Report seeking approval for the procurement of the delivery of supported housing and homelessness services for people with mental health issues

Decision Maker: Cabinet

Decision due date: 06/2021

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 01/03/2019


01/02/2019 - Gateway 1: The provision of learning disabilities support and accommodation services

Report seeking approval for the procurement of the delivery of support and accommodation services for people with learning disabilities

Decision Maker: Cabinet

Decision due date: 03/2020

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 01/02/2019


01/10/2018 - Gateway 1 - Major Building Works    Recommendations Approved

Procurement Strategy Approval

Decision Maker: Cabinet

Decision due date: 07/2020

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 01/10/2018


01/06/2018 - GW2 Professional Technical Services

Contract award approval of the provision of professional technical services to the major works team on the delivery of the housing capital programme

Decision Maker: Cabinet Member for Council Homes and Homelessness

Decision due date: 07/2021

Wards affected: (All Wards);

Lead officer: Michael Scorer

Notice of decision: 01/06/2018


01/12/2017 - Peckham QHIP 2018-2019 - Batch 5

To approve the upcoming major works programme under JCT Framework tender.

Decision Maker: Strategic Director of Housing

Decision due date: 01/2020

Wards affected: Peckham;

Lead officer: Michael Scorer

Notice of decision: 01/12/2017


01/11/2017 - Elephant and Castle Centre Compulsory Purchase Order

To seek compulsory purchase powers that may be needed to secure the consented redevelopment of the Elephant and Castle Shopping Centre

Decision Maker: Cabinet

Decision due date: 03/2020

Wards affected: North Walworth; St George's;

Lead officer: Kevin Fenton

Notice of decision: 01/11/2017


01/11/2017 - Elephant and Castle shopping centre progress report

To provide the progress report called for by Cabinet on 9 May 2017 and to set out next steps to deliver a new shopping centre.

Decision Maker: Cabinet

Decision due date: 03/2020

Wards affected: North Walworth; St George's;

Lead officer: Kevin Fenton

Notice of decision: 01/11/2017


01/11/2017 - Gateway 2: Contract award approval - Southwark Athletics Centre Building (Main Contractor)

To approve the award of contract

Decision Maker: Strategic Director of Environment and Social Regeneration

Decision due date: 01/2020

Wards affected: Peckham Rye;

Lead officer: Rebecca Towers

Notice of decision: 01/11/2017


01/11/2017 - Gateway 2: Contract Award approval for the delivery of Mixed Tenure Development, Schools and Commercial units at Beormund School Site - Southwark Regeneration in Partnership - Lot A5

To approve the award of contract

Decision Maker: Cabinet

Decision due date: 06/2020

Wards affected: (All Wards);

Lead officer: Kevin Fenton

Notice of decision: 01/11/2017


03/03/2016 - Gateway 1: Procurement strategy approval - reablement services

Report seeking approval to procure a new supplier of reablement services

Decision Maker: Cabinet

Decision due date: 03/2020

Wards affected: (All Wards);

Lead officer: David Quirke-Thornton

Notice of decision: 03/03/2016