04/03/2021 - Gateway 2: Contract award approval for Cator Street 2 Main works - Stage 1 ref: 7313 Recommendations Approved
- Find out more about this decision (item 128)
- Share this item
To approve the award of the stage 1 contract for works in relation to Cator Street (2)
Decision Maker: Strategic Director of Housing
Decision published: 08/03/2021
Effective from: 16/03/2021
Decision:
1. That in consultation with the cabinet member for housing prior approval be formalised of the revised procurement strategy for the enabling works package as set out in paragraph 12 of the report.
2. That in consultation with the cabinet member for housing that the award of the pre-construction services agreement (PCSA), stage one of the design and build contract, for the construction of 50 extra care housing units, additional seven wheelchair units and a multi-purpose community space to Engie Regeneration Limited in the sum of £724,500 for a period of 30 weeks commencing on 16 March 2021 be approved.
3. That in consultation with the cabinet member for housing that the award of the enabling works package, to run concurrently with the PCSA, for the substation relocation to Engie Regeneration Limited for the sum of £370,500 be approved.
4. That in consultation with the cabinet member for housing that the client contingency sums as set out in paragraph 89 of the closed report be noted.
Wards affected: Peckham;
Lead officer: Michael Scorer
23/06/2020 - GW2: Canada Estate QHIP 17-18 ref: 7122 Recommendations Approved
- Find out more about this decision (item 127)
- Share this item
GW2: Contract award approval – Canada Estate QHIP
Decision Maker: Strategic Director of Housing
Decision published: 23/06/2020
Effective from: 01/07/2020
Decision:
That the award of the Canada Estate Phase 2 (2017-18) QHIP Works call-off contract via a mini-competition from the major works constructor framework to Durkan Ltd for a period of 60 weeks be approved.
Wards affected: Rotherhithe;
Lead officer: Michael Scorer
18/05/2020 - GW2 - Approval of the procurement of contractor services Sedgmoor Place ref: 7097 Recommendations Approved
- Find out more about this decision (item 126)
- Share this item
Contract award approval
Decision Maker: Strategic Director of Housing
Decision published: 18/05/2020
Effective from: 27/05/2020
Decision:
1. That the award of a works contract for 13 new homes at Sedgmoor Place SE5 to Neilcott Construction Limited for a period of 65 weeks including mobilisation be approved.
2. That it be noted the total scheme cost includes associated on-costs and a 5% contingency sum.
Wards affected: St Giles;
Lead officer: Michael Scorer
14/04/2020 - Home Owner Fund Budget and Reserve Proposal 2019 - 2020 ref: 7096 Recommendations Approved
- Find out more about this decision (item 125)
- Share this item
To approve the proposed 2019-20 Home Owners Fund.
.
Decision Maker: Cabinet Member for Housing Management and Modernisation
Decision published: 12/05/2020
Effective from: 20/05/2020
Decision:
1. That the proposed 2019-20 Home Owners Fund (HOF) budget of £375,133 as summarisedin Appendix 1 of the report be approved, following consultation with the Home Owner Fund Management Committee (HFMC) and the Home Owner Council (HOC).
2. That it be noted that – at the request of the previous cabinet member – the budget proposed for this year also includes proposals for expenditure of HOF reserves, meaning that expenditure exceeds revenue income, with the gap being filled by HOF reserves.
3. That it be noted that this approval is further subject to the requirement that expenditure involving the procurement of external services is subject to compliance with current internal governance requirements and procurement and financial practices as set out in paragraph 22 and in Appendix 2 of the report.
Wards affected: (All Wards);
Lead officer: Michael Scorer
24/04/2020 - Sydenham Hill 20mph consultation report Recommendations Approved
- Find out more about this decision (item 124)
- Share this item
That the Sydenham Hill 20mph scheme be approved for implementation, as shown in the draft outline design (Appendix A), subject to amendments proposed in the consultation summary report and the necessary statutory procedures.
Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency
Decision due date: 04/2020
Wards affected: Dulwich Wood;
Lead officer: Caroline Bruce
Notice of decision: 01/07/2019
01/04/2020 - GW2 - Approval of the procurement of contractor services - Salisbury Estate ref: 7040 Recommendations Approved
- Find out more about this decision (item 123)
- Share this item
Contract award approval
Decision Maker: Strategic Director of Housing
Decision published: 01/04/2020
Effective from: 09/04/2020
Decision:
That the award of a works contract for 26 new homes on land at Salisbury Close Estate, SE17 to Glenman Limited for a period of 83 weeks be approved.
Wards affected: North Walworth;
Lead officer: Michael Scorer
24/02/2020 - Council tax write-offs over £5,000 and under £50,000 ref: 7029 Recommendations Approved
- Find out more about this decision (item 122)
- Share this item
To approve a write-off of £190,458.64 of debt (multiple write-offs).
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision published: 25/02/2020
Effective from: 04/03/2020
Decision:
That the write offs of £190,458.64 of debt detailed in Appendix 1 of the report (multiple write-offs) be approved.
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
06/02/2020 - GW2: Fair Street (TMO Devon Mansions) QHIP 18-19 ref: 7019 Recommendations Approved
- Find out more about this decision (item 121)
- Share this item
Contract award approval
Decision Maker: Strategic Director of Housing
Decision published: 06/02/2020
Effective from: 14/02/2020
Decision:
That the award of the Fair Street Estate QHIP 2018/2019 call-off contract via a mini-competition from the major works constructor framework to Engie Regeneration Ltd for a period of 62 weeks be approved.
Wards affected: London Bridge & West Bermondsey;
Lead officer: Michael Scorer
08/01/2020 - Elephant and Castle Bakerloo Line Extension Recommendations Approved
- Find out more about this decision (item 120)
- Share this item
To consider funding issues
Decision Maker: Cabinet
Decision due date: 01/2020
Wards affected: North Walworth;
Lead officer: Kevin Fenton
Notice of decision: 01/08/2019
23/12/2019 - Gateway 0 - Strategic Options Assessment - Adult community specialist drugs and alcohol treatment services ref: 6986 Recommendations Approved
- Find out more about this decision (item 119)
- Share this item
Strategic options assessment approval
Decision Maker: Cabinet Member for Community Safety and Public Health
Decision published: 23/12/2019
Effective from: 09/01/2020
Decision:
That the strategic options assessment for the council’s adult community specialist drugs and alcohol treatment services be approved and the next steps set out in the report be noted.
Wards affected: (All Wards);
Lead officer: Kevin Fenton
23/12/2019 - Determination of Objections - Peckham West controlled parking zone ref: 6985 Recommendations Approved
- Find out more about this decision (item 118)
- Share this item
To determine objections to the statutory consultation
Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency
Decision published: 23/12/2019
Effective from: 09/01/2020
Decision:
i. That each of the grounds for objections and comments included in the correspondence be determined, in line with the reasoning in Appendix 1 of the report.
ii. That objections relating to certain design features be upheld and design changes made as detailed in Appendix 3 of the report and that otherwise the position and type of parking bays and restrictions be approved as shown in the detailed design (Appendix 2 of the report).
iii. That officers be instructed to write to each person who made representations to inform them of the council’s decision.
iv. That officers be instructed to make the necessary Traffic Management Order.
v. That officers be instructed to proceed with installation of the parking zone in the Peckham West area operating from Monday to Friday between 9am and 11am as per the in-principle approval of 7 August 2019, with estimated cost of £110,000 comprising of £80,000 for implementation works and £30,000 staff costs.
vi. That the decisions relating to further minor amendments to detailed engineering design be delegated to officers.
vii. That the objections to ‘stop and rest’ spaces in the carriageway be rejected and placeholders retained by way of double yellow lines provided and that the community be engaged on the potential use of the spaces after the zone is implemented.
viii. That officers be instructed to review the parking zone in six to nine months after implementation and to advise on whether operation days and times should be retained or amended in consideration of the consultation results.
Wards affected: Goose Green; Rye Lane;
Lead officer: Caroline Bruce
19/12/2019 - Gateway 2: Contract award approval Walworth Library and Southwark Heritage Centre (Design and Build) ref: 6982 Recommendations Approved
- Find out more about this decision (item 117)
- Share this item
To approve the award of contract for design and build contract in relation to 145 – 147 Walworth Road
Decision Maker: Acting Strategic Director of Environment, Neighbourhoods and Growth
Decision published: 19/12/2019
Effective from: 19/12/2019
Decision:
That the award of contract to Lendlease to deliver the Design and Build for Walworth Library and Southwark Heritage Centre to a value of £3,250,000 (including a 10% works contingency to be held by the client) to commence on 20 December 2019 for a period of 2 years be approved.
Wards affected: North Walworth;
Lead officer: Rebecca Towers
17/12/2019 - GW3 - Extension to the lift maintenance contract A&B ref: 6980 Recommendations Approved
- Find out more about this decision (item 116)
- Share this item
To agree a 2 year extension to the contract
Decision Maker: Cabinet Member for Housing Management and Modernisation
Decision published: 18/12/2019
Effective from: 04/01/2020
Decision:
1. That the variation of Contract A (north of the borough) Lift Maintenance Contract to Liftec Lifts Ltd (Liftec) to extend the term of the contract for a period of 2 years from 2 January 2020 at an estimated cost of £3.51m be approved.
2. That the variation of Contract B (south of the borough) Lift Maintenance Contract to Guideline Lift Services Ltd (Guideline) to extend the term of the contract for a period of 2 years from 2 January 2020 at an estimated sum of £2.72m be approved.
3. That the shortening of the notice period provision to be given to Liftec and Guideline from 6 months to 2 months for this variation be noted.
Wards affected: (All Wards);
Lead officer: Michael Scorer
11/12/2019 - Positive futures fund - Phase Two ref: 6978 Recommendations Approved
- Find out more about this decision (item 115)
- Share this item
Creation of the Positive Futures funding stream
Decision Maker: Cabinet Member for Community Safety and Public Health
Decision published: 11/12/2019
Effective from: 19/12/2019
Decision:
That the funding recommendations for phase 2 of the Positive Futures Fund, that aims to support community organisations to provide inspiring opportunities for young people that divert them away from crime be approved. These recommendations are set out in paragraph 29 of the report.
Wards affected: (All Wards);
Lead officer: Michael Scorer
05/12/2019 - Leathermarket Development Management - New Council Homes
- Find out more about this decision (item 114)
- Share this item
Approval of the overarching grant agreement with Leathermarket CBS to deliver 161 council homes.
Decision Maker: Cabinet
Decision due date: 17/12/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/05/2019
20/11/2019 - Rotherhithe and Surrey Docks CPZ ref: 6973 Recommendations Approved
- Find out more about this decision (item 113)
- Share this item
To approve the implementation of a CPZ with the Rotherhithe and Surrey Docks wards
Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency
Decision published: 20/11/2019
Effective from: 28/11/2019
Decision:
1. That the implementation of a new parking zone in the Rotherhithe and Surrey Docks area, operating Monday to Friday, 8.30am to 6.30pm and subject to the outcome of any necessary statutory procedures be approved.
2. That a further report be brought forward should there be any statutory objections to the traffic order required to implement the new parking zone.
3. That the position and type of parking bays and restrictions for the new parking zone and surrounding streets as shown in the outline design save for any amendments which may be required at the implementation stage be approved and would be determined by officers (Appendix B).
Wards affected: Rotherhithe; Surrey Docks;
Lead officer: Caroline Bruce
17/10/2019 - Gateway 2 - Contract Ward Approval - Works Contract for the New Home Delivery Programme - Rye Hill Park Garages, London SE15 ref: 6955 Recommendations Approved
- Find out more about this decision (item 112)
- Share this item
Contract award approval
Decision Maker: Strategic Director of Housing
Decision published: 22/10/2019
Effective from: 30/10/2019
Decision:
That the award of a works contract for Rye Hill park Garages, to Engie Regeneration Ltd for the contract sum of £6,039,681 commencing from 17 February 2020 for a period of 70 weeks be approved.
That the total scheme cost as detailed in paragraph 59 be noted.
Wards affected: Peckham Rye;
Lead officer: Michael Scorer
14/10/2019 - Supply Chain Fees and Charges for Adult Learning 2019-2020 ref: 6945 Recommendations Approved
- Find out more about this decision (item 111)
- Share this item
To approve the supply chain fees and charges for adult learning 2019-2020
Decision Maker: Cabinet Member for Jobs, Business and Innovation
Decision published: 22/10/2019
Effective from: 22/10/2019
Decision:
1. That the supply chain fees and charges of the grant funding allocation for the academic year 2019/20 be approved.
2. That the implementation date for the recommendation is 1 August 2019 (start of academic year 2019/20) be approved.
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
18/10/2019 - GW2 - Approval of the procurement of contractor services - Goschen Estate ref: 6946 Recommendations Approved
- Find out more about this decision (item 110)
- Share this item
Contract award approval
Decision Maker: Strategic Director of Housing
Decision published: 21/10/2019
Effective from: 29/10/2019
Decision:
1. That the award of a works contract for Goschen Estate to Guildmore Ltd. for the sum of £6,454,990, commencing 20 January 2020 for a period of 74 weeks from site possession until approximately 16 July 2021. The proposed works will provide 17 new units within two blocks, be approved.
2. That the scheme costs in paragraph 65 be noted.
Wards affected: Camberwell Green;
Lead officer: Michael Scorer
11/10/2019 - Changes to the Handypersons Service ref: 6943 Recommendations Approved
- Find out more about this decision (item 109)
- Share this item
To approve the increase in fees and charges for the Handyperson Service.
Decision Maker: Cabinet Member for Housing Management and Modernisation
Decision published: 11/10/2019
Effective from: 19/10/2019
Decision:
That the contents of the report be noted and the increase in fees and charges for the Handyperson Service be approved.
Wards affected: (All Wards);
Lead officer: Michael Scorer
09/10/2019 - GW2 - Approval of the procurement services - Haddonfield Estate ref: 6942 Recommendations Approved
- Find out more about this decision (item 108)
- Share this item
Contract award approval
Decision Maker: Strategic Director of Housing
Decision published: 10/10/2019
Effective from: 18/10/2019
Decision:
1. That the award of a works contract for 14 new homes on land at Haddonfield Estate, SE8 to Guildmore Ltd in the sum of £4,229, 439 for a period of 52 weeks be approved.
2. That the total scheme cost of £4,878,493 which includes associated on-costs of £437,582 and a 5% contingency sum of £211,472 be noted.
Wards affected: Rotherhithe;
Lead officer: Michael Scorer
09/10/2019 - GW2 Brimmington Estate Underground Mains Replacement QHIP 18-19 ref: 6941 Recommendations Approved
- Find out more about this decision (item 107)
- Share this item
Contract Award Approval
Decision Maker: Strategic Director of Housing
Decision published: 09/10/2019
Effective from: 17/10/2019
Decision:
That the award of the Brimmington District Heating Mains Replacement Programme QHIP 2018-19 via a mini-competition from the major works constructor framework to BSW Heating Ltd for a period of 44 weeks be approved.
Wards affected: Nunhead & Queen's Road;
Lead officer: Michael Scorer
01/10/2019 - GW2 Albert Barnes Plant Room & Warm Air Replacement QHIP 19-20 ref: 6939 Recommendations Approved
- Find out more about this decision (item 106)
- Share this item
Contract Award Approval
Decision Maker: Strategic Director of Housing
Decision published: 02/10/2019
Effective from: 09/10/2019
Decision:
That the award of the Albert Barnes House Plant Room Replacement and Internal Works QHIP 2019/20 via a mini-competition from the major works constructor framework to Vital Energi Utilities Ltd be approved for a period of 33 weeks.
Wards affected: Chaucer;
Lead officer: Michael Scorer
02/10/2019 - GW2 Masterman Plant Room, Boiler & Warm Air Replacement QHIP 19-20 ref: 6934 Recommendations Approved
- Find out more about this decision (item 105)
- Share this item
Contract Award Approval
Decision Maker: Strategic Director of Housing
Decision published: 02/10/2019
Effective from: 10/10/2019
Decision:
That the award of the Masterman Plant Room Replacement and Internal Works QHIP 2019-20 scheme via a mini-competition from the major works constructor framework to Vital Energi Utilities Ltd for a period of 33 weeks be approved.
Wards affected: Camberwell Green;
Lead officer: Michael Scorer
01/10/2019 - GW2 Four Squares / Rouel Road Plant Rooms & Water Tower QHIP 17-18 ref: 6936 Recommendations Approved
- Find out more about this decision (item 104)
- Share this item
Contract Award Approval
Decision Maker: Strategic Director of Housing
Decision published: 02/10/2019
Effective from: 10/10/2019
Decision:
That the award of the Rouel Road / Four Squares Plant Room and Water Tank Replacement Programme 2017-18 QHIP via a mini-competition from the major works constructor framework to BSW Heating Ltd for a period of 70 working weeks, be approved.
Wards affected: South Bermondsey;
Lead officer: Michael Scorer
27/09/2019 - Gateway 3 - Extension of the Kier Facilities management contract ref: 6932 Recommendations Approved
- Find out more about this decision (item 103)
- Share this item
Extension of the Kier facilities management contract for a period of up to 6 months
Decision Maker: Cabinet Member for Housing Management and Modernisation
Decision published: 30/09/2019
Effective from: 08/10/2019
Decision:
1. That the contract extension to the consolidated facilities management (FM) contract with Kier Facilities Services Ltd (Kier) for a period of up to 10 months, from 1 June 2020 to 31 March 2021, at an estimated total cost of £3.7m be approved.
2. That the start date 14 June 2016 to 31 March 2021 and the estimated total contract value of £18.5m be noted.
3. That the cabinet member for Housing Management and Modernisation notes that the break clause would be sought as part of the variation to allow for an earlier end to the contract as further detailed in paragraph 13 of the report.
Wards affected: (All Wards);
Lead officer: Michael Scorer
26/09/2019 - Southwark Pioneers Fund: Grants Programme Design ref: 6929 Recommendations Approved
- Find out more about this decision (item 102)
- Share this item
To approve the design of the grants programme for the Southwark Pioneers Fund
Decision Maker: Cabinet Member for Jobs, Business and Innovation
Decision published: 26/09/2019
Effective from: 04/10/2019
Decision:
That the Southwark Pioneers Fund grants programme (as set out in the report and at Appendices 1 – 3) be established.
Wards affected: (All Wards);
Lead officer: Stephen Gaskell
25/09/2019 - Establishing a Southwark Child and Adolescent Mental Health Commission ref: 6928 Recommendations Approved
- Find out more about this decision (item 101)
- Share this item
To establish a Southwark Child and Adolescent Mental Health Commission to consider, challenge, support and evaluate the actions being taken in the London Borough of Southwark to revolutionise and transform mental health support for children and families
Decision Maker: Cabinet Member for Children, Schools and Adult Care
Decision published: 25/09/2019
Effective from: 03/10/2019
Decision:
1. That an independent ‘Southwark Child and Adolescent Mental Health Commission’ be established to lead and coordinate evidence gathering of officers from the council, the NHS, schools, the voluntary sector and other key stakeholders implementing the recommendations from the Joint Review of Children and Young People’s Emotional Wellbeing & Mental Health Services.
2. That the Commission be formed and operate within the terms of reference that are set out in Appendix 1 of the report.
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
11/09/2019 - Revision to the policy, procedures and forms on directed surveillance and use of covert human intelligence sources under the Regulation of Investigatory Powers Act ref: 6927 Recommendations Approved
- Find out more about this decision (item 100)
- Share this item
To update the RIPA directed surveillance policy to ensure it remains fit for purpose.
Decision Maker: Cabinet Member for Community Safety and Public Health
Decision published: 16/09/2019
Effective from: 24/09/2019
Decision:
That the revised Policy attached at Appendix 1 of the report be approved.
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
04/09/2019 - GW2 - Approval of the procurement of contractor services - Rutley Close ref: 6923 Recommendations Approved
- Find out more about this decision (item 99)
- Share this item
Contract award approval
Decision Maker: Strategic Director of Housing
Decision published: 05/09/2019
Effective from: 13/09/2019
Decision:
1. That the award of a works contract for 39-44 Rutley Close, to Guildmore Ltd for the contract sum of £5,698,915 commencing from 9 December 2019 for a period of 84 weeks be approved.
2. That the total scheme costs as detailed in paragraph 59 of the report be noted.
Wards affected: Newington;
Lead officer: Michael Scorer
04/09/2019 - Gateway 2 - Contract Award Approval for East Dulwich Estate Environmental Works Phase 3 ref: 6922 Recommendations Approved
- Find out more about this decision (item 98)
- Share this item
Authority to award contract for the Phase 3 Environmental Works on East Dulwich Estate
Decision Maker: Strategic Director of Housing
Decision published: 05/09/2019
Effective from: 13/09/2019
Decision:
1. That the award of the contract to Blakedown Landscapes (SE) Ltd to carry out the Phase 3 environmental works across the East Dulwich Estate for a total value of £1,724,478 for the works contract for a period of 12 months commencing 15 October 2019 be approved.
2. That it be noted that the overall project comes to a total cost of £1,977,348 as detailed in paragraph 51 of the report.
Wards affected: Champion Hill;
Lead officer: Michael Scorer
14/08/2019 - Authorisation of Debt Write-offs of £5,000 up to £50,000 for Adult Social Care Division ref: 6921 Recommendations Approved
- Find out more about this decision (item 97)
- Share this item
Authorisation of debt write offs
Decision Maker: Cabinet Member for Children, Schools and Adult Care
Decision published: 14/08/2019
Effective from: 22/08/2019
Decision:
That the write off of £46,716.52 of debt as set out in Appendix 1 of the report be approved.
Lead officer: David Quirke-Thornton
13/08/2019 - Gateway 3: Continued access to London e-service for online sexual health testing ref: 6920 Recommendations Approved
- Find out more about this decision (item 96)
- Share this item
To approve continued access to the Pan London sexual health e-service and associated spend
Decision Maker: Cabinet Member for Community Safety and Public Health
Decision published: 13/08/2019
Effective from: 21/08/2019
Decision:
1. That a maximum spend on activity costs in the pan-London sexual health e-service, Sexual Health London (SHL), delivered by Preventx over the next 3-year period of the contract from 1 October 2019 to 30 September 2022 of £3,000,000, equivalent to £1,000,000 per annum be approved.
2. That an estimated spend on sexual health e-service related-costs (non-activity costs) over the next 3-year period of the contract from 1 October 2019 to 30 September 2022 of £75,000, equivalent to £25,000 per annum be approved.
3. That a continuation to the Inter-Authority Agreement (IAA) between the City of London Corporation and Southwark Council that enables Southwark to continue to access the pan-London sexual health e-service, Sexual Health London, delivered by Preventx, up to the maximum length of the contract be noted.
4. That approval for the maximum annual spend for years 6-9 of the e-service contract and non-activity-related costs (1 October 2022 – 14 August 2026) will be sought no later than July 2022, through a separate gateway report be noted.
Wards affected: (All Wards);
Lead officer: Kevin Fenton
07/08/2019 - Outdoor events policy refresh ref: 6918 Recommendations Approved
- Find out more about this decision (item 95)
- Share this item
To approve the policy refresh
Decision Maker: Deputy Leader and Cabinet Member for Culture, Leisure, Equalities and Communities
Decision published: 09/08/2019
Effective from: 17/08/2019
Decision:
That the new Outdoor Events Policy (Appendix 1 of the report) be approved.
Wards affected: (All Wards);
Lead officer: Rebecca Towers
09/08/2019 - Traffic Management Order (TMO) Electric Vehicle Rapid recharging bays - objection report ref: 6919 Recommendations Approved
- Find out more about this decision (item 94)
- Share this item
1. To consider the representation received during statutory consultation relating to the proposal to introduce three electric vehicle rapid recharging points in Webber Row in Southwark.
2. To instruct officers to write to the person who made a representation to inform them of the council’s decision.
3. To instruct officers to make the necessary Traffic Management Order.
4. To instruct officers to proceed with installation of the proposals set out in the report.
Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency
Decision published: 09/08/2019
Effective from: 17/08/2019
Decision:
i. That officers write to the person who made a representation to inform them of the council’s decision.
ii. That officers make the necessary traffic management order.
iii. That officers proceed with installation of the following proposals shown in Appendix A of the report:
· Reduction in the number of residents’ bays from twenty-two to nineteen.
· Relocate existing disabled bay by one space so the provision of electric charging bay apparatus is not too close to other street furniture.
· Install three electric vehicle rapid charging bays.
Wards affected: St George's;
Lead officer: Dale Foden
07/08/2019 - East Dulwich and Peckham West controlled parking zone ref: 6916 Recommendations Approved
- Find out more about this decision (item 93)
- Share this item
Approval to implement subject to statutory consultation
Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency
Decision published: 07/08/2019
Effective from: 15/08/2019
Decision:
1. That the current recommended CPZ is split into two separate areas known as East Dulwich CPZ, with zone operational hours of 8.30am to 6.30pm, and Peckham West CPZ, with zone operational hours of Mon-Fri and 9am to 11am.
2. The Peckham West CPZ to have the same boundaries as those proposed in the consultation process. The East Dulwich boundary is to reflect Dulwich Community Council feedback to the interim revised boundaries.
3. The implementation of each zone be subject to separate statutory consultation.
4. That decisions relating to further minor amendments to the detailed engineering design be delegated to officers.
5. That the statutory consultation be extended to longer than the minimum 21 days to allow consideration of the recommendations and to account for overlap with school holiday time if applicable.
6. That any representations that cannot be entirely dealt with be brought back to the cabinet member for determination.
7. That officers review the zone operation within six to nine months of implementation (subject to the outcome of necessary statutory procedures).
8. That the public realm improvements included in the scheme design under the healthy streets approach be noted.
9. That the financial implications of delivery detailed in the report be noted.
Wards affected: Dulwich Hill; Goose Green; Rye Lane;
01/08/2019 - Gateway 1 - Variation Decision - Engineering Inspection Contract
- Find out more about this decision (item 92)
- Share this item
Procurement Strategy Approval
Decision Maker: Strategic Director of Finance and Governance
Decision due date: 02/2020
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/08/2019
01/08/2019 - Public Space Protection Order Review - to tackle dog related anti-social behaviour Recommendations Approved
- Find out more about this decision (item 91)
- Share this item
To approve the recommendations resulting from a review of the introduction of the dog related Public Space Protection Order
Decision Maker: Cabinet
Decision due date: 01/2020
Wards affected: (All Wards);
Lead officer: Caroline Bruce
Notice of decision: 01/08/2019
01/08/2019 - Adopt London South - a hosted regional adoption agency
- Find out more about this decision (item 90)
- Share this item
Southwark to accept delegation of statutory duties for South London on behalf of 8 boroughs
Decision Maker: Leader of the Council
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 01/08/2019
01/08/2019 - Delegation of executive functions for the Cleaner Greener Safer Programme and Neighbourhoods Fund from community councils to ward forums
- Find out more about this decision (item 89)
- Share this item
To agree the devolution of decision making authority to ward councillors for the CGS budget
Decision Maker: Leader of the Council
Decision due date: 01/2020
Wards affected: (All Wards);
Lead officer: Caroline Bruce
Notice of decision: 01/08/2019
01/08/2019 - Spa Road Highway Improvements
- Find out more about this decision (item 88)
- Share this item
To approve the implementation of highway improvements on Spa Road subject to statutory consultation
Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency
Decision due date: 03/2020
Wards affected: London Bridge & West Bermondsey; South Bermondsey;
Lead officer: Caroline Bruce
Notice of decision: 01/08/2019
01/08/2019 - Rent arrears write offs over £5,000 and under £50,000
- Find out more about this decision (item 87)
- Share this item
Write offs of rent arrears debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/08/2019
01/08/2019 - GW2 Wyndham Estate Phase 1 QHIP 18-19
- Find out more about this decision (item 86)
- Share this item
Contract Award Approval
Decision Maker: Strategic Director of Housing
Decision due date: 01/2020
Wards affected: Camberwell Green;
Lead officer: Michael Scorer
Notice of decision: 01/08/2019
01/08/2019 - Delegate executive functions for Neighbourhoods Fund to ward councillors
- Find out more about this decision (item 85)
- Share this item
To approve devolved budget decisions to be taken by ward members
Decision Maker: Leader of the Council
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/08/2019
01/08/2019 - Connected Southwark (2021-23)
- Find out more about this decision (item 84)
- Share this item
Approval of the strategy
Decision Maker: Cabinet
Decision due date: 01/2021
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/08/2019
01/08/2019 - Canada Water Investment option
- Find out more about this decision (item 83)
- Share this item
To create a budget so that, should the council so wish, it will be able to invest in the Canada Water masterplan scheme
Decision Maker: Cabinet
Decision due date: 03/2020
Wards affected: Rotherhithe; Surrey Docks;
Lead officer: Kevin Fenton
Notice of decision: 01/08/2019
01/08/2019 - Gateway 1 Alternative Provision Procurement Strategy
- Find out more about this decision (item 82)
- Share this item
Procurement strategy for alternative provision in Southwark
Decision Maker: Cabinet
Decision due date: 03/2020
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 01/08/2019
01/08/2019 - Refresh of Southwark's Housing Strategy to 2043
- Find out more about this decision (item 81)
- Share this item
To agree the update of the Housing Strategy to take account of changes since the strategy was agreed in January 2015.
Decision Maker: Cabinet
Decision due date: 10/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/08/2019
01/08/2019 - Consultation on the future of South Dock Marina and boatyard Recommendations Approved
- Find out more about this decision (item 80)
- Share this item
To gain approval to proceed with full consultation on the future of South Dock Marina and boatyard
Decision Maker: Cabinet
Decision due date: 09/2019
Wards affected: Surrey Docks;
Lead officer: Caroline Bruce
Notice of decision: 01/08/2019
01/08/2019 - Architect Framework Recommendations Approved
- Find out more about this decision (item 79)
- Share this item
To approve the procurement strategy for delivering and Architect Framework
Decision Maker: Cabinet
Decision due date: 10/2019
Wards affected: (All Wards);
Lead officer: Kevin Fenton
Notice of decision: 01/08/2019
01/08/2019 - Housing Delivery Test Action Plan for Submission Recommendations Approved
- Find out more about this decision (item 78)
- Share this item
To agree the Housing Delivery Test Action Plan for submission to the Secretary of State
Decision Maker: Cabinet
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Kevin Fenton
Notice of decision: 01/08/2019
01/08/2019 - Corporate Asset Management Plan
- Find out more about this decision (item 77)
- Share this item
Refreshed strategy for the council’s property assets, aligned to delivering corporate priorities and services
Decision Maker: Cabinet
Decision due date: 03/2020
Wards affected: (All Wards);
Lead officer: Kevin Fenton
Notice of decision: 01/08/2019
01/08/2019 - Nunhead Acquisition of land for Housing Development Recommendations Approved
- Find out more about this decision (item 76)
- Share this item
To approve the acquisition of land in Nunhead for residential development
Decision Maker: Cabinet
Decision due date: 09/2019
Wards affected: Peckham Rye;
Lead officer: Kevin Fenton
Notice of decision: 01/08/2019
01/08/2019 - Old Kent Road Strategic Acquisition of Land Recommendations Approved
- Find out more about this decision (item 75)
- Share this item
To approve the acquisition of land on the Old Kent Road SE15 that is currently an investment but has medium term redevelopment options
Decision Maker: Cabinet
Decision due date: 09/2019
Wards affected: Old Kent Road;
Lead officer: Kevin Fenton
Notice of decision: 01/08/2019
01/08/2019 - New Homes Programme Recommendations Approved
- Find out more about this decision (item 74)
- Share this item
Update on the New Homes Development Programme
Decision Maker: Cabinet
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/08/2019
01/08/2019 - LBS Housing Rents Income Collection Policy (NEW) Recommendations Approved
- Find out more about this decision (item 73)
- Share this item
To note new rent income collection policy developed in response to Government welfare reform and Universal Credit
Decision Maker: Cabinet
Decision due date: 10/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/08/2019
01/08/2019 - Gateway 3 - Extension of the Interserve Facilities management contract Recommendations Approved
- Find out more about this decision (item 72)
- Share this item
Extension of the Interserve facilities management contract for a period of up to 11 months
Decision Maker: Cabinet
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/08/2019
01/08/2019 - Gateway 2: Parking and traffic enforcement and associated services Recommendations Approved
- Find out more about this decision (item 71)
- Share this item
Approval to procure a new parking and traffic enforcement contract to start April 2020
Decision Maker: Cabinet
Decision due date: 01/2020
Wards affected: (All Wards);
Lead officer: Caroline Bruce
Notice of decision: 01/08/2019
01/08/2019 - Gateway 2: Contract award approval for legal disrepair works
- Find out more about this decision (item 70)
- Share this item
To approve the award of contract
Decision Maker: Acting Strategic Director of Environment, Neighbourhoods and Growth
Decision due date: 11/2019
Wards affected: (All Wards);
Lead officer: Caroline Bruce
Notice of decision: 01/08/2019
01/08/2019 - Peckham QHIP 2018-19 Batch 5
- Find out more about this decision (item 69)
- Share this item
To approve the upcoming Major Works programme under JCT Framework tender
Decision Maker: Strategic Director of Housing
Decision due date: 11/2019
Wards affected: Peckham;
Lead officer: Michael Scorer
Notice of decision: 01/08/2019
01/08/2019 - Gateway 2 - Contract award approval - South Dock Marina: Lock Gates and Structural Works
- Find out more about this decision (item 68)
- Share this item
To approve the award of the contract
Decision Maker: Acting Strategic Director of Environment, Neighbourhoods and Growth
Decision due date: 01/2020
Wards affected: Surrey Docks;
Lead officer: Caroline Bruce
Notice of decision: 01/08/2019
01/08/2019 - Submission of TfL grant application (LIP programme) Recommendations Approved
- Find out more about this decision (item 67)
- Share this item
To agree the transport investment programme for submission to TfL (LIP submission)
Decision Maker: Cabinet
Decision due date: 10/2019
Wards affected: (All Wards);
Lead officer: Kevin Fenton
Notice of decision: 01/08/2019
01/07/2019 - Former tenant arrears write offs over £5,000 and under £50,000
- Find out more about this decision (item 66)
- Share this item
Write off of former tenant arrears debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency
Decision due date: 02/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/07/2019
01/07/2019 - Highways Capital programme devolved authority
- Find out more about this decision (item 65)
- Share this item
To agree the devolution of decision making authority to ward councillors for the CGS and Devolved Highways budget
Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Caroline Bruce
Notice of decision: 01/07/2019
01/07/2019 - Delegate executive functions for Neighbourhoods Fund to ward councillors
- Find out more about this decision (item 64)
- Share this item
To approve devolved budget decisions to be taken by ward members
Decision Maker: Leader of the Council
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/07/2019
01/07/2019 - Resident Involvement Framework Recommendations Approved
- Find out more about this decision (item 63)
- Share this item
To agree the proposals for the new resident involvement framework following consultation
Decision Maker: Cabinet
Decision due date: 02/2020
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/07/2019
01/07/2019 - Policy and Resources Strategy 2020-21 to 2022-23 update
- Find out more about this decision (item 62)
- Share this item
To note the council’s deliberations for the 2020-21 general fund revenue budget and agree the next step in the budgeting process.
Decision Maker: Cabinet
Decision due date: 10/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/07/2019
01/07/2019 - Gateway 2: Contract award approval for window repair works
- Find out more about this decision (item 61)
- Share this item
To approve the award of contract
Decision Maker: Acting Strategic Director of Environment, Neighbourhoods and Growth
Decision due date: 11/2019
Wards affected: (All Wards);
Lead officer: Caroline Bruce
Notice of decision: 01/07/2019
01/07/2019 - Policy and Resources Strategy 2020-21 to 2022-23 update Recommendations Approved
- Find out more about this decision (item 60)
- Share this item
To note the council’s deliberations for the 2020-21 general fund revenue budget and agree the next step in the budgeting process
Decision Maker: Cabinet
Decision due date: 02/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/07/2019
01/07/2019 - Housing benefit overpayment write offs over £5,000 and under £50,000
- Find out more about this decision (item 59)
- Share this item
Write offs of housing benefit overpayment debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 02/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/07/2019
01/07/2019 - National non-domestic rates write offs over £5,000 and under £50,000
- Find out more about this decision (item 58)
- Share this item
Write off of NNDR debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 02/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/07/2019
31/05/2019 - Rotherhithe Movement Plan Lower Road creating two way streets including Cycleway 4
- Find out more about this decision (item 57)
- Share this item
Report that provides the results of the public consultation and seeks approval to move to design and construction
Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency
Decision due date: 06/2020
Wards affected: Rotherhithe; Surrey Docks;
Lead officer: Sally Crew
Notice of decision: 31/05/2019
31/05/2019 - Former tenant arrears write offs over £5,000 and under £50,000
- Find out more about this decision (item 56)
- Share this item
Write off of former tenant arrears debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 12/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 31/05/2019
31/05/2019 - Rotherhithe Movement Plan Rotherhithe cycleway
- Find out more about this decision (item 55)
- Share this item
Report that provides the results of the public consultation and seeks approval to move to design and construction
Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency
Decision due date: 11/2019
Wards affected: Rotherhithe; Surrey Docks;
Lead officer: Sally Crew
Notice of decision: 31/05/2019
31/05/2019 - Cycle Superhighway 4 (between Rotherhithe roundabout and Hawkstone Road)
- Find out more about this decision (item 54)
- Share this item
Report that provides the results of the public consultation and seeks approval to move to design and construction
Decision Maker: Cabinet Member for Environment, Transport and the Climate Emergency
Decision due date: 11/2019
Wards affected: Rotherhithe;
Lead officer: Sally Crew
Notice of decision: 31/05/2019
31/05/2019 - GW1 Children's Centres 2020-23
- Find out more about this decision (item 53)
- Share this item
To approve grants to lead agencies for the delivery of the children’s centres programme for 01/04/2020 – 31/03/2024
Decision Maker: Strategic Director of Finance and Governance
Decision due date: 03/2020
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 31/05/2019
31/05/2019 - Gateway 2 (short form) - Contract award strategy - Removal of security grills and installation of new
- Find out more about this decision (item 52)
- Share this item
Contract awards
Decision Maker: Strategic Director of Housing
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 31/05/2019
31/05/2019 - National non-domestic rates write offs over £50,000 - February 2020
- Find out more about this decision (item 51)
- Share this item
Write off of any NNDR debts over £50,000
Decision Maker: Cabinet
Decision due date: 02/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 31/05/2019
31/05/2019 - Treasury Management Strategy 2020-21 including capital strategy, annual investment strategy, prudential indicators and annual medium revenue provision statement
- Find out more about this decision (item 50)
- Share this item
To note the treasury management strategy and agree the capital strategy, investment strategy, capital financial and treasury indicators, and provisions for debt
Decision Maker: Council Assembly
Decision due date: 02/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 31/05/2019
31/05/2019 - Policy and Resources Strategy: capital monitoring report, including capital programme update 2019-20
- Find out more about this decision (item 49)
- Share this item
To note the forecast capital outturn position, and to approve amendments to the capital programme
Decision Maker: Cabinet
Decision due date: 03/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 31/05/2019
31/05/2019 - Policy and Resources Strategy: revenue monitoring report, including treasury management 2019-20
- Find out more about this decision (item 48)
- Share this item
To note the forecast revenue outturn position, including treasury management
Decision Maker: Cabinet
Decision due date: 03/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 31/05/2019
31/05/2019 - Setting the council tax 2020-21
- Find out more about this decision (item 47)
- Share this item
To set the council tax levels
Decision Maker: Council Assembly
Decision due date: 02/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 31/05/2019
31/05/2019 - Policy and Resources Strategy 2020-21 to 2022-23 update
- Find out more about this decision (item 46)
- Share this item
To agree a 2020-21 general fund revenue budget, including fees and charges
Decision Maker: Council Assembly
Decision due date: 02/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 31/05/2019
31/05/2019 - Gateway 1 In house repairs 12 month review
- Find out more about this decision (item 45)
- Share this item
Note 12 month review of in-house repairs service
Decision Maker: Cabinet
Decision due date: 10/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 31/05/2019
31/05/2019 - Gateway 2 - Contract award approval for main works for Flaxyard and Peckham Library Square
- Find out more about this decision (item 44)
- Share this item
Authority to award contract to deliver new council homes on the Flaxyard and Peckham Library Square sites
Decision Maker: Strategic Director of Housing
Decision due date: 11/2019
Wards affected: Peckham;
Lead officer: Michael Scorer
Notice of decision: 31/05/2019
01/05/2019 - Gateway 2: Lost Peck Flood Alleviation & Environmental Improvement Scheme
- Find out more about this decision (item 43)
- Share this item
Approval to procure scheme implementation through the EA’s Next Generation Supplier Arrangement (NGSA) subject to securing FDGIA funding
Decision Maker: Acting Strategic Director of Environment, Neighbourhoods and Growth
Decision due date: 02/2021
Wards affected: Peckham Rye;
Lead officer: Caroline Bruce
Notice of decision: 01/05/2019
01/05/2019 - GW3: Extension to the Consolidated Facilities Management Contract
- Find out more about this decision (item 42)
- Share this item
Extension of the current contract
Decision Maker: Cabinet Member for Housing Management and Modernisation
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/05/2019
01/05/2019 - Approval of the Housing Revenue Account Budget 2020-21 and rent setting Recommendations Approved
- Find out more about this decision (item 41)
- Share this item
To approve the HRA budget for 2020-21 and rent setting
Decision Maker: Cabinet
Decision due date: 01/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/05/2019
01/05/2019 - Policy and Resources Strategy 2020-21 to 2022-23 update
- Find out more about this decision (item 40)
- Share this item
To note the council’s deliberations for the 2020-21 general fund revenue budget and agree the next step in the budgeting process
Decision Maker: Cabinet
Decision due date: 01/2020
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/05/2019
01/05/2019 - GW2: Contract Award for FM Contract for the council's operational estate
- Find out more about this decision (item 39)
- Share this item
Contract award approval
Decision Maker: Cabinet
Decision due date: 12/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/05/2019
01/05/2019 - Approach to community engagement Recommendations Approved
- Find out more about this decision (item 38)
- Share this item
Report that outlines how we will deliver the vision and principles agreed at April Cabinet
Decision Maker: Cabinet
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Kevin Fenton
Notice of decision: 01/05/2019
01/05/2019 - Faith Strategy Action Plan
- Find out more about this decision (item 37)
- Share this item
Report that outlines how we will deliver the faith strategy agreed in March 2019
Decision Maker: Cabinet
Decision due date: 01/2020
Wards affected: (All Wards);
Lead officer: Kevin Fenton
Notice of decision: 01/05/2019
01/04/2019 - GW2 - Approval of the procurement of contractor services 66 Linden Grove
- Find out more about this decision (item 36)
- Share this item
Contract award approval
Decision Maker: Strategic Director of Housing
Decision due date: 08/2021
Wards affected: Nunhead & Queen's Road;
Lead officer: Michael Scorer
Notice of decision: 01/04/2019
01/04/2019 - Gateway 2: Contract award approval for general building repair works
- Find out more about this decision (item 35)
- Share this item
To approve the award of contract
Decision Maker: Acting Strategic Director of Environment, Neighbourhoods and Growth
Decision due date: 10/2019
Wards affected: (All Wards);
Lead officer: Mick Lucas
Notice of decision: 01/04/2019
01/04/2019 - GW2 - Approval of the procurement of Pre Contract Services Agreement (PCSA) for Sceaux Gardens (Phase 1)
- Find out more about this decision (item 34)
- Share this item
Contract award approval
Decision Maker: Strategic Director of Housing
Decision due date: 09/2020
Wards affected: St Giles;
Lead officer: Michael Scorer
Notice of decision: 01/04/2019
01/04/2019 - Council tax write offs over £5,000 and under £50,000
- Find out more about this decision (item 33)
- Share this item
Write off of council tax debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 12/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/04/2019
01/04/2019 - Housing benefit overpayment write offs over £5,000 and under £50,000
- Find out more about this decision (item 32)
- Share this item
Write off of housing benefit overpayment debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 12/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/04/2019
01/04/2019 - National non-domestic rates write offs over £5,000 and under £50,000
- Find out more about this decision (item 31)
- Share this item
Write off of NNDR debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 12/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/04/2019
01/04/2019 - Policy and Resources Strategy 2020-21 to 2022-23 update
- Find out more about this decision (item 30)
- Share this item
To note the council’s deliberations for the 2020-21 general fund revenue budget and agree the next step in the budgeting process and the 2020-21 fees and charges.
Decision Maker: Cabinet
Decision due date: 12/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/04/2019
01/04/2019 - Council tax base 2020-21
- Find out more about this decision (item 29)
- Share this item
To set the council tax base and note that the NNDR base will be signed off by the s.151 officer
Decision Maker: Cabinet
Decision due date: 12/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/04/2019
01/04/2019 - Gateway 1: Care at Home - Additional Provision (adults) Recommendations Approved
- Find out more about this decision (item 28)
- Share this item
Report seeking approval to procure care at home additional provision (adults)
Decision Maker: Cabinet
Decision due date: 10/2019
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 01/04/2019
01/04/2019 - Annual Home Care Report Recommendations Approved
- Find out more about this decision (item 27)
- Share this item
Care at Home update
Decision Maker: Cabinet
Decision due date: 10/2019
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 01/04/2019
01/04/2019 - Disposal of freehold interest in 4 D'Eynsford Road, London SE5
- Find out more about this decision (item 26)
- Share this item
Dispose of the council’s freehold interest to facilitate the development of a new care home in support of the corporate commitment towards improved provision in the borough.
Decision Maker: Cabinet
Decision due date: 03/2020
Lead officer: Kevin Fenton
Notice of decision: 01/04/2019
01/04/2019 - Indicative HRA budget and rent setting 2020-21
- Find out more about this decision (item 25)
- Share this item
To note the draft HRA budget and indicative rent increase
Decision Maker: Cabinet
Decision due date: 12/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/04/2019
01/03/2019 - National non-domestic rates write offs over £50,000 - October 2019
- Find out more about this decision (item 24)
- Share this item
To write off any NNDR debts over £50,000
Decision Maker: Cabinet
Decision due date: 10/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/03/2019
01/03/2019 - Treasury Management - mid year update 2019-20
- Find out more about this decision (item 23)
- Share this item
To note treasury management operational activity at mid-year
Decision Maker: Council Assembly
Decision due date: 11/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 01/03/2019
01/03/2019 - Gateway 1: The Provision of Mental Health Supported Housing and Outreach Services
- Find out more about this decision (item 22)
- Share this item
Report seeking approval for the procurement of the delivery of supported housing and homelessness services for people with mental health issues
Decision Maker: Cabinet
Decision due date: 06/2021
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 01/03/2019
01/03/2019 - School Standards Yearly Report
- Find out more about this decision (item 21)
- Share this item
Report seeking to inform members of School Standards Yearly Report
Decision Maker: Cabinet
Decision due date: 12/2019
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 01/03/2019
01/03/2019 - Pupil Place Planning Report Recommendations Approved
- Find out more about this decision (item 20)
- Share this item
Report seeking to inform members as to the adequacy of provision of primary and secondary school places
Decision Maker: Cabinet
Decision due date: 10/2019
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 01/03/2019
01/02/2019 - Gateway 1: The provision of learning disabilities support and accommodation services
- Find out more about this decision (item 19)
- Share this item
Report seeking approval for the procurement of the delivery of support and accommodation services for people with learning disabilities
Decision Maker: Cabinet
Decision due date: 03/2020
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 01/02/2019
01/02/2019 - Housing allocations scheme
- Find out more about this decision (item 18)
- Share this item
Authorise the proposed housing allocations scheme to be the subject of a formal 12 week consultation period
Decision Maker: Cabinet
Decision due date: 01/2020
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/02/2019
02/01/2019 - Council tax write offs over £5,000 and under £50,000
- Find out more about this decision (item 17)
- Share this item
Write off of council tax debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
02/01/2019 - Former tenants arrears write offs over £5,000 and under £50,000
- Find out more about this decision (item 16)
- Share this item
Write off of former tenant arrears debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
02/01/2019 - Housing benefit overpayment write offs over £5,000 and under £50,000
- Find out more about this decision (item 15)
- Share this item
Write off of housing benefit overpayment debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
02/01/2019 - National non-domestic rates write offs over £5,000 and under £50,000
- Find out more about this decision (item 14)
- Share this item
Write off of NNDR debts over £5,000 but under £50,000
Decision Maker: Cabinet Member for Finance, Performance and Brexit
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
02/01/2019 - Policy and Resources Strategy 2020-21 to 2022-23 Recommendations Approved
- Find out more about this decision (item 13)
- Share this item
To note the outcomes and implications of the local government funding position for the council to agree the MTFS
Decision Maker: Cabinet
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
02/01/2019 - National non-domestic rates write offs over £50,000 - September 2019
- Find out more about this decision (item 12)
- Share this item
To write off any NNDR debts over £50,000
Decision Maker: Cabinet
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
02/01/2019 - Policy and Resources Strategy: revenue monitoring report, including treasury management 2019-20 Recommendations Approved
- Find out more about this decision (item 11)
- Share this item
To note the forecast revenue outturn position, including treasury management
Decision Maker: Cabinet
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
02/01/2019 - Policy and Resources Strategy: capital monitoring report, including capital programme update 2019-20 Recommendations Approved
- Find out more about this decision (item 10)
- Share this item
To note the forecast capital outturn position and to approve amendments to the capital programme
Decision Maker: Cabinet
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Duncan Whitfield
Notice of decision: 02/01/2019
30/11/2018 - Joint Strategic Needs Assessment on serious youth violence Recommendations Approved
- Find out more about this decision (item 9)
- Share this item
Interim youth report on joint strategic needs assessment and framework for public health approach to preventing youth violence
Decision Maker: Cabinet
Decision due date: 10/2019
Wards affected: (All Wards);
Lead officer: Kevin Fenton
Notice of decision: 30/11/2018
06/11/2018 - GW2: Print document management services
- Find out more about this decision (item 8)
- Share this item
Contract award for a replacement print document management service
Decision Maker: Cabinet Member for Housing Management and Modernisation
Decision due date: 09/2019
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/11/2018
01/10/2018 - Gateway 1 - Major Building Works Recommendations Approved
- Find out more about this decision (item 7)
- Share this item
Procurement Strategy Approval
Decision Maker: Cabinet
Decision due date: 07/2020
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/10/2018
01/06/2018 - GW2 Professional Technical Services
- Find out more about this decision (item 6)
- Share this item
Contract award approval of the provision of professional technical services to the major works team on the delivery of the housing capital programme
Decision Maker: Cabinet Member for Council Homes and Homelessness
Decision due date: 07/2021
Wards affected: (All Wards);
Lead officer: Michael Scorer
Notice of decision: 01/06/2018
01/11/2017 - Elephant and Castle Centre Compulsory Purchase Order
- Find out more about this decision (item 5)
- Share this item
To seek compulsory purchase powers that may be needed to secure the consented redevelopment of the Elephant and Castle Shopping Centre
Decision Maker: Cabinet
Decision due date: 03/2020
Wards affected: North Walworth; St George's;
Lead officer: Kevin Fenton
Notice of decision: 01/11/2017
01/11/2017 - Elephant and Castle shopping centre progress report
- Find out more about this decision (item 4)
- Share this item
To provide the progress report called for by Cabinet on 9 May 2017 and to set out next steps to deliver a new shopping centre.
Decision Maker: Cabinet
Decision due date: 03/2020
Wards affected: North Walworth; St George's;
Lead officer: Kevin Fenton
Notice of decision: 01/11/2017
01/11/2017 - Gateway 2: Contract award approval - Southwark Athletics Centre Building (Main Contractor)
- Find out more about this decision (item 3)
- Share this item
To approve the award of contract
Decision Maker: Strategic Director of Environment and Social Regeneration
Decision due date: 01/2020
Wards affected: Peckham Rye;
Lead officer: Rebecca Towers
Notice of decision: 01/11/2017
01/11/2017 - Gateway 2: Contract Award approval for the delivery of Mixed Tenure Development, Schools and Commercial units at Beormund School Site - Southwark Regeneration in Partnership - Lot A5
- Find out more about this decision (item 2)
- Share this item
To approve the award of contract
Decision Maker: Cabinet
Decision due date: 06/2020
Wards affected: (All Wards);
Lead officer: Kevin Fenton
Notice of decision: 01/11/2017
03/03/2016 - Gateway 1: Procurement strategy approval - reablement services
- Find out more about this decision (item 1)
- Share this item
Report seeking approval to procure a new supplier of reablement services
Decision Maker: Cabinet
Decision due date: 03/2020
Wards affected: (All Wards);
Lead officer: David Quirke-Thornton
Notice of decision: 03/03/2016